Seattle-Tacoma International Arrivals Facility Trade ... · WHY? WHAT? • New modern...

Post on 13-Jul-2020

2 views 0 download

Transcript of Seattle-Tacoma International Arrivals Facility Trade ... · WHY? WHAT? • New modern...

AWSS: Installation of architectural

roof over new Ashbury Heights

Tank

NFS: Exterior Envelope,

Station 31 Public Safety Building

Seattle-Tacoma International Arrivals

Facility

Trade Packages 2 - 8

Pre-Proposal Meeting

DESIGN BUILD ENJOY

International Arrivals Facility

Page 2

Project Team

• Jeffrey Brown, Director Aviation Facilities &

Capital Programs/Project Sponsor

Port of Seattle

• David Brush, Port Program Leader

Port of Seattle

• Noah Toomey, Design Manager

Clark Construction

• Martin McMahon, Construction Manager

Clark Construction

• Marc Marinchak, Schedule Manager

Clark Construction

• Eileen Francisco, Port of Seattle

• Janet Sheerer, Port of Seattle

• Lou Palandrani, Project Director

Clark Construction

• Marguerite Clark, Business Manager/

SBE Coordinator

Clark Construction

• Tina Smith, Procurement Coordinator

Clark Construction

International Arrivals Facility

Page 3

• Key to the growth of our Great Northwest

• Growth in international traffic – 13% year-over-year

• Federal Inspection Services (FIS) facility built in 1970’s

• Currently built to accommodate approximately 800 passengers – current demand is

as high as 2,000 passengers.

WHY?

WHAT? • New modern state-of-the-art facility for enhanced passenger experience.

• Improve the airlines’ abilities to operate efficiently.

• Provide for the 2025 demand of 2,600 passengers/hour.

• Passenger connection times between international and domestic flights.

International Arrivals Facility

Page 4

Subcontractors & Suppliers & Design Team

Progressive Design Build Delivery – Partnership with Port of Seattle

International Arrivals Facility

Page 5

• Package 2 – Structural Steel & Metal Decking

• Package 3 – Exterior Wall, Glazing, & Aluminum Panels

• Package 4 – Vertical Transportation & Moving Walkways

Design Assist Packages

Design Build Packages • Package 5 – Mechanical & Plumbing*

• Package 6 – Fire Protection

• Package 7 – Electrical & Fire Alarm System*

• Package 8 – Baggage Handling System * Co-Location Partners

International Arrivals Facility

Page 6

Overall Schedule

• Validation July 20th, 2015

• Design January 4th, 2016

• Procurement Key Trade Packages July 2016

• Construction January 2017

• Open New Facilities September 2019/June 2020

Page 7

Project Design Overview

International Arrivals Facility - SeaTac

Page 8

International Arrivals Facility

Page 9

International Arrivals Facility

Page 10

International Arrivals Facility

Page 11

Page 12

International Arrivals Facility

Page 13

International Arrivals Facility Marty M. & Marc M.

Page 14

International Arrivals Facility

Page 15

International Arrivals Facility

International Arrivals Facility

Page 16

• Bidder Overview

• Proposal Form

• Attachments to Proposal

• Appendix

• Subcontract Agreement

• Exhibit A – Contract Documents

• Exhibit B – Scope of Work –

Per Package

• Exhibit B1 – Package Specific

• Exhibit C – Payment &

Performance Bonds

.

RFP Package Contents • Exhibit D – Supplementary

Conditions

• Exhibit D-1 – Letter of Assent to

PLA

• Exhibit E – Insurance

Requirements

• Exhibit J – Owner Flow Down

Provisions

• Exhibit R – Release of Lien

• Logistics Plan – Parking &

Access Points

International Arrivals Facility

Page 17

RFP From Website Here

International Arrivals Facility

Page 18

Small/Diverse Business Participation – Scoring Factor

• Clark Construction Group & Port of Seattle

o History of Commitment and Core Values

o Community Development > Small Business Development

• Overall Project Goal -- 12% SCS Participation / SBE Participation 17.5% o Includes SBE/MBE/WBE/DBE/DVBE or Small and Diverse firms

o Small/Diverse Business Participation involves All Tiers

o Participation will be part of the Best Value Evaluation in proposals

o Each package has specific goals

• Clark SeaTac IAF Website Resource

o www.clarkseataciaf.com under the small business page.

o King County SCS Directory

• Small Business Meet & Greet August 4th, 2016 3:00 p.m. - 5:00 p.m.

International Arrivals Facility

Page 19

Subcontractor Suggested Opportunities – Scoring Factor

o Provide Innovative & Creative Ideas

o Support Performance & Quality Standards

o Result in Cost, Schedule & Operational Savings

Page 20

International Arrivals Facility

Completing & Submitting Proposals Each trade package shall include the following:

• Fully completed and executed Proposal Form (Attachment 1)

• Not to exceed proposal value.

• Letter from Surety confirming bondability

• Insurance Verification Letter

• PLA Letter of Assent (see subcontract Exhibit D-1)

• Completed “Proposers SCS/SBE Participation Summary”

(Attachment 2)

• Acknowledgement of receipt of issued Addenda.

• Detailed Proposal Analysis (Attachment 3)

• Subcontractor Suggested Opportunities From (Attachment 4)

Page 21

What’s Next for Trade Packages 2 – 8 Proposal Process

International Arrivals Facility

• Job Walk July 25th, 2016

• Small Business Meet & Greet August 4th, 2016

• RFP Bid Due Date August 23rd, 2016

• Interviews August 24th – September 2nd , 2016

• Contract Awards Mid September 2016

www.clarkseataciaf.com

International Arrivals Facility

Page 22

• Bring the project in below budget.

• Open new facility on-time in the fall of 2019.

• Encourage robust SCS/SBE participation

• Deliver an iconic passenger bridge from SSAT to the

new IAF

• A modern and efficient international passenger

processing facility using latest technology.

Future Goals

Page 23

International Arrivals Facility

Page 24

International Arrivals Facility

Page 25

International Arrivals Facility

Page 26

International Arrivals Facility