Post on 25-Mar-2020
San Rafael Shoreline - 1953
“CLIMATE ADAPTATION - SEA LEVEL RISE” SAN RAFAEL, CA
WHITE PAPER
January 2014
Prepared by the City of San Rafael
Department of Community Development Paul A. Jensen, AICP, Community Development Director
with the Assistance of Anais Hall, Sustainability Volunteer and The Department of Public Works
File No. P13-002
Climate Adaptation- Sea Level Rise White Paper 1 January 2014
EXECUTIVE SUMMARY This document presents a “white paper” on the topic of sea level rise. This topic has been a growing concern in the last decade as studies continue to report and confirm its direct connection to climate change associated with global warning. This paper was prepared as a ‘first step’ in responding to the San Rafael Climate Change Action Plan (CCAP), which was adopted in 2009. The CCAP includes several programs related to long-term planning for sea level rise, which recommend, among others, completing an inventory of the public and private levees throughout San Rafael and preparing a vulnerability assessment that would include recommended strategies for adaptation. A discussion of the CCAP and these programs is provided in Section III, page 11 of this paper. Section III (pages 12-14) also summarizes other measures that San Rafael has employed or identified to address flooding, drainage and sea level rise (GIS Map Guide System, San Rafael Creek canal dredging, and SMART Station Area Plans). This white paper is not a technical study nor is it a detailed quantitative analysis of sea level rise or its potential impacts on the community. Further, this paper does not present answers or solutions to sea level rise in San Rafael. Rather, this paper has been prepared to provide information that can be used in understanding this issue and moving forward to the next steps for long-range planning. This paper: a) identifies the key agencies that have been involved in studying and planning for this topic; b) presents the most current information and studies on sea level rise, particularly in the Bay Area; c) identifies potential funding sources to pursue for next steps; d) summarizes the studies underway in the Marin and the North Bay; e) describes techniques and tools that have been developed for adaptation; f) identifies the San Rafael shoreline and levees areas to study, as well as potential opportunity areas for studying adaptation; and g) presents suggestions for next steps in moving forward with preparing a vulnerability and long-term planning for sea level rise. There are a number of federal, state, regional and county agencies as well as one North Bay organization that are currently addressing or studying sea level rise and related issues such as flooding. These efforts are presented in Section II of this paper (pages 4-11). The Bay Conservation and Development Commission (BCDC) has been in the lead with its initial publication of sea level prediction maps in 2007. The BCDC maps predict that water levels in the Bay will raise 16-inches by 2050 and 55-inches by 2100. Also, at the regional level, the Association of Bay Area Governments (ABAG) and the Metropolitan Transportation Commission (MTC) have joined to prepare a Sustainable Communities Strategy (SCS) required by Senate Bill 375. Known as the Plan Bay Area, this SCS includes, among others, the formation of a Joint Policy Committee (JPC), which is a collaboration of four regional agencies working to develop: a) tools for conducting vulnerability and sea level rise assessments; b) a sea level adaptation strategy; and c) a funding plan for counties and local jurisdictions to plan for and assess sea level rise. At the federal level, the Federal Emergency Management Administration (FEMA) administers the flood hazard zone maps (FIRM), which are updated on-average every five years. The maps for the Central San Rafael basin are currently being updated. In response to the latest FIRM updates, FEMA will be recommending new regulations requiring higher finished floor elevations for structures. While this FEMA recommendation was in response to more detailed information available on tidal and wave action, this is some correlation to sea level rise. There is an abundance of studies, reports and assessments that have been prepared on sea level rise since the 2007 publication of the BCDC prediction maps. Section IV of this paper (pages 14-25) provides a summary of studies and assessment efforts that have been completed since the 2007, with the primary focus on the Bay Area. Most notable is a 2011 risk assessment pilot project completed for the Alameda County shoreline, which was sponsored by BCDC, MTC and Caltrans. Known as the “ART Project,” this pilot project has established a template for other pilot projects and for the preparation of vulnerability assessments. “SPUR,” a Bay Area-based, member-supported non-profit organization have completed several reports/publications. One of the publications (2009) identifies seven adaptive strategies for addressing sea level rise, which are suited to the Bay Area conditions.
Climate Adaptation- Sea Level Rise White Paper 2 January 2014
One of the biggest challenges to assessing and planning for sea level rise is funding. Section IV of this paper (pages 22-24) provides a list of available and possible funding sources for pursuing studies and adaptation. Funding sources and grant opportunities for studies include, among others: Government Issue (GI) bonds, the California Emergency Management Agency and FEMA, and the California Coastal Conservancy. Funding sources for construction (e.g., adaptation) include the US Army Corps of Engineers (funding shoreline restoration projects), the Coastal Conservancy and the North Bay Watershed Association. The major take-away regarding the availability of grants is that the City must have a current, adopted Multi-Hazard Mitigation Plan. These plans are required to be updated every five years. The City’s current Multi-Hazard Mitigation plan was last updated in the mid-2000’s, which must be updated.
There are a number of on-going pilot programs and studies underway in Marin County, which are discussed in Section V of this paper (pages 25-28). Most notable is the Richardson Bay Pilot Program, which was initiated by the Marin County Department of Public Works in 2010. Rather than focusing on assessing vulnerability, the pilot program has employed actual engineering concepts at bay front locations along the Richardson Bay. This program includes the Aramburu Beach/Island Restoration Project, the first demonstration project of its kind in the Bay Area. This demonstration project is designed to test natural shoreline approaches to monitor wind and wave erosion, as well as sea level rise. Further, Marin County Supervisor Kate Sears has initiated and is implementing a vulnerability assessment pilot program for the Tamalpais Valley and Marin City areas (Southern Marin Vulnerability Assessment Pilot Program). This pilot program primarily uses the BCDC “ART Project” template with a more “grassroots” approach that involves community input through all phases of this program. Closer to home, the County of Marin Department of Public Works is overseeing the Gallinas Watershed Program, which is studying flood protection and habitat restoration, which are both tied to planning for predicted sea level rise.
There have been a number of adaptation measures and tools that have been developed and tested to combat or plan for sea level rise. Section IV of this paper (pages 17-18 and 20-22) provides a description of some of the measures that have been developed, with some tested locally. Phillip Williams and Associates (now ESA-PWA), a Bay Area environmental planning and engineering firm has been in the forefront by introducing measures such as “retreat - levee relocation” (moving levees inland) and the “horizontal levee” (conversion of mudflats/tidelands to marsh). Other, more conventional measures include barriers (sea walls, tidal gates) and raising levees. The San Rafael shoreline and levees are diverse and there are expansive areas that are vulnerable to projected sea level rise. Section VI (pages 28-29) and Appendix A of this paper broadly identifies the shorelines and levees, which include areas of Downtown, the inner Canal (areas bordering the San Rafael Creek), the East San Rafael shoreline (encompassing the low-lying areas that were filled in the last century and border the Bay), areas of the San Pedro Peninsula and the Gallinas Creek basin. Please note that the properties and areas presented in Appendix A were not identified based on engineering studies or technical data, but on historic knowledge and familiarity with the community. This paper also includes potential opportunity areas in San Rafael that are worthy of study for adaptation. These areas are described in Section VI (pages 29-30) and in Appendix B of this paper. This paper presents a number of challenges that need to be acknowledged and considered before preparing a vulnerability assessment. As summarized in Section VII of this paper, long term planning for sea level rise cannot be done in isolation; it will require the collaborative effort of multiple agencies. Given the expanse of area that would be affected by predicted sea level rise, the number of stakeholders is substantial. Thirdly, the San Rafael shoreline and levee conditions substantially vary by neighborhood, so a “one-size-fits-all” approach is not possible. Further, there are limited City resources and funding. Lastly, this paper provides a list of suggested “next steps (see Section VIII, page 31), which include, among others, a City commitment to prioritize and staff the preparation of a vulnerability assessment.
Climate Adaptation- Sea Level Rise White Paper 3 January 2014
TABLE OF CONTENTS
Page
I. INTRODUCTION & PURPOSE 4 II. BACKGROUND 4
A. Federal Level 4 B. State Level 6 C. Regional & County Levels 9
III. BRINGING IT TO A LOCAL LEVEL- WHAT HAS SAN RAFAEL DONE TO DATE? 12
A. San Rafael Climate Change Action Plan & Sustainability Element 12 B. GIS (Map Guide) 12 C. San Rafael Creek - Canal Dredging 13 D. SMART Station Area Plans 14
IV. WHAT HAS BEEN STUDIED AND DEVELOPED IN MARIN, REGION AND BEYOND 14
A. Studies and Assessment Efforts Completed to Date 14 B. Lessons Learned from Completed Assessments 19 C. Approaches and Tools to Conducting a Vulnerability Assessment 19 D. Strategies in Managing Sea Level Rise 20 E. Funding Sources and Regulatory Requirements 22
V. CURRENT STUDIES AND STRATEGIES UNDERWAY IN MARIN 25
A. Richardson Bay Pilot Program 25 B. C-SMART 26 C. Marin Climate and Energy Partnership (MCEP) 26 D. Southern Marin (Vulnerability Assessment) Pilot Project 26 E. Gallinas Creek Watershed Program 27 F. BCDC Pilot Project for Priority Development Areas (PDA) 28
VI. ASSESSING LOCAL CONDITIONS & OPPORTUNITIES 28 A. Identifying San Rafael’s Levees and Shorelines 28 B. Identifying Adaptation Strategies Potentially Suitable for San Rafael 29 C. Identifying Potential Opportunity Areas for Adaptation 29
VII. CHALLENGES 30
VIII. NEXT STEPS 31
Appendices
Appendix A. San Rafael’s Levees and Shorelines Appendix B. San Rafael’s Possible Opportunity Areas for Adaptation Appendix C. Examples of Private Improvements Appendix D. Bibliography & Acknowledgements
Climate Adaptation- Sea Level Rise White Paper 4 January 2014
I. INTRODUCTION & PURPOSE In the past decade, there have been groundbreaking studies and an increased public awareness on the worldwide effects of climate change associated with global warming. Studies continue to document that global warming is continuing at progressive rates, which has been demonstrated by warmer and colder seasonal temperatures and patterns of more severe seasonal storm events. It is projected that sea levels will continue to rise as precipitation continues to increase and ice caps continue to melt. While we will not be able to stop the rise in sea levels resulting from these changes, we have the opportunity and must plan to adapt to this change. There are number of large geographic areas of San Rafael that are at risk for flooding and will be dramatically impacted by sea level rise. These geographic areas include valley floors, properties with low-lying elevations (some at sea level), and areas that are now filled and were once marshland. Most of these areas are developed so returning them to original, natural state is not a viable option. To this end, the effects of sea level rise, while viewed as a “climate” problem is a “people” problem; the focus must be on adaptation (e.g., to plan for and protect vulnerable populations and neighborhoods). Starting with the 'big picture,' there is a need to identify what is going to happen, how fast is it going to happen, and what can be done about it. The purpose of this paper is to: a) identify key agencies that have some level of oversight on this topic; b) provide a summary of resources and data prepared and available to date on the topic of sea level rise; c) preliminarily identify vulnerable areas in San Rafael that require further study, and potential areas for adaptation; d) report on what has been or is being studied and pursued in the Bay Area to date; and e) identify possible next steps for the City of San Rafael to complete a vulnerability assessment.
II. BACKGROUND As a global issue, sea level rise crosses over a number of federal, state, regional and county agencies. The following is a brief summary of the key agencies that are currently involved in studying and planning for this topic.
A. Federal Level Historically, local and county jurisdictions have relied on and deferred to the Federal Emergency Management Administration (FEMA) to document and map areas that are prone to flooding. Generally, every five-six years, FEMA updates and publishes maps (FIRM- Flood Insurance Rate Map) identifying flood prone areas and zones of vulnerability. As discussed below, the next update of the FIRM maps for the Central San Rafael basin will be completed and released in 2014. The FIRM maps delineate several flood zones, which are defined as follows:
Zones A, AE, AH, AO, AR, A99, V and VE (referenced as “Areas of Special Flood Hazard”)- areas subject to 1% chance of flooding in any given year (formerly referred to as the 100-year flood zone)
Zone X- areas subject to 0.2% chance of flooding in any given year and areas protected by levees from the 1% chance of flooding in any given year
Zone D- areas where flood hazards are undetermined
The FIRM maps play several critical roles. First, the maps are used by local and county agencies to identify and plan for local or area flood protection. Second, the maps are used by the banking and insurance industries to determine if flood insurance is mandated for a specific property or area. Lands located within the Areas of Special Flood Hazard require that flood protection insurance be secured for federally-funded loans. Lastly, the maps are used at the Federal (and State) level to plan for waterway projects that are administered by the US Army Corps of Engineers. The most current FIRM maps that are available were updated and published in 2009.
Climate Adaptation- Sea Level Rise White Paper 5 January 2014
There are numerous areas of San Rafael that are prone to flooding and are within the two FEMA flood zones. Areas within the flood zone are near or border waterways and are typically, low-lying, former diked baylands and marshlands. The larger, more significant flood prone areas include: the Central San Rafael Basin (southern portions of Downtown San Rafael extending from the San Rafael Canal/Creek westward to E Street, south including portions of Gerstle Park; Woodland Avenue area extending into portions of the Bret Harte neighborhood); Southeast San Rafael (the Canal neighborhood and greater East San Rafael residential and commercial areas including Spinnaker Point, Kerner Boulevard, Andersen Drive), San Pedro Peninsula (low-lying residential neighborhoods north of the San Rafael Canal including Summit Avenue/Marina Vista and Mooring Road, Loch Lomond Marina and low-lying areas of Peacock Gap); and the Gallinas Creek Basin (east of US101). A sample map of a portion of the East San Rafael area is provided in Figure 1 below. This map delineates areas within the Areas of Special Flood Hazard.
Figure 1: Southeast San Rafael Sample 2011 FEMA “Areas of Special Flood Hazard”
For all lands within the FEMA 100-year flood zone, construction is required to comply with elevation regulations. The 2009 FEMA regulations require a finished floor height elevation for buildings of +9.0 National Geodedic Vertical Datum (NGVD). This finished floor elevation requirement is applied to all new construction and is also required for substantial renovations or additions to existing buildings. As a matter of precaution, the City of San Rafael’s policy and practice is to require an additional 1-foot of elevation
Climate Adaptation- Sea Level Rise White Paper 6 January 2014
("freeboard") above the FEMA standard. More recently, the City has approved even higher finished elevation provisions to address potential sea level rise. For example, in the planning of the Village at Loch Lomond Marina development, an additional 1.5 feet of elevation was approved, over and above the additional "freeboard" typically required by the City. FEMA is in the process of updating the FIRM maps for Marin County. Updated maps have been completed for the Marin City/Tamalpais Valley and Ross Valley watershed areas. There is a small segment of San Rafael that is located within the Ross Valley watershed (portions of the Gerstle Park neighborhood) for which the City has received updated FIRM maps. These maps go into effect in March 2014. It is expected that the preliminary maps for the Central San Rafael basin will be completed in 2014. The map process will require that FEMA provide an appeal period which will allow for requests to adjust the mapping boundaries. The date of determination of the final FIRM maps and the effective dates of these maps will be in spring 2015. Following this round of FIRM map updates, FEMA will be changing the finished floor height elevation thresholds for flood zone delineation and federal requirements for protective levees. FEMA has reported that the new regulations (expected to be adopted for application next year) will require a finished floor height elevation of +10.00 NGVD, which is being administered to address, in part, more detailed and technical information available on tidal and wave action. Therefore, it is expected that the geographic boundaries of the flood zones will increase or change. In summary, the change in the FIRM maps and finished floor elevation thresholds will influence the following:
Regarding the Marin County shoreline levees, with the exception of the bayfront levee improvements being constructed by the US Army Corps of Engineers along the former Hamilton Airfield in Novato, none of the existing Marin bay front levees meet the predicted federal standards for height or type.
It is expected that with the FEMA updates, there will be a substantial increase in the flood insurance rates for properties within the Areas of Special Flood Hazard. The Biggert-Waters Flood Insurance Reform Act (2013) will result in increased insurance premiums.
B. State Level In 2006, the State Legislature passed and former Governor Arnold Schwarzengger signed AB 32, the Global Warming Solution Act of 2006. This action established a law mandating a statewide reduction of greenhouse gas (GHG) emissions by 2020. While AB 32 focuses on reducing GHG emissions, not rising sea levels, it was a landmark action as it is the first State law to establish mandates for combating global warming. Bay Conservation and Development Commission (BCDC) The Bay Conservation and Development Commission (BCDC) is a state agency that provides regulatory authority over the San Francisco Bay. Operating since 1970, BCDC: a) is responsible for implementing and enforcing the San Francisco Bay Plan (Bay Plan); and b) has review and permit authority over baylands and upland areas within 100 feet of the shoreline. In 2007, BCDC completed and published maps showing predictions for sea level rise in and around the San Francisco Bay for years 2050 and 2100. These maps are available on the BCDC website at http://www.bcdc.ca.gov/planning/climate_change/index_map.shtml. Given the limited yet evolving information that is available to date on this issue, there is still a great amount of uncertainty surrounding precise predictions on the extent on potential sea level rise. However, BCDC predicts, based on information available to date (FEMA flood zones, existing watersheds, and former tidelands/bay lands), that water levels in the San Francisco Bay will raise 16-inches by 2050 and 55-inches by 2100. It is important to note that BCDC includes a disclosure on its maps, which states, "For Informational Purposes Only." The intent of this disclosure is to ensure that they are not be used as a technical tool in making
Climate Adaptation- Sea Level Rise White Paper 7 January 2014
local land use decisions, but rather a precautionary resource to trigger further study when addressing projects in areas prone to potential sea level rise.
Figure 2- (Source: Argonaut Company- 2013)
To date, the City of San Rafael has used the BCDC maps as a reference in scoping and conducting environmental review on specific development projects. The BCDC maps identify four geographic areas of San Rafael that are vulnerable to projected sea level rise (see Figure 3), which are:
1. Central San Rafael Basin- includes San Rafael Canal/Creek and neighborhoods bordering the creek, and major portions of Downtown
2. Southeast San Rafael- includes Canal/Spinnaker Point/Baypoint residential areas and the greater commercial and light industrial areas around the I-580 corridor
3. San Pedro Peninsula- low-lying areas of Peacock Gap and Glenwood neighborhoods and
portions of residential neighborhoods bordering the Bay
4. North San Rafael- greater Gallinas Creek Basin from the Bay west to US 101
Climate Adaptation- Sea Level Rise White Paper 8 January 2014
Figure 3: Cal-adopt.com BCDC (2007), USGS and Pacific Institute
In addition to the sea level prediction maps, BCDC has been developing a "toolbox" of basic recommendations and adaptive strategies for local agency and regional use (discussed below in Section IV).
In 2008, BCDC prepared a vulnerability assessment, Living With A Rising Bay: Vulnerability And Adaptation In San Francisco Bay And On the Shoreline, that identifies: (1) key Bay systems, both in the natural and the built environment; (2) the stressors they presently face; (3) the potential impacts due to sea level rise and coastal flooding; (4) the sensitivity of the systems to these impacts; and (5) their adaptability. Integral to preparation of the assessment was research on sea level rise inundation in the Bay Area by the United States Geological Survey (USGS) and an analysis of the socioeconomic impacts of that potential inundation by the Pacific Institute. The results show that approximately 180,000 acres of shoreline are vulnerable to flooding following a 16-inch rise in sea level, and more than 213,000 acres following a 55-inch rise in sea level, potentially flooding over a quarter-million of the Bay’s residents. The replacement value of the resources at risk is about $62 billion.
Climate Adaptation- Sea Level Rise White Paper 9 January 2014
BCDC has taken a lead in developing a Local Government Adaptation Assistance Program (AAP) to provide information and resources to Bay Area local and regional governments to assist them in planning for and adapting to the impacts of a changing climate. These outreach efforts primarily focus on addressing the needs of land use planning, public works, park and open space districts, flood control districts and wastewater authorities, as well as resource-based managers. The long-term goal of the AAP is to help San Francisco Bay Area communities achieve coordinated and region wide adaptation to climate change impacts. The AAP contributes to this goal by building capacity within local governments to assess climate change issues, and to plan for and implement adaptation strategies.
BCDC has identified five broad program components for accomplishing these AAP objectives: (1) building partnerships that cut across jurisdictional boundaries, both geographic and sectorial; (2) public outreach to build community and institutional support for adaptation planning; (3) education to help planners and managers develop knowledge and skills for adaptation planning; (4) creation of a “one-stop shop” website and information clearinghouse; and (5) development and dissemination of strategies to improve the region’s resilience and adaptive capacity.
California Coastal Commission The California Coastal Commission (est. 1976) is a state agency that provides planning and regulatory authority over the California coastline and points inland. The California Coastal Act (1972) requires that a Local Coastal Plan (LCP) be developed by each county in California that borders the coast. The LCP for Marin County has been incorporated into the Marin Countywide Plan. In November 2012, the California Coastal Commission prepared and released its Draft Sea Level Rise Guidance. This draft guidance document provides recommendations for local governments, applicants and others on how to address sea level rise in Local Coastal Programs and Coastal Development Permits. Further, this guidance explains the importance of using the best available science on sea level rise, avoiding hazards and protecting coastal habitats. This guidance can be accessed at http://www.coastal.ca.gov/climate/SLRguidance.html. The following are some of the guidance tools presented in this document:
Acknowledge and address sea level rise as necessary in planning and permitting decisions Use the best available science to determine locally-relevant sea level rise projections, as well
as the range of the projections for the study area Assess the potential risks from sea level rise to resources and development Avoid significant coastal hazard risks where feasible (e.g., areas of flooding or geologic
instability) Minimize the hazard risk to new development over the life of the structures Account for the social and economic needs of people Property owners should assume the risks associated with new development in hazard areas Consider conducting vulnerability assessments and adaptation planning at the regional level Provide for maximum public participation in planning and regulatory processes
While the San Rafael bayfront is not within the coastal zone, this guidance provides some good recommendations that can be applied to future planning for sea level rise along the bayfront.
C. Regional & County Levels Plan Bay Area- Strategy for a Sustainable Region The Bay Area, which encompasses nine counties, is served by a number of regional agencies, including the Association of Bay Area Governments (ABAG) and Metropolitan Transportation Commission (MTC). ABAG and MTC manage, administer and oversee regional planning and transportation matters. In 2008, Governor Schwarzenegger signed Senate Bill 375 (SB 375), which promoted a direct linkage of regional transportation plans (RTP) with the statewide goals to reduce GHG emissions (AB 32). SB 375 requires that metropolitan transportation organizations (such as MTC) develop a Sustainable Communities
Climate Adaptation- Sea Level Rise White Paper 10 January 2014
Strategy (SCS), which is to serve as a new element of the RTP. The goal of the SCS is to reach a GHG reduction target for each region. The transportation target for the Bay Area is a seven percent (7%) GHG reduction per capita by 2020 and a 15% reduction per capita by 2040. For the Bay Area region, the SCS process involves a partnership of four regional agencies: a) MTC; b) ABAG; c) the Bay Area Air Quality Management District (BAAQMD); and d) the Bay Conservation and Development Commission (BCDC). MTC and ABAG lead the SCS effort with the preparation of the “Plan Bay Area- Strategy for a Sustainable Region” (Plan Bay Area). The final Plan Bay Area was adopted by MTC and ABAG on July 18, 2013. While most of the Plan Bay Area addresses ways to achieve reductions in GHG emissions through tools such concentrated growth (“Priority Development Areas”) and funding strategies to promote increased transit use, it includes a section addressing climate adaptation and sea level rise. The Plan promotes, endorses and commits to regional efforts through a Joint Policy Committee (JPC) comprised of representatives from MTC, ABAG, BCDC and the Bay Area Air Quality Management District (BAAQMD). The JPC is commissioned to work collectively to conduct vulnerability and risk assessments, a sea level adaptation strategy, and develop a Transportation Asset Management Plan (TAMP) to provide funding to counties and local jurisdictions for planning and assessments.
In 2011, the JPC was given direction to produce a Bay Area Climate and Energy Resilience Project to provide guidance on how to include protecting the Bay Area’s economy, public health, infrastructure and ecosystems from sea-level rise, water shortages, high energy prices and other impacts in long-term regional and local planning, including Plan Bay Area. In May 2013, the project was completed presenting a six-month Needs Assessment and a proposed Action Plan. The findings from the Needs Assessment are contained in five reports:
Stakeholder Interview Summary (including an inventory of nearly 100 Bay Area projects)
Mapping Our Future: A Work Plan for Public Engagement and Social Equity
Bay Area Integrated Win-Win Strategies (Resilience + GHG reduction)
What’s Going to Happen and What Can We Do About It? (Science information for decision-makers)
Effective Governance for Multi-Jurisdictional, Multi-Sector Climate Adaptation
The 12-Month Action Plan outlines a five-point plan to significantly accelerate and strengthen Bay Area adaptation planning. The plan will now be used to engage funders and supporters in discussions on moving forward. The reports and action plan can be accessed at http://www.cakex.org/directory/organizations/bay-area-joint-policy-committee.
In September 2012, the JPC adopted a work plan to develop a Regional Sea Level Rise Adaptation Strategy. The objective of this project is to ensure the on-going health and ecological viability of regional natural resources, such as San Francisco Bay; coordinate adaptation mechanisms that transcend local jurisdictional boundaries; and share the costs of adaptation responses at a regional level, especially when regional resources are involved. The sea level rise adaption strategy work plan focuses on providing enough background information and support to develop a “bottom-up” regional strategy where the regional agencies work with local entities to assess vulnerabilities and risks, identify critical assets, explore adaptation options, and use a balanced approach to identify costs, benefits and adaptation strategies for the natural resources/ecosystem services provided by the Bay and its watersheds. The lessons learned from these collaborative efforts will be used to inform the second iteration of Plan Bay Area and be fully integrated into the third iteration. County of Marin The County of Marin Department Public Works (including Flood Control) takes the lead on addressing countywide issues related to flood control/protection and water quality. More recently, some of this work has transitioned into addressing sea level rise. The County manages over nine flood control zones,
Climate Adaptation- Sea Level Rise White Paper 11 January 2014
including two in the North San Rafael area (Zones 6 and 7), which cover both incorporated and unincorporated lands in the Gallinas Creek Watershed. These are independent assessment districts formed for the sole purpose of addressing flood control. In 2008, the Marin County Watershed Program was initiated as a project of the Marin County Department of Public Works. This watershed program covers all major developed watersheds in Marin including: San Antonio/Novato Creek, Gallinas Creek, Ross Valley, Richardson Bay, and Stinson Beach. The goals of this program are as follows:
• Partner with local municipalities, agencies, and non-profits • System-wide analysis of flood protection options • Identify multi-benefit type projects • Protect, enhance and restore habitat and water quality • Improve efficiency of flood control maintenance operations • Evaluate the beneficial re-use of dredged material • Identify sea level rise adaptation strategies • Work with the natural watershed processes
The base of this program is stakeholder engagement. The program utilizes three working groups/committees which are: a) a Policy Advisory Committee (includes decision makers); b) a Technical Working Group (technical staff); and c) an Operations and Finance Committee (committee seeks out funding sources). Some of the goals are to develop models and other tools, potential alternatives and funding strategies. The funding partners include, among others, the County of Marin, the City of San Rafael, the City of Novato, the City of Mill Valley and several of the flood control and service districts. A 10-year work plan has been developed for this program, which includes the Gallinas Watershed Program. This project is discussed under Section V of the paper (Current Studies and Strategies Underway in Marin). For more information on the Marin County Watershed Program, please see the Marin County website at www.marinwatersheds.org.
1
North Bay Watershed Association (NBWA)
While not a regulatory agency, the North Bay Watershed Association (NBWA) is a membership group of 16 regional and local public agencies located throughout Marin, Sonoma, and Napa counties. NBWA is committed to crafting a set of regional approaches to the problems and issues associated with managing the North Bay watersheds. The mission of NBWA is to facilitate partnerships across political boundaries that promote stewardship of the North Bay watershed resources.
The NBWA was created to help regulated local and regional public agencies work cooperatively on water resources issues that impact areas beyond traditional boundaries in order to promote stewardship of the North Bay watershed. Agencies participate in the NBWA in order to discuss issues of common interest, explore ways to work collaboratively on water resources projects of regional concern, and share information about projects, regulations, and technical issues. More recently, NBWA has been in the forefront of researching and addressing sea level rise. In 2013, NBWA commissioned PRBO, environmental consultants to prepare a report on adapting to sea level rise. This report is summarized in Section IV below. At present, the City of San Rafael is not a member of NBWA. The City’s membership was not renewed several years ago.
1 Meeting with Marin County Department of Public Works; December 16, 2013
Climate Adaptation- Sea Level Rise White Paper 12 January 2014
III. BRINGING IT TO A LOCAL LEVEL- WHAT HAS SAN RAFAEL DONE TO DATE?
A. San Rafael Climate Change Action Plan & Sustainability Element In response to AB 32, in 2008, the City of San Rafael embarked on preparing a Climate Change Action Plan (CCAP). The CCAP was prepared with the assistance and participation of a Green Ribbon Committee and stakeholders. Adopted in 2009, the City of San Rafael CCAP sets forth steps and implementing measures to combat and/or adapt to climate change. The “Our Environment” section of the CCAP the implementing measures that are specific to sea level rise are as follows: Monitor sea level rise and plan for shoreline defense
EN7: Develop a program of levee analysis, including inventorying heights, testing and maintaining public and private levees.
EN8: Install a sea level monitoring gauge to track changes over time.
Increase understanding and preparation for the effects of climate change
EN9: Participate in Marin County’s regional vulnerability assessment, and prepare a local vulnerability assessment for San Rafael.
EN10: Continue to provide emergency planning and community awareness.
In 2011, the City folded the CCAP into the San Rafael General Plan 2020 by adopting a new Sustainability Element. The Sustainability Element includes the following policies and programs:
Policy SU-14. Adapting to Climate Change. Increase understanding and preparation to adapt to the effects of climate change, including sea level rise. Program SU-14a. Vulnerability Assessment. Participation in Marin County’s regional vulnerability assessment and prepare a local vulnerability assessment for San Rafael. Program SU-14c. Levee Analysis. Develop a program of levee analysis, including inventorying heights, testing and maintaining public and private levees. Program SU-14d. Sea Level Monitoring and Planning. Work with the Bay Conservation and Development Commission (BCDC) to monitor sea level rise and plan for shoreline defense.
The stakeholders involved in the initial CCAP process meet quarterly to discuss the City’s progress on implementing the CCAP programs. The CCAP group is tracking progress on addressing sea level rise. However, to date, limited progress has been made to initiate the above implementing programs. Most of these programs must be initiated, managed and completed by the City Department of Public Works, which would require budgeted funds in the future, as progress is made on this topic. Therefore, in order for the issue of sea level rise to be initiated, studied, and addressed, adequate funding for City staff (primarily Public Works Department) and the City’s Capital Improvement Program would need to be identified and prioritized.
B. GIS (Map Guide) System The City utilizes a GIS software program, which provides mapping of the City and the neighboring unincorporated area that is linked and shared with the County of Marin GIS system (www.marinmap.org). The GIS system provides electronic mapping of the City and the neighboring unincorporated areas and is programmed to provide assessor parcel based data such as property zoning, land use, property ownership, parcel size, etc. The program includes FEMA flood zone information. The GIS will be updated to incorporate the updated FEMA flood zone mapping that is currently being prepared.
Climate Adaptation- Sea Level Rise White Paper 13 January 2014
At present, the GIS system is accessible on the City's internal network only, and cannot be accessed externally from the City's website. This system provides an opportunity to serve as a repository for mapping sea level rise data, as it becomes available.
RAFAEL
CLAYTON
ST
ST
HA
YE
S
FIRST
ST
FRANCES
TREANOR
SH
AV
ER
SECOND
WA
RN
ER
STWOODLAND
STREET
WIL
LO
W
WO
OD
LA
ND
PL
ALBERT
MA
RIP
OS
A
AVENUE
LANE
CT
RD
PARK
LIN
DA
RO
STREET
ST
RE
ET
A
STREET
BAYVIEW
ST
RE
ET
WO
OD
SS
T
LO
OT
EN
S
AVENUE
STREET
WE
LC
H
ROSS
STREET
D
BR
OO
KS
ST
LATHAMST
ST
RE
ET
CO
TT
AG
E
MISSION
JULIA
AVE
STRE
ET
ST
PLC
OU
RT
LAUREL
AV
E
SAN
AVE
AV
E MIR
AM
AR
G
LUNNY
ST
RE
ET
ST
THIRD COMMERCIAL
JORDAN
MARTENS
OCTAVIA
ELFORD
ST
RE
ET
MA
RIN
ST
RE
ET
AVE
C
STREET
TAYLOR
ST
RE
ET
ST
SECOND
DUFFY
STREET
PLACE
DU
AVENUE
ST
RE
ET
LIN
CO
LN
CIJ
OS
RITTER
PL
THIRD
ST
IRW
INTA
MA
LP
AIS
HE
TH
ER
TO
N
GR
AN
D
DR
FRANCISCO
STREET
STREET
DR
FO
RB
ES
F
FOURTH
LANE
ST
RE
ET
AV
E
FIFTH
ST
RE
ET
ST
RE
ET
ST
WIL
KIN
S
STREET
AVENUE
ST
RE
ET
ST
RE
ET
ST
RE
ET
AVENUE
FIFTH
FOURTH
NY
E
PLACE
ST
EV
EN
S
AV
E
ST
PACHECO1
01
ST
ST
ST
AVENUE
AV
EN
UE
BELLE
HIG
HW
AY
JONES
PL
IVY LANE
C
B
EMISSION
AVE
STREET
ST
ST
ST
RO
SS S
TR
EE
TT
ER
RA
CE
RAFAE L
GR
EE
N W
AY
ANDERSEN
DRIVE
VIA SESSI
11
04
11
04
11
04
11
04
11
04
30
130
130
130
130
132
332
332
332
332
3
31
731
731
731
731
731
931
931
931
931
9
31
331
331
331
331
3
30
930
930
930
930
9
47
547
547
547
547
5
20
420
420
420
420
4
33333
55555
77777
20
120
120
120
120
1
15
315
315
315
315
3
14
514
514
514
514
5
1010101010
47
47
4747
47
51
51
5151
51
53
53
5353
53
50
50
5050
50
6060606060
6262626262
56
56
5656
56
209209209209209
211211211211211
12
412
412
412
412
4
12
212
212
212
212
2
11
811
811
811
811
8
14
014
014
014
014
014
714
714
714
714
7
12
512
512
512
512
5
12
712
712
712
712
7
13
113
113
113
113
1
13
513
513
513
513
5
13
713
713
713
713
7
13
913
913
913
913
9
150150150150150
142142142142142
116116116116116 3
38
33
833
833
833
8
33
433
433
433
433
4
33
233
233
233
233
2
32
832
832
832
832
8
32
232
232
232
232
2
31
431
431
431
431
4
31
731
731
731
731
7
31
931
931
931
931
9
32
132
132
132
132
1
32
332
332
332
332
3
33
333
333
333
333
3
33
733
733
733
733
734
134
134
134
134
1
34
734
734
734
734
7
106106106106106
104104104104104
100100100100100 4
242
4242
42
36
36
3636
36
32
32
3232
32
24
24
2424
24
18
18
1818
18
16
16
1616
16
111111111111111
119119119119119
127127127127127
139139139139139
145145145145145
153153153153153
163163163163163
151151151151151
135135135135135
131131131131131
11
11
1111
11
15
15
1515
1519
19
1919
1923
23
2323
2325
25
2525
2531
31
3131
3133
33
3333
33
35
35
3535
3545
45
4545
45
52
752
752
752
752
7
52
352
352
352
352
3
122122122122122 1
714
17
14
17
14
17
14
17
14
17
10
17
10
17
10
17
10
17
10
301301301301301 304304304
304304
16
18
16
18
16
18
16
18
16
18
10
810
810
810
810
8
27
27
2727
27
35
35
3535
35
1818181818
6060606060
5858585858
5252525252
24
224
224
224
224
2
23
823
823
823
823
8
23
023
023
023
023
0
22
622
622
622
622
6
21
021
021
021
021
0
20
620
620
620
620
6
20
420
420
420
420
4
24
24
2424
24
22
22
2222
2228
28
2828
28
1818181818
44444
2222211
11
1111
1117
17
1717
17
504504504504504
22
22
2222
22
14
14
1414
14
12
12
1212
12
88 888 44 444
501501501501501
496496496496496
55 55577 777
11
11
1111
11
15
15
1515
1517
17
1717
17
19
19
1919
1923
23
2323
2327
27
2727
2733
33
3333
3335
35
3535
35
10
110
110
110
110
1
10
510
510
510
510
5
10
710
710
710
710
7
334334334334334332332332332332
320320320320320318318318318318
316316316316316304304304304304
15
15
1515
15
17
17
1717
1721
21
2121
2123
23
2323
2327
27
2727
2731
31
3131
31
39
39
3939
3941
41
4141
4143
43
4343
4345
45
4545
4547
47
4747
47
97
97
9797
97
48
48
4848
48
40
40
4040
40
38
38
3838
38
32
32
3232
32
28
28
2828
28
16
1616
1616
10
1010
1010 66 666
44 444
407407407407407
417417417417417
14
14
1414
14
303303303303303
309309309309309
311311311311311
313313313313313
317317317317317
321321321321321
325325325325325
327327327327327
331331331331331
333333333333333
337337337337337
339339339339339
64
64
6464
64
60
60
6060
60
56
56
5656
56
48
48
4848
48
44
44
4444
44
40
40
4040
40 3
636
3636
36 18
18
1818
18
51
51
5151
51
8787878787
9191919191
9393939393
9797979797
99999999992828282828
2626262626
2424242424
2020202020
20
020
020
020
020
0
77777
1111111111
1515151515
2121212121
77 777
3535353535
1818181818
1414141414
1212121212
44444
14
614
614
614
614
6
12
212
212
212
212
2
11
411
411
411
411
4
11
211
211
211
211
2
11
011
011
011
011
0
301301301301301
305305305305305
309309309309309
311311311311311
317317317317317
321321321321321
323323323323323
13
613
613
613
613
6
12
812
812
812
812
8
20
120
120
120
120
155555
328328328328328
324324324324324320320320320320
318318318318318314314314314314
310310310310310
308308308308308
304304304304304
501501501501501
509509509509509
513513513513513
515515515515515
519519519519519
523523523523523
527527527527527
531531531531531
11
011
011
011
011
0
528528528528528
526526526526526
520520520520520 44444
1616161616
1414141414
88888
514514514514514510510510510510
508508508508508
506506506506506
513513513513513
517517517517517
519519519519519
527527527527527
523523523523523
33 333
11
11
1111
11
718718718718718
700700700700700
522522522522522
516516516516516
740740740740740
700700700700700
10
15
10
15
10
15
10
15
10
1511
15
11
15
11
15
11
15
11
15
739739739739739
4114114114114111
09
10
910
910
910
9
11
011
011
011
011
0
10
810
810
810
810
8
10
610
610
610
610
6
10
210
210
210
210
2
412412412412412
36
36
3636
36
32
32
3232
32
64
64
6464
64
201201201201201
203203203203203
219219219219219
223223223223223
227227227227227
231231231231231
235235235235235
239239239239239
213213213213213
205205205205205
207207207207207
215215215215215
11
211
211
211
211
2
11
011
011
011
011
0
230230230230230
224224224224224
216216216216216
222222222222222
206206206206206
200200200200200
36
36
3636
36 32
32
3232
32
28
28
2828
28
24
24
2424
24
20
20
2020
20
16
16
1616
16
12
12
1212
12
527527527527527
532532532532532530530530530530
526526526526526
524524524524524
520520520520520
512512512512512
508508508508508
503503503503503
507507507507507
511511511511511
517517517517517
523523523523523
502502502502502
55 55599 99915
15
1515
1519
19
1919
19
23
23
2323
2327
27
2727
2729
29
2929
2933
33
3333
3335
35
3535
35
39
39
3939
39
108108108108108
106106106106106
104104104104104
10
310
310
310
310
310
710
710
710
710
7
101101101101101
103103103103103
105105105105105
107107107107107
31
031
031
031
031
0
24
024
024
024
024
0
23
823
823
823
823
8
23
423
423
423
423
4
23
023
023
023
023
0
22
622
622
622
622
6
22
222
222
222
222
2
21
621
621
621
621
6
21
421
421
421
421
4
21
221
221
221
221
220
720
720
720
720
7
21
521
521
521
521
5
21
721
721
721
721
7
23
123
123
123
123
1
23
523
523
523
523
5
23
923
923
923
923
9
331331331331331
335335335335335
339339339339339
343343343343343
347347347347347
401401401401401
405405405405405
409409409409409
413413413413413
417417417417417
421421421421421
412412412412412
410410410410410406406406406406
402402402402402
346346346346346
344344344344344
340340340340340
338338338338338334334334334334332332332332332327327327
327327
3434343434
2222222222
1414141414
66666 13
12
13
12
13
12
13
12
13
12
800800800800800
724724724724724
11
011
011
011
011
0
10
410
410
410
410
476
76
7676
767
272
7272
72
68
68
6868
68
55555
1111111111
1919191919
333
333
333
333
333
1111111111
1717171717
2121212121
25252525252626262626
2424242424
1818181818
1212121212
88888
39
039
039
039
039
0
55555
99999
1515151515
1919191919
2323232323
2727272727
31313131313838383838
3232323232
2626262626
2020202020
1414141414
1010101010
22222
34
034
034
034
034
0
77777
1515151515
2929292929
5151515151
6161616161
7676767676
629629629629629
635635635635635
637637637637637
647647647647647648648648648648
636636636636636
620620620620620
628628628628628
622622622622622
616616616616616
285
285
285
285
285
15151515
15
21212121
21
27272727
27
53535353
53
757
757
757
757
757
655655655655655
1010101010
22222
45454545
45
706706706706706
36
36
3636
36
37373737
37
12111211121112111211
61
061
061
061
061
0
1515151515
19
19
1919
19
35353535
35 654654654654654
52
052
052
052
052
0
62
562
562
562
562
5
30303030
30
700
700
700
700
700
601601601601601
20202020
20
650650650650650
18
18
1818
18 4040404040
1111111111
4848484848
25
25
2525
25
132113211321
13211321
788788788788788
735
735
735
735
735
59595959
59
51
451
451
451
451
4
51
051
051
051
051
0
12201220122012201220
585585585585585
52
452
452
452
452
4
23
23
2323
23
3535353535
14
14
1414
14
773
773
773
773
773
658658658658658
12231223122312231223
12311231123112311231
40404040
40
45454545
45
2020202020
57575757
57
647647647647647
12071207120712071207
13031303130313031303
12171217121712171217
12221222122212221222
250
250
250
250
250
12351235123512351235
13171317131713171317
13151315131513151315
61
461
461
461
461
4
60
760
760
760
760
7
63
263
263
263
263
2
12321232123212321232
63
563
563
563
563
5
10
10
1010
10
524524524524524
11
011
011
011
011
0
1111111111
10161016101610161016
34343434
34840840840840840
620620620620620
31
431
431
431
431
4
13101310131013101310
10151015101510151015
902902902902902
33
33
3333
33
10
00
10
00
10
00
10
00
10
00
13
07
13
07
13
07
13
07
13
07
53
453
453
453
453
4
61
061
061
061
061
0
50
850
850
850
850
8
910910910910910
52
052
052
052
052
0
11
511
511
511
511
5
907907907907907
53
053
053
053
053
0
11081108110811081108
18
18
1818
18
21
1-2
13
21
1-2
13
21
1-2
13
21
1-2
13
21
1-2
13
11151115111511151115
63
63
6363
63
20
20
2020
20
628628628628628
611611611611611
11191119111911191119
52
752
752
752
752
7
11091109110911091109
83
083
083
083
083
0
31
031
031
031
031
0
1212121212
4444444444
51
151
151
151
151
1
55555
51
251
251
251
251
2
35
35
3535
35
128128128128128
11141114111411141114
977977977977977
66666
920920920920920
777777777777777
21
921
921
921
921
9
60
660
660
660
660
6
11081108110811081108
13
05
13
05
13
05
13
05
13
05
614614614614614
22222
55
555
555
555
555
5
52
852
852
852
852
8
125125125125125
63
763
763
763
763
7
903903903903903
52
652
652
652
652
6
11111
53
653
653
653
653
6
64
064
064
064
064
0
70
070
070
070
070
0
44
044
044
044
044
0
615615615615615
52
652
652
652
652
6
63
863
863
863
863
8
911911911911911
51
251
251
251
251
2
12011201120112011201
61
561
561
561
561
5
51
151
151
151
151
1
51
351
351
351
351
3
11111111111111111111
33333
50
850
850
850
850
8
3333333333
14
14
1414
14
51
951
951
951
951
9
16
15
16
15
16
15
16
15
16
15
12191219121912191219
51
951
951
951
951
9
52
852
852
852
852
8
63
363
363
363
363
3
10051005100510051005
52
352
352
352
352
3
834834834834834
851851851851851
10401040104010401040
20
120
120
120
120
1
901901901901901
700700700700700
1515151515
12
95
12
95
12
95
12
95
12
95
30
830
830
830
830
8
71
071
071
071
071
0
51
551
551
551
551
5
51
151
151
151
151
1
12
11
12
11
12
11
12
11
12
11
10161016101610161016
99 999
10041004100410041004
50
950
950
950
950
9
66666
13
15
13
15
13
15
13
15
13
15
25
25
2525
25
53
253
253
253
253
2
31
231
231
231
231
2
15
15
15
15
15
15
15
15
15
15
50
550
550
550
550
5
40
440
440
440
440
4
12
12
1212
12
750750750750750
1651
1651
1651
1651
1651
14
01
14
01
14
01
14
01
14
01
44444
912912912912912
605605605605605
202202202202202
11
15
11
15
11
15
11
15
11
15
63
463
463
463
463
4
610610610610610
901901901901901
55555
11
14
11
14
11
14
11
14
11
14
2222222222
11
00
11
00
11
00
11
00
11
00
12
35
12
35
12
35
12
35
12
35
909909909909909
33333
52
052
052
052
052
0
13
01
13
01
13
01
13
01
13
01
705705705705705
16
29
16
29
16
29
16
29
16
29
10
30
10
30
10
30
10
30
10
30
914914914914914
43
343
343
343
343
3
21
521
521
521
521
5
11
911
911
911
911
9
12
15
12
15
12
15
12
15
12
15
13
27
13
27
13
27
13
27
13
27
63
863
863
863
863
8
53
453
453
453
453
4
20
20
2020
20
54
554
554
554
554
5
12151215121512151215
81
881
881
881
881
8
105105105105105
821821821821821
41
341
341
341
341
3
11111
42
542
542
542
542
5
10111011101110111011
33333
10
210
210
210
210
2
110110110110110
10071007100710071007
17
12
17
12
17
12
17
12
17
12
52
352
352
352
352
3
17
11
17
11
17
11
17
11
17
11
1654
1654
1654
1654
1654
22222
51
051
051
051
051
0
905905905905905
152152152152152
41
741
741
741
741
7
12141214121412141214
16
11
16
11
16
11
16
11
16
11
11
111
111
111
111
1
120120120120120
17
17
1717
17
17
16
17
16
17
16
17
16
17
16
86
086
086
086
086
0
1621
1621
1621
1621
1621
15
53
15
53
15
53
15
53
15
53
17
03
17
03
17
03
17
03
17
03
11011101110111011101
710710710710710
711711711711711
32
632
632
632
632
6
13
23
13
23
13
23
13
23
13
23
11
11
1111
11
51
951
951
951
951
9
138138138138138
1515151515
35353535
35
12111211121112111211
1111111111
538538538538538
84
584
584
584
584
5
32
132
132
132
132
1
702702702702702
45
045
045
045
045
0
11181118111811181118
90
090
090
090
090
0
11
111
111
111
111
1
16
37
16
37
16
37
16
37
16
37
11
22
11
22
11
22
11
22
11
22
14
17
14
17
14
17
14
17
14
17
115115115115115
16
06
16
06
16
06
16
06
16
06
550550550550550
21
21
2121
21
609609609609609
79
079
079
079
079
0
40
740
740
740
740
7
12
512
512
512
512
5
2727272727
232232232232232
63
763
763
763
763
7
624624624624624
601601601601601
88
288
288
288
288
2
24
524
524
524
524
5
16
04
16
04
16
04
16
04
16
04
51
451
451
451
451
4
51
651
651
651
651
6
31
331
331
331
331
3
13
09
13
09
13
09
13
09
13
09
840840840840840
809809809809809
614614614614614
91
191
191
191
191
1
963963963963963
10
10
1010
10
20
920
920
920
920
9
14
14
1414
14
11101110111011101110
621621621621621
40
640
640
640
640
6
619619619619619
21
721
721
721
721
7
63
363
363
363
363
3
43
043
043
043
043
0
2121212121
18
18
1818
18
17
14
17
14
17
14
17
14
17
14
17
09
17
09
17
09
17
09
17
09
2020202020
603603603603603
53
053
053
053
053
0
619619619619619
2121212121
30
630
630
630
630
6
13021302130213021302
53
4-5
36
53
4-5
36
53
4-5
36
53
4-5
36
53
4-5
36
30303030
30
87
487
487
487
487
4
21
21
2121
21
88
188
188
188
188
1
53
253
253
253
253
2
51
251
251
251
251
2
20
720
720
720
720
7
3939393939
613613613613613
12941294129412941294
21
121
121
121
121
1
30
330
330
330
330
3
12
812
812
812
812
8
32
032
032
032
032
0
15
33
15
33
15
33
15
33
15
33
1616161616
16
34
16
34
16
34
16
34
16
34
16
22
16
22
16
22
16
22
16
22
52
452
452
452
452
4
1616161616
10
12
10
12
10
12
10
12
10
12
64
064
064
064
064
0
10
010
010
010
010
0
15
65
15
65
15
65
15
65
15
65
717717717717717 12
17
12
17
12
17
12
17
12
17
120120120120120
908908908908908
24
724
724
724
724
7
17
11
17
11
17
11
17
11
17
11
12
412
412
412
412
4
10011001100110011001
11051105110511051105
33333
2121212121
30
430
430
430
430
4
811811811811811
61
061
061
061
061
0
1818181818
104104104104104
15
23
15
23
15
23
15
23
15
23
10
610
610
610
610
6
605605605605605
10
010
010
010
010
013
04
13
04
13
04
13
04
13
04
10121012101210121012
112112112112112
40404040
40
712712712712712
12
09
12
09
12
09
12
09
12
09
53
253
253
253
253
2
50
550
550
550
550
5
11041104110411041104
16
07
16
07
16
07
16
07
16
07
10
510
510
510
510
5
210210210210210
10991099109910991099
52
652
652
652
652
6
703703703703703
50
150
150
150
150
1
111111111111111
1322-381322-381322-381322-381322-38
916916916916916
11
20
11
20
11
20
11
20
11
20
715715715715715
11
50
11
50
11
50
11
50
11
50
711711711711711
3737373737
1616161616
32
032
032
032
032
0
83
483
483
483
483
4
36
36
3636
36
111111111111111
813813813813813
90
290
290
290
290
2
13
14
13
14
13
14
13
14
13
14
802802802802802
19
19
1919
19
14
1414
1414
14
17
14
17
14
17
14
17
14
17
17
17
17
17
17
17
17
17
17
17
32
132
132
132
132
1
55 555
15
69
15
69
15
69
15
69
15
69
50
950
950
950
950
9
16
01
16
01
16
01
16
01
16
01
1616161616
16
00
16
00
16
00
16
00
16
00
31
431
431
431
431
4
15
31
15
31
15
31
15
31
15
31
91
991
991
991
991
9
91
591
591
591
591
5
817817817817817
12
14
12
14
12
14
12
14
12
14
30
930
930
930
930
9
12
03
12
03
12
03
12
03
12
03
5555555555
933933933933933
246246246246246
11
42
11
42
11
42
11
42
11
42
77777
12
44
12
44
12
44
12
44
12
44
2020202020
714714714714714
15
15
1515
15
44 444
809809809809809
15
31
15
31
15
31
15
31
15
31
16
16
1616
16
51
551
551
551
551
5
228228228228228
20
420
420
420
420
4
115115115115115
52
2B
52
2B
52
2B
52
2B
52
2B
707707707707707
11
15
11
15
11
15
11
15
11
15
104104104104104
1010101010
816816816816816
21
721
721
721
721
7
48484848
48
13
213
213
213
213
2
16
28
16
28
16
28
16
28
16
28
12
25
12
25
12
25
12
25
12
25
23
123
123
123
123
1
17
08
17
08
17
08
17
08
17
08
16
04
16
04
16
04
16
04
16
04
1010101010
201201201201201
915915915915915
999999999999999
13151315131513151315
31
531
531
531
531
5
39
39
3939
39
10
610
610
610
610
6
540540540540540
32
432
432
432
432
4
14
09
14
09
14
09
14
09
14
09
83
683
683
683
683
6
82
482
482
482
482
4
23
323
323
323
323
3
805805805805805
13
37
13
37
13
37
13
37
13
37
83
883
883
883
883
8
31
131
131
131
131
1
11351135113511351135
44444
15
55
15
55
15
55
15
55
15
55
31
031
031
031
031
0
910910910910910
14
09
14
09
14
09
14
09
14
09
615615615615615
16
21
16
21
16
21
16
21
16
21
89
789
789
789
789
7
39
39
3939
39
44444
16
10
16
10
16
10
16
10
16
10
17
01
17
01
17
01
17
01
17
01
12
02
12
02
12
02
12
02
12
02
88
588
588
588
588
5
13
02
13
02
13
02
13
02
13
02
29
29
2929
29
612612612612612
14
14
14
14
14
14
14
14
14
14
713713713713713
10
09
10
09
10
09
10
09
10
09
15
26
15
26
15
26
15
26
15
26
13
10
13
10
13
10
13
10
13
10
909909909909909
17
17
1717
17
15
39
15
39
15
39
15
39
15
39
10091009100910091009
30
030
030
030
030
0
42
342
342
342
342
3
99999
807807807807807
14
20
14
20
14
20
14
20
14
20
17
04
17
04
17
04
17
04
17
04
848848848848848
33
133
133
133
133
1
13061306130613061306
11
27
11
27
11
27
11
27
11
27
14
14
1414
14
17
10
17
10
17
10
17
10
17
10
37
37
3737
37
924924924924924
14
35
14
35
14
35
14
35
14
35
205205205205205
2626262626
55555
81
781
781
781
781
7
1618
1618
1618
1618
1618
12
12
1212
12
91
891
891
891
891
8
10181018101810181018
41
41
4141
41
71
871
871
871
871
8
707707707707707
16
09
16
09
16
09
16
09
16
09
12
12
12
12
12
12
12
12
12
12
15
30
15
30
15
30
15
30
15
30
22
22
2222
22
50
650
650
650
650
6
11
45
11
45
11
45
11
45
11
45
35
35
3535
35
17
07
17
07
17
07
17
07
17
07
10
03
10
03
10
03
10
03
10
03
12
00
12
00
12
00
12
00
12
00
100100100100100
18
18
1818
18
88 888
10011001100110011001
117117117117117
19
19
1919
19
15
13
15
13
15
13
15
13
15
13
14
15
14
15
14
15
14
15
14
15
10
50
10
50
10
50
10
50
10
50
13
05
13
05
13
05
13
05
13
05
15
43
15
43
15
43
15
43
15
43
88
888
888
888
888
8
24
124
124
124
124
1
92
692
692
692
692
6
90
990
990
990
990
9
80
7-8
11
80
7-8
11
80
7-8
11
80
7-8
11
80
7-8
11
21
21
2121
21
806806806806806
13
04
13
04
13
04
13
04
13
04
21
621
621
621
621
6
22222
10011001100110011001
11111
11
34
11
34
11
34
11
34
11
34
15
22
15
22
15
22
15
22
15
22
24
24
2424
24 209209209
209209
533533533533533
88 888
44 444
10
110
110
110
110
1
92
592
592
592
592
5
85
785
785
785
785
7
823823823823823
15
15
1515
15
803803803803803
990990990990990
822822822822822
13
06
13
06
13
06
13
06
13
06
11
08
11
08
11
08
11
08
11
08
13301330133013301330
10
710
710
710
710
7
16
23
16
23
16
23
16
23
16
23
810810810810810
12
12
1212
12
10
01
10
01
10
01
10
01
10
01
15
45
15
45
15
45
15
45
15
45
33
033
033
033
033
0
106106106106106
2525252525
10
33
10
33
10
33
10
33
10
33
602602602602602
930930930930930
804804804804804
16
17
16
17
16
17
16
17
16
17
11
011
011
011
011
0
13
00
13
00
13
00
13
00
13
00
33
733
733
733
733
7
15
60
15
60
15
60
15
60
15
60
15
12
15
12
15
12
15
12
15
12
601601601601601
105105105105105
805805805805805
15
67
15
67
15
67
15
67
15
67
812812812812812
31
31
3131
31
43
43
4343
43
16
16
1616
16
811811811811811
14
07
14
07
14
07
14
07
14
07
80
80
8080
80
17
02
17
02
17
02
17
02
17
02
81
881
881
881
881
8
10141014101410141014
10
910
910
910
910
9
11
30
11
30
11
30
11
30
11
30
13181318131813181318
11201120112011201120
20
520
520
520
520
5
960960960960960
11
25
11
25
11
25
11
25
11
25
13
15
13
15
13
15
13
15
13
15
11
40
11
40
11
40
11
40
11
40
21
421
421
421
421
4
818818818818818
13
45
13
45
13
45
13
45
13
45
15
57
15
57
15
57
15
57
15
57
13141314131413141314
40
140
140
140
140
1
13
13
13
13
13
13
13
13
13
13
13121312131213121312
12
00
12
00
12
00
12
00
12
00
66666
16
18
16
18
16
18
16
18
16
18
909909909909909
21
021
021
021
021
0
66 666
16
12
16
12
16
12
16
12
16
12
32
32
3232
32
33
33
3333
33
25
25
2525
25
15
40
15
40
15
40
15
40
15
40
16
16
16
16
16
16
16
16
16
16
4646464646
824824824824824
80
280
280
280
280
2
33333
17
00
17
00
17
00
17
00
17
00
617617617617617
30
730
730
730
730
7
901901901901901
15
10
15
10
15
10
15
10
15
10
86
986
986
986
986
9
83
183
183
183
183
1
814814814814814
10101010101010101010
11
43
11
43
11
43
11
43
11
43
22
022
022
022
022
0
912912912912912
16
16
1616
16
13
21
13
21
13
21
13
21
13
21
15
40
15
40
15
40
15
40
15
40
12
33
12
33
12
33
12
33
12
33
14
47
14
47
14
47
14
47
14
47
70
570
570
570
570
5
14
15
14
15
14
15
14
15
14
15
10
10 10
1010
111111111111111
15
56
15
56
15
56
15
56
15
56
71
271
271
271
271
2
10
410
410
410
410
4
15
27
15
27
15
27
15
27
15
27
610610610610610
15
24
15
24
15
24
15
24
15
24
83
483
483
483
483
4
13091309130913091309
80
680
680
680
680
6
22
422
422
422
422
4
615615615615615
17
17
17
17
17
17
17
17
17
17
44444
33
333
333
333
333
3
82
882
882
882
882
8
39
39
3939
39
15
32
15
32
15
32
15
32
15
32
1818181818
73
273
273
273
273
2
211211211211211
11
18
11
18
11
18
11
18
11
18
13
21
13
21
13
21
13
21
13
21
16
16
1616
16
90
890
890
890
890
8
11
08
11
08
11
08
11
08
11
08
220220220220220
15
04
15
04
15
04
15
04
15
04
91
491
491
491
491
4
70
470
470
470
470
4
81
381
381
381
381
3
10
99
10
99
10
99
10
99
10
99
11031103110311031103
77
077
077
077
077
0
82
082
082
082
082
0
86
186
186
186
186
1
34
34
3434
34
12
99
12
99
12
99
12
99
12
99
10171017101710171017
23
623
623
623
623
6
917917917917917
24
824
824
824
824
8
13
09
13
09
13
09
13
09
13
09
84
284
284
284
284
2
10
00
10
00
10
00
10
00
10
00
10201020102010201020
13231323132313231323
10061006100610061006
820820820820820
37
37
3737
37
89
489
489
489
489
4
28
28
2828
28
1622
1622
1622
1622
1622
91
891
891
891
891
8
10181018101810181018
16
05
16
05
16
05
16
05
16
05
12
38
12
38
12
38
12
38
12
38
20
20
2020
20
90
290
290
290
290
2
15
34
15
34
15
34
15
34
15
34
90
890
890
890
890
8
30
030
030
030
030
0
55 55513051305130513051305
27
27
2727
27
536536536536536
17
21
17
21
17
21
17
21
17
21
11
12
11
12
11
12
11
12
11
12
31
531
531
531
531
5
10221022102210221022
11251125112511251125
87
787
787
787
787
790
790
790
790
790
7
15
24
15
24
15
24
15
24
15
24
16
01
16
01
16
01
16
01
16
01
980980980980980
71
371
371
371
371
3
11
28-4
611
28-4
611
28-4
611
28-4
611
28-4
6
910910910910910
12
19
12
19
12
19
12
19
12
19
12
23
12
23
12
23
12
23
12
23
903903903903903
608608608608608
10151015101510151015
11
25
11
25
11
25
11
25
11
25
13
13
13
13
13
13
13
13
13
13
623623623623623
970970970970970
804804804804804
87
187
187
187
187
1
81
781
781
781
781
7
901901901901901
87
587
587
587
587
5
706706706706706
901901901901901
84
684
684
684
684
683
083
083
083
083
0
16
19
16
19
16
19
16
19
16
19
13
07
13
07
13
07
13
07
13
07
13
17
13
17
13
17
13
17
13
17
15
51
15
51
15
51
15
51
15
51
10011001100110011001
808808808808808
12
12
12
12
12
12
12
12
12
12
17
17
1717
17
10151015101510151015
88 888
12
05
12
05
12
05
12
05
12
05
45
45
4545
45
907907907907907
11
00
11
00
11
00
11
00
11
00
10051005100510051005
89
089
089
089
089
0
14
01
14
01
14
01
14
01
14
01
80
680
680
680
680
6
83
683
683
683
683
6
609609609609609
30
30
3030
30
10271027102710271027
89
089
089
089
089
0
11
511
511
511
511
5
15
44
15
44
15
44
15
44
15
44
13
113
113
113
113
1
70
470
470
470
470
4
112311231123
11231123
813813813813813
11
15
11
15
11
15
11
15
11
15
70
970
970
970
970
9
11
36
11
36
11
36
11
36
11
36
13
03
13
03
13
03
13
03
13
03
22
522
522
522
522
5
11
06
11
06
11
06
11
06
11
06
82
082
082
082
082
0
1660
1660
1660
1660
1660
17
17
1717
17
99
099
099
099
099
0
43
43
4343
43
11
11
1111
11
31
131
131
131
131
1
11
05
11
05
11
05
11
05
11
05
70
070
070
070
070
0
15
15
15
15
15
15
15
15
15
15
807807807807807
81
081
081
081
081
0
85
185
185
185
185
1
844844844844844
777771515151515
11
01
11
01
11
01
11
01
11
01
531531531531531
32
732
732
732
732
7
30
630
630
630
630
6
905905905905905
70
370
370
370
370
3
11
09
11
09
11
09
11
09
11
09
81
281
281
281
281
2
24
024
024
024
024
0
70
470
470
470
470
4
82
582
582
582
582
5
831831831831831
912912912912912
11
35
11
35
11
35
11
35
11
35
13181318131813181318
16
18
16
18
16
18
16
18
16
18
24
324
324
324
324
3
11
11
1111
11
10391039103910391039
71
571
571
571
571
5
13221322132213221322
28
28
2828
28
21
521
521
521
521
5
16
15
16
15
16
15
16
15
16
15
31
631
631
631
631
6
15
17
15
17
15
17
15
17
15
17
15
39
15
39
15
39
15
39
15
39
107107107107107
15
36
15
36
15
36
15
36
15
36
902902902902902
14
05
14
05
14
05
14
05
14
05
81
081
081
081
081
0
10
17
10
17
10
17
10
17
10
17
14
05
14
05
14
05
14
05
14
05
24
24
2424
24
12
12
1212
12
70
670
670
670
670
6
80
1-
805
80
1-
805
80
1-
805
80
1-
805
80
1-
805
102102102102102
15
59
15
59
15
59
15
59
15
59
12
01
12
01
12
01
12
01
12
01
11
37
11
37
11
37
11
37
11
37
34
134
134
134
134
1
103103103103103
11
11
11
11
11
11
11
11
11
11
801801801801801
10111011101110111011
90
090
090
090
090
0
83
583
583
583
583
5
12031203120312031203
80
880
880
880
880
8
99
999
999
999
999
9
70
970
970
970
970
9
12
12
1212
12
938938938938938
11
17
11
17
11
17
11
17
11
17
12901290129012901290
898898898898898
99 999
17
22
17
22
17
22
17
22
17
22
20
220
220
220
220
2
11
33
11
33
11
33
11
33
11
33
819819819819819
10161016101610161016
15
41
15
41
15
41
15
41
15
41
16
07
16
07
16
07
16
07
16
07
15
47
15
47
15
47
15
47
15
47
10251025102510251025 7
11
71
171
171
171
1
832832832832832
15
40
15
40
15
40
15
40
15
40
12151215121512151215
80
980
980
980
980
9
93
193
193
193
193
114
10
14
10
14
10
14
10
14
10
12
09
12
09
12
09
12
09
12
09
14
00
14
00
14
00
14
00
14
00
(611-649)(611-649)(611-649)(611-649)(611-649)
10991099109910991099
939939939939939
12
42
12
42
12
42
12
42
12
42
82
082
082
082
082
0
828828828828828
82
382
382
382
382
3
22
822
822
822
822
8
812812812812812
15
23
15
23
15
23
15
23
15
23
71
0-7
12
71
0-7
12
71
0-7
12
71
0-7
12
71
0-7
12
81
981
981
981
981
9
31
31
3131
31
11111
10091009100910091009
11
21
11
21
11
21
11
21
11
21
820820820820820
10111011101110111011
88 888
938938938938938
10031003100310031003
85
085
085
085
085
0
90
790
790
790
790
7
936936936936936
822822822822822
89
589
589
589
589
5
810810810810810
13
14
13
14
13
14
13
14
13
14
11
11
1111
11
823823823823823
821821821821821
13
01
13
01
13
01
13
01
13
01
11041104110411041104
10001000100010001000
70
570
570
570
570
5
11
01
11
01
11
01
11
01
11
01
72
972
972
972
972
9
13
23
13
23
13
23
13
23
13
23
13151315131513151315
11
411
411
411
411
4
855855855855855
909909909909909
11201120112011201120
32
32
3232
32
930930930930930
15
35
15
35
15
35
15
35
15
35
22
22
2222
22
13171317131713171317
99
999
999
999
999
9
19
19
1919
19
10311031103110311031
77 777
911911911911911
86
686
686
686
686
6
11101110111011101110
927-931927-931927-931927-931927-931
98
098
098
098
098
0
836836836836836
11
19
11
19
11
19
11
19
11
19
13271327132713271327
915915915915915
11
811
811
811
811
8
830830830830830
10161016101610161016
82
3-2
582
3-2
582
3-2
582
3-2
582
3-2
582
782
782
782
782
7
10071007100710071007
10101010101010101010
920920920920920
13
31
13
31
13
31
13
31
13
31
15
18 -
152
215
18 -
152
215
18 -
152
215
18 -
152
215
18 -
152
2
70
370
370
370
370
3
10331033103310331033
11
02
11
02
11
02
11
02
11
02
11181118111811181118
842842842842842
71
671
671
671
671
6
101210121012101210121
117
11
17
11
17
11
17
11
17
826826826826826
10051005100510051005
12111211121112111211
12
22-1
230
12
22-1
230
12
22-1
230
12
22-1
230
12
22-1
230
14
50
14
50
14
50
14
50
14
50
10071007100710071007
11
35
11
35
11
35
11
35
11
35
13
25
13
25
13
25
13
25
13
25
905905905905905
10111011101110111011
13
35
13
35
13
35
13
35
13
35
12
21
12
21
12
21
12
21
12
21
11161116111611161116
81
681
681
681
681
6
11101110111011101110
722722722722722
11
00
11
00
11
00
11
00
11
00
720720720720720
84
484
484
484
484
4
1616161616
215215215215215
2727272727
12
30
12
30
12
30
12
30
12
30
302302302302302
102102102102102
20
20
2020
20
767
767
767
767
767
615615615615615
11
13
11
13
11
13
11
13
11
13
915915915915915
812812812812812
215215215215215
750750750750750
900900900900900
82
682
682
682
682
6
619619619619619
515515515515515
66
666
666
666
666
6
11
45
11
45
11
45
11
45
11
45
633633633633633
917917917917917
921921921921921
22222116
116116116116
84
084
084
084
084
0
901901901901901
906906906906906
610
610
610
610
610
14
2-1
48
14
2-1
48
14
2-1
48
14
2-1
48
14
2-1
48
910910910910910
13
20
13
20
13
20
13
20
13
20
81
581
581
581
581
5
14
12
14
12
14
12
14
12
14
12
2525252525
11
14
11
14
11
14
11
14
11
14
81
381
381
381
381
3
22
122
122
122
122
1
914914914914914
1601
1601
1601
1601
1601
94
194
194
194
194
1
51
51
5151
51
13
12
13
12
13
12
13
12
13
12
61616161
61
22
522
522
522
522
5
167167167167167
770770770770770
600600600600600
790790790790790
781781781781781
775775775775775
922922922922922
791791791791791
11141114111411141114
53
453
453
453
453
453
653
653
653
653
653
253
253
253
253
2
11141114111411141114
14
08
14
08
14
08
14
08
14
08
15
61
15
61
15
61
15
61
15
61
15
37
15
37
15
37
15
37
15
37
66666
32
032
032
032
032
0
83
583
583
583
583
5
80
980
980
980
980
9
81
381
381
381
381
3
811811811811811809809809809809
11
11
11
11
11
11
11
11
11
11
734734734734734
720720720720720
15
515
515
515
515
5
747747747747747745745745745745
618618618618618
12
01
12
01
12
01
12
01
12
01 5
20
52
052
052
052
051
651
651
651
651
651
851
851
851
851
8
11151115111511151115
11251125112511251125
4747474747
50
50
5050
50
912912912912912
918918918918918
13
31
13
31
13
31
13
31
13
31
835835835835835
801801801801801
37
537
537
537
537
5
14
614
614
614
614
615
015
015
015
015
0
109109109109109
11 111
522A522A522A522A522A
14
00
14
00
14
00
14
00
14
00
14
10
14
10
14
10
14
10
14
10
14
06
14
06
14
06
14
06
14
06
809809809809809
11
49
11
49
11
49
11
49
11
49
81
281
281
281
281
2
10601060106010601060
814814814814814
90
590
590
590
590
590
190
190
190
190
1518518518518518
925925925925925
13
40
13
40
13
40
13
40
13
40
13
44
13
44
13
44
13
44
13
44
13
55
13
55
13
55
13
55
13
55
14
00
14
00
14
00
14
00
14
00
14
08
14
08
14
08
14
08
14
08
14
14
14
14
14
14
14
14
14
14
14
46
14
46
14
46
14
46
14
46
14
44
14
44
14
44
14
44
14
44
14
30
14
30
14
30
14
30
14
30
15
32
15
32
15
32
15
32
15
32
15
30
15
30
15
30
15
30
15
30
15
54
15
54
15
54
15
54
15
54
15
66
15
66
15
66
15
66
15
66
15
70
15
70
15
70
15
70
15
70
15
74
15
74
15
74
15
74
15
74
16
13
16
13
16
13
16
13
16
13
15
63
15
63
15
63
15
63
15
63
207207207207207
10
02
10
02
10
02
10
02
10
02
99
899
899
899
899
8
99
299
299
299
299
2
99
499
499
499
499
4
840840840840840(111-117)
(111-117)(111-117)(111-117)(111-117)
(311-331)(311-331)(311-331)(311-331)(311-331)(211-221)
(211-221)(211-221)(211-221)(211-221)
(411-432)(411-432)(411-432)(411-432)(411-432)
(511-526)(511-526)(511-526)(511-526)(511-526)
840840840840840
(711-731)(711-731)(711-731)(711-731)(711-731)
(811-817)(811-817)(811-817)(811-817)(811-817)
(911-926)(911-926)(911-926)(911-926)(911-926)
11
911
911
911
911
9
490490490490490
428428428428428
33 333
240
240
240
240
240
102102102102102
11
48
11
48
11
48
11
48
11
48
742742742742742
10
09
10
09
10
09
10
09
10
09
10
13
10
13
10
13
10
13
10
131
017
10
17
10
17
10
17
10
17
715
715
715
715
71572
172
172
172
172
1
21212121
21
23232323
23
25252525
25
31313131
31
33333333
33 623623623623623
655
655
655
655
655
11
01
11
01
11
01
11
01
11
01
13
12
11
10
12
16
16
14
31
32
3436
10
10
Figure 4: City GIS-Map Guide Program. Sample location showing FEMA zone overlay.
Blue area shows limits of FEMA Areas of Special Flood Hazard and hatched area shows Zone X (500-year)
C. San Rafael Creek - Canal Dredging Most of the Central San Rafael Basin drains into the San Rafael Creek. At one time, the San Rafael Creek existed as an open drainage channel westward as far as the Sun Valley and West End neighborhoods. This creek was also fed by tributaries (e.g., Mahon Creek) and bordered by low-lying marshland. In fact, most of Downtown San Rafael, the Woodland Avenue area, portions of the Bret Harte neighborhood and Canal neighborhood were once marshland that bordered and supported the creek. While filled, the lower elevation of these former marshland areas places much of the basin in the FEMA Areas of Special Flood Hazard. For this reason, much of the Central San Rafael Basin is vulnerable to sea level rise as shown in the BCDC prediction maps. The San Rafael Creek is a critical element in providing adequate drainage to the Central San Rafael Basin; it collects most of the surface water runoff from Downtown San Rafael and the bordering neighborhoods and provides a direct deposit of this runoff to the Bay. Over time, the San Rafael Creek (as well as Mahon Creek) has been filled or realigned, and only limited segments remain as a surface drainage feature west of US 101. The one segment of this creek that remains as a continuous open channel is the segment east of US 101. Further, the portions of this creek that are east of the Grand Avenue bridge have remained navigable. Until the last two decades, the segments of the San Rafael Creek from the Grand Avenue bridge to the open Bay (referenced as the San
Climate Adaptation- Sea Level Rise White Paper 14 January 2014
Rafael Canal) were dredged on a fairly regular basis. Available federal and state funding (including past funding sources such as the former San Rafael Redevelopment Agency), as well as available upland sites for disposing dredged spoils made it possible to conduct regular dredging and maintain the sediment levels in the Canal to ensure navigability. However, over time, funding sources for dredging have dwindled. Further, upland sites for spoils disposal are scarce, forcing other costly disposal options (e.g., selected deep water disposal sites in the Bay region). In 2011-2012, the San Rafael Creek was dredged at a cost of approximately $2.0 million. This cost covered dredging, spoils disposal, as well as surveying and permitting ($500K). The project was fully funded by the US Army Corps of Engineers (Corps). Because of sediment contamination, a complete dredging of the inner canal was not possible and dredge spoils were required to be disposed at an upland landfill. As a result of this last dredging process, the Corps has reported that future dredging of the canal will be challenging because of limited funding resources. The San Rafael Canal is an important resource that needs to be considered in long-term planning of drainage in the Central San Rafael Basin. While continued dredging of the Canal may not be an effective tool to combat sea level rise, it is critical for boat navigability and basin drainage. Lastly, depending upon the level of contamination for use, the spoils dredged from the Canal may prove to be valuable for local use such as: a) raising levees; b) wetland restoration; or c) other outboard adaptive strategies.
D. SMART Station Area Plans In 2012, the City prepared “vision” documents for the area around the two planned SMART stations, one in Downtown San Rafael and one at the Civic Center. The San Rafael Downtown Station Area Plan (2012) and the San Rafael Civic Center Station Area Plan (2012) present a number of recommended actions to study transportation and land use improvements within a one-half-mile radius of the SMART station. Both Downtown and Civic Center include low-lying areas that are vulnerable to sea level rise. For this reason, both plans acknowledge sea level rise as a planning challenge and include a recommendation for the City to monitor sea level rise, plan for shoreline defense, develop a program of levee analysis and prepare a vulnerability assessment.
IV. WHAT HAS BEEN STUDIED AND EXPLORED IN THE BAY AREA AND BEYOND
A. Studies and Assessment Efforts Completed to Date Since the 2006 publication of the BCDC sea level prediction maps, there have been numerous reports and studies commissioned and completed to address climate adaptation for sea level rise. This section summarizes what has been prepared that is relative to the Bay Area and may be applicable and valuable for long-term planning in San Rafael. This section presents these studies and resource documents in chronological order. In 2009, BCDC, the Association of Bay Area Governments (ABAG) and the San Francisco Bay National Estuarine Research Reserve presented, Preparing for Sea Level Rise: Planning Sustainable Communities, which recommended the inclusion of the Marin bayside into the “Baylands Corridor” and the need to develop detailed mapping and analysis for determining vulnerability and strategies for long-term adaptation. In 2009, the County of Marin adopted the Marin Countywide Plan, which includes mapping, analysis, and policies to limit development and access, and control shoreline modification among other strategies. While the Marin Countywide Plan “Baylands Corridor” designation and policies are primarily focused on the protection of biological resources, water quality and flood protection, the issue of sea level rise is inherent in the Plan. County of Marin has indicated that the Baylands Corridor will likely be a good
Climate Adaptation- Sea Level Rise White Paper 15 January 2014
planning tool to address sea level rise and adaptation. County staff will be reviewing the Baylands Corridor designation and policies for this purpose. In 2009, “SPUR,” a Bay Area-based, member-supported non-profit organization completed its first report on the topic of sea level rise. Entitled, Strategies for Managing Sea Level Rise, this report weighs the advantages and disadvantages of seven strategies for managing sea level rise. The seven adaptive strategies assessed are barriers, coastal armoring, elevated development, floating development, floatable development, living structures, and managed retreat. See the section below entitled, Strategies in Managing Sea Level Rise for a description of these strategies. In 2010, the City of Hayward contracted with Philip Williams & Associates, Ltd (PWA) to conduct a Preliminary Study of the Effects of Sea Level Rise on the Resources of the Hayward Shoreline. The study includes a map and analysis of each water management function, described by location and includes the types of and proximity to hazards, mode of failure, severity and risk of damage, and adaptation strategies. It also identified three possible adaptation strategies: “hold-the-line” (levee construction), realignment (moves levee inland), and gradual steeping (provides a mechanism to increase surface elevation at about the rate of sea level rise). The study found realignment and gradual steeping strategies preferable adaptation methods because of the various implementation benefits. Following these results, the study identified next steps for Hayward including a more detailed assessment of coastal hazards to specific infrastructure to gauge vulnerability based on the proximity of future erosion and flooding hazard zones to facilities. In 2011, BCDC, MTC and the State Department of Transportation (Caltrans) commissioned the preparation of Adapting to Rising Tides: Transportation Vulnerability and Risk Assessment Pilot Project (with technical assistance of AECOM, consultants). Known as the “ART Project,” this pilot study includes a partnership with the National Oceanic and Atmospheric Administration Coastal Service Center (NOAA), with funding from the Federal Highway Administration (FHWA) and ICLEI. The ART Project assessed the highly varied and diverse shoreline in Alameda County (Emeryville to Union City) defining five shoreline categories based on their primary physical characteristics, functions and abilities to inhibit inland inundation. The five categories are: engineered flood protection structures (e.g., levees, sea walls), engineered shoreline protection structures (e.g., bulkheads, revetments), non-engineered berms (e.g., salt pond and agricultural berms), wetlands, and natural non-wetland shorelines (e.g., beaches, cliffs). The following are two fundamental “take-aways” from the ART Project:
The shoreline categories developed for Alameda County reasonably encompass the range of shoreline types found throughout the nine-county San Francisco Bay Area.
Non-engineered berms are common around the San Francisco Bay shoreline. Non-engineered berms protect marshes, ponds, and agricultural areas from wave erosion and provide flood protection to inland developments. These berms are often comprised of Bay mud that has been excavated from the Bay floor and piled and/or stacked in a mound. Many non-engineered berms have been in place around the Bay for several decades, with some dating back over 100 years. Most berms are periodically maintained to compensate for settlement, erosion, failure and rising sea levels. Several areas around the Bay contain extensive networks of non-engineered berms that provide multiple lines of flood defense between the Bay and developed areas. However, the non-engineered nature of their construction typically classifies them as highly vulnerable to sea level rise and seismic events.
The ART Project “template” has been structured to implement a five-phase planning process:
1. Scope & Organize. Identify and convene partners and stakeholders; define planning area 2. Assess. Inventory and assess conditions. 3. Plan. Identify appropriate adaptation strategies 4. Implement & Monitor.
Climate Adaptation- Sea Level Rise White Paper 16 January 2014
Progress has been made on the ART Project. In 2012, a Vulnerability and Risk Assessment Report was completed. More recently, in December 2013, BCDC published two documents: 1) ART Vulnerability & Risk: The Define Step; and 2) ART Developing on Adaptation Response: The Plan Step. In 2011, “SPUR” completed a second report on sea level rise entitled, Climate Change hits home: Adaptation strategies for the San Francisco Bay Area, which reviews sea level rise by sector impacts. This report recommends conducting shoreline risk assessments and preparing coastal inundation maps while revising local general plans so that policies relating to climate change hazards and sea level rise are included. In 2012, the California Emergency Management Agency, California Natural Resources Agency, and the Federal Emergency Management Agency developed, California adaptation planning guide: Planning for Adaptive Communities. The guide recommends assessing climate change impacts, identifying areas most vulnerable and developing reasonable and rational risk reduction strategies at both a regional and local level. The guide also includes nine steps for conducting a vulnerability assessment, which are listed as follows:
Phase I- Identifying Conditions and Risks Step 1. Exposure: What climate change effects will a community experience? Step 2. Sensitivity: What aspects of a community (functions, structures, and populations) will be affected? Step 3. Potential Impacts: How will climate change affect the points of sensitivity? Step 4. Adaptive Capacity: What is or can be currently done to address the impacts? Step 5. Risk and Onset: How likely are the impacts and how quickly will they occur?
Phase II- Developing Adaptive Strategies Step 6. Prioritize Adaptive Needs: Which impacts require actions to address them? Step 7. Identify Strategies: Which strategies should be pursued to address adaptation needs? Step 8. Evaluate and Prioritize Strategies: Which strategies should be implemented first? Step 9. Phase and Implement: How can the strategies be funded, staffed, and monitored?
In 2013, the North Bay Watershed Association (NBWA) commissioned PRBO Conservation Science, environmental consultants to prepare Adapting to Sea Level Rise Along the North Bay Shoreline. PRBO had previously developed and published the Future San Francisco Bay Tidal Marsh Climate Smart Planning Tool (2011), which NBWA had commissioned PRBO to use in the North Bay shoreline study. This report presents excellent information that is specific to North Bay conditions. The purpose of the North Bay shoreline report is to demonstrate how the PRBO planning tool could be used by agencies responsible for coastal areas in North San Francisco Bay to develop adaptive management plans. Two NBWA workshops were held that brought together 50 managers, scientists, and other stakeholders from groups in the North Bay to identify what information they needed, but currently lacked, to make decisions. As a result of feedback gathered in these workshops and a pre-workshop survey, the NBWA established the following goals for this study:
Address the ecosystem value of tidal marshes by estimating the amount by which they attenuate incoming waves;
Analyze tidal marshes and other sites of interest in the North Bay region by calculating projected marsh composition, wave attenuation, and tidal marsh bird abundance
Add summary reports containing data for 344 tidal marshes across San Francisco Bay to PRBO’s sea-level rise decision support tool (http://data.prbo.org/apps/sfbslr/index.php?page=marsh-reports); and
Climate Adaptation- Sea Level Rise White Paper 17 January 2014
Produce more detailed vulnerability assessments (including estimates of adaptive capacity) for three case study areas selected as being of high interest to workshop participants: Inner Richardson Bay, Gallinas Creek, and Novato Creek.
PRBO had previously produced models of sea-level rise in San Francisco Bay that looked at projected tidal elevations five times over the next 100 years (2030, 2050, 2070, 2090, and 2110). Uniquely, these models include not only the rate of sea-level rise but also the rate of marsh accretion due to the deposition of suspended sediment and organic material. PRBO has found that marsh accretion serves to offset the effects of sea-level rise, as it causes increases in marsh elevation that can potentially match losses due to sea-level rise. In 2013, the environmental firm of ESA-PWA completed Analysis of the costs and benefits of using tidal marsh restoration as a sea level rise adaptation strategy in San Francisco Bay, assigned financial value to tidal marshes for restoration cost-benefit analysis. The goal of the Marin Conservation League and the San Francisco Bay Area Wetlands Restoration Project is to restore at least 100,000 acres of wetlands within the footprint of the Bays original tidal marshes as 92% have been lost. The report indicated two cost effective strategies in adapting to sea level rise:
Retreat- Levee Relocation. The first is a levee and wetland strategy, which suggests moving the levee to a new location further inland. The total cost for a new levee is over $12 million per mile (over 50 years), while restoring a 200-foot-wide marsh cost about $6.3 million per mile.
Figure 4- Retreat- Levee Relocation (Source: ESA-PWA, 2013)
“Horizontal Levee.” The second strategy is a horizontal levee shoreline management system,
which has an estimated total cost of $6.3 million per mile (over 50yrs). The horizontal levee shoreline management system (levee, wetland and upland “ecotone slope”) would increase in elevation over time, enhance the ability of the flood risk management system to keep pace with sea level rise, and reduce damage to the levee thus reducing maintenance costs. The report demonstrated that complete tidal marshes have a better ability to provide a broad range of ecosystem and economic services; yet if restoration is delayed for too long, it may be unable to keep pace with expected sea level increases and fail to provide the desired benefits.
Climate Adaptation- Sea Level Rise White Paper 18 January 2014
Figure 5- Horizontal Levee (Source: ESA-PWA, 2013)
Figure 6- “Horizontal Levee” (Source: ESA-PWA, 2013)
Lastly, in 2013, the San Francisco Bay Conservation and Development Commission and Corte Madera Baylands contracted with ESA-PWA to prepare, Conceptual Sea Level Rise Adaptation Strategy for the Corte Madera Baylands. The study reviewed existing literature, utilized field measurements, and one- and two- dimensional modeling to determine current tidal marsh and future response to sea level rise. A geomorphic conceptual model was used to identify alternative management measures for key processes of Baylands evolution and resilience. Currently, waves entering Corte Madera Bay were reduced in height and energy by roughly 80% by the time they reached the marsh edge. Both historic and restored tidal marshes are keeping pace with sea level rise; however, modeling studies suggest that they will not keep pace with accelerated sea level rise. The Corte Madera shoreline has already retreated inland by an average of 485 feet over the past 153 years and marsh habitats will continue to downshift until they are eventually lost and convert to mudflat before the end of the century. Further research is necessary to determine how much increase in sea level rise the marshes can handle.
Climate Adaptation- Sea Level Rise White Paper 19 January 2014
B. Lessons Learned from Completed Assessments A review of sea level rise literature offers regional and national lessons that can be applied at the local level. The following section details recommendations on choosing sea level rise predictions, areas and infrastructure of concern, partnerships and communication. Sea Level Rise predictions and models for California are between 10-17” by 2050 and 31-69” by 2100 (PWA, 2010), (ICLEI, 2012), (ESA PWA, 2013a). Locally, the Corte Madera Baylands study discussed above projected sea level rise rates are 6” by 2030, 11” by 2050, and 36” by 2100 (ESA PWA 2013b). Due to the uncertainty in identifying the exact quantity of sea level rise, regional studies suggest developing sea level rise models through an inclusive public process (PWA, 2010), and creating several sea level rise scenarios that include considerations for the amount of sea level rise, and variability (ICLEI, 2012). Overall, regional studies recognize an increase in depth, duration, and frequency in baylands inundation and erosion (SFBCDC and ESA PWA, 2013), with the greatest threat being from storms that occur in tandem with high tides (ESA-PWA, 2013). The City of San Rafael has one main transportation corridor that is threatened by sea level rise and inundation. According to the 2011 SPUR Report, Climate Change hits home: Adaptation strategies for the San Francisco Bay Area, about half of the roads in the Bay Area are at risk of inundation and 60% of the state’s railroads are at risk of a 100-year flood event. Additionally, wastewater treatment plants on the shoreline, such as the Central Marin Sanitation Agency and the Las Gallinas Valley Sanitary District, are vulnerable to a predicted 55” rise in sea level. The development of a countywide adaptation plan is recommended to ensure projects are resilient to predicted 2100 sea level rise. Regional partnerships have developed to address and adapt to sea level rise. BCDC, ABAG and the San Francisco Bay National Estuarine Research Reserve have developed a plan to help protect the Baylands corridor through mapping, analysis, and policies to limit development, access, and shoreline modifications among other measures. Additionally, the California Emergency Management Agency provides tools to increase partnerships such as Cal Adapt (cal-adapt.org), which provides local profiles, climate change tools, data and other resources. Furthermore, the California Emergency Management Agency, the California Natural Resource Agency, and the Federal Emergency Management Agency have indicated the importance of engaging a wide variety of stakeholders in order for vulnerability assessment strategies to be adopted, equitable, and implemented efficiently (2012). To increase communication of sea level rise measures the Bay Area Climate & Energy Resilience Project calls for a Bay Area Campaign. The Campaign would make the case for climate change adaptation work and would tell a single science-based story explaining the impacts of climate change. The campaign should emphasize short term and long term benefits and demonstrate why it is not just a government issue (Riordan, Bruce, n.d). In developing the campaign, establishing a climate change adaptation public outreach and education program is necessary because this campaign requires community support so the potential consequences are understood. It is recommended that communication focus on raising public awareness to the potential threats of climate change and the community benefits of taking action to achieve tangible outcomes.
C. Approaches and Tools to Conducting a Vulnerability Assessment There is a wealth of sea level rise vulnerability assessment studies. Regionally and around the world, organizations have conducted assessments to better understand the impacts and possible strategies in addressing sea level rise vulnerabilities. The following is a description of the various approaches used in determining vulnerability and categorizing risk:
Spatial Assessment of Impacts on Environmental and Socioeconomic Systems. In 1999, Klein, R. and Nicholls, R. focused on biogeophysical affects when conducting a vulnerability assessment. Their report, Assessment of Coastal Vulnerability to Climate Change, focused on
Climate Adaptation- Sea Level Rise White Paper 20 January 2014
knowing the spatial and temporal dynamics of biogeophysical affects (flood frequency, erosion, inundation, rising water tables, saltwater intrusion, and biological effects) that trigger impacts and recommended including anticipated impacts and available adaptation options as well as environmental and socioeconomic systems.
Map-Based Assessment and Inventory of Watershed. In 2012, the engineering firm of Aldaron
Laird Trinity Associates created a GIS database to inventory and map existing shoreline conditions, assesses existing shoreline vulnerability, and identifies land uses and infrastructure that could be affected in Humboldt Bay. In the report, Humboldt Bay: shoreline inventory, mapping and sea level rise vulnerability assessment, the inventory included the location of tidal and upland boundary, distribution of shoreline attributes, presence of water control structures, and salt marsh. The database analysis determined that dikes are actively eroding, unmaintained, or with surfaces that are regularly overtopped. Previous fortification and rehabilitation of dikes did not offer protection from rising sea levels above 3-6 feet, with a 6-foot rise in water levels, concluding that nearly 94% of the dikes would fail to hold back rising tidewater.
Participatory Citizen Engagement and Capacity-Building. A participatory approach has also been
the focus of two sea level rise vulnerability assessments. The first study was conducted in 2011 by the UNHabitat Cities and Climate Change Initiative, Negombo, Sri Lanka: Climate Change Vulnerability Assessment. The purpose of the participatory approach was to build the citizen capacity to address city vulnerability to climate change scenarios and develop adaptation strategies. Data was collected through focus group discussions, interviews, field and participatory mapping, and GPS surveys. The study attempted to relate global predictions using local accounts of historic data and previous events to emphasize the evidence of climate change impacts in the city. This process was chosen to enable increased mobilization of effective local actions. In 2012, ICLEI and the Local Governments for Sustainability utilized a participatory approach to engage multiple stakeholders in developing Sea Level Rise Adaptation Strategy for San Diego Bay. A steering committee was organized to list guiding principles and develop milestones and deliverables. Multiple workshops and subgroup meetings were held. An adaptation working group was formed with representatives from public agencies and provided opportunities for stakeholder engagement, outreach and education to build capacity while promoting a region research agenda.
Sector Vulnerability Analysis. The 2009 and 2011 SPUR reports (discussed above) reviewed sea
level rise vulnerabilities by sector and created a storm vulnerability index (authored by Santos, M., Rio, L. & Benavente, J.). The index provides a rapid assessment of vulnerability and exposure levels and is based on location to pin-point areas of action (2013).
The aforementioned approaches demonstrate useful practices that may be adopted for the City of San Rafael’s sea level rise vulnerability assessment. The general message in these approaches is that there is not one approved method for conducting a sea level rise vulnerability assessment. However, it is important that the assessment method meet the goals and needs of the community being assessed.
D. Strategies in Managing Sea Level Rise Based on the results of various vulnerability assessments, several agencies have created a list of possible strategies in managing sea level rise. The California Emergency Management Agency, California Natural Resources Agency, & FEMA provide examples of management actions with descriptions, factors to consider, sources of information, examples of applications, funding sources, sector overlaps and co-benefits detailed by sector in their report, California adaptation planning guide: identifying adaptation strategies (2012). The following list includes recommendations dealing specifically with sea level rise.
Climate Adaptation- Sea Level Rise White Paper 21 January 2014
Review any existing communitywide health assessments to evaluate their responsiveness to climate change impacts.
Utilize mapping technologies to identify vulnerable neighborhoods show differential exposures to the health damaging impacts and can be examined from a geographical equity perspective with GIS.
Refine emergency preparedness and response to address health impacts. Incorporate climate change risks into existing emergency preparedness plans and designs. Public health agencies should evaluate proposed/implemented climate adaptation strategies related to public health.
Require accounting of sea level rise in all applications for new development in shoreline areas.
Preserve undeveloped and vulnerable shorelines.
Develop coordinated plans for mitigating future flood, landslide, and related impacts through concurrent adoption of updated general plan safety elements and local hazard mitigation plans.
Update general plan elements to reduce potential losses of life and property from existing and increased flooding and landslide risks.
Implement AB 167 (2002) requiring flood hazard information in the local general plan.
Restore existing flood control and riparian corridors. Convert concrete-lined channels to soft bottomed waterways, install landscaping on embankments to slow flood water, provide natural planting to encourage biodiversity and build retention basins for percolation into aquifers.
Implement general plan safety elements through zoning and subdivisions practices that restrict development in floodplain and landslide hazard areas. Minimize or avoid development in 100-year floodplain or landslide areas.
Update plans that manage community infrastructure systems to include assessments of climate change impacts on community infrastructure.
Create a “hot spots” map that identifies critical locations in infrastructure systems with economic risks and costs.
Use low impact development stormwater practices in areas where storm sewers may be impaired by high water due to sea level rise or flood waters.
Conduct an assessment to identify stormwater outfalls most likely to be flooded.
Additionally, as briefly discussed above, the 2009 SPUR report Strategies for Managing Sea Level Rise identified seven strategy measures to consider for long-term shoreline protection. These strategies are discussed below, which have their advantages and disadvantages:
Barrier- a large dam, gate, or lock that manages tidal flows in and out of the Bay- it protects a large area of land in a single sweep with no social equity issues; however, they are expensive and ecologically damaging and they may not work.
Coastal Armoring- linear protection such as levees and seawalls that fix the shoreline in it current place- can be used in combination with other strategies; however, it is a short term solution requiring costly annual maintenance and regular monitoring. Additionally, armored shorelines are more vulnerable to erosion and increase erosion of nearby beaches.
Climate Adaptation- Sea Level Rise White Paper 22 January 2014
Elevated Development- raising the height of land or existing development and protecting it with
coastal armoring- allows structures to be built in vulnerable areas; however, this is a short-term strategy.
Floating Development- structures that float on the surface of the water or may be floated during a flood- is largely invulnerable to changing tides, but structures do not work well in places subject to wind and wave action from storms.
Floodable Development- structures that are designed to withstand flooding or to retain stormwater- is designed to resist damage with retention areas for ocean surges or heavy rainfall, catch water and slowly releasing it. This strategy is experimental and polluted stormwater is a public health hazard that requires combined sewer systems and new treatment facilities to ensure the released water meets water quality standards.
Living Shorelines- wetlands are the natural shoreline formation and absorb floods, slow erosion, provide habitat, and are essential for estuarine health- requires at least 100,000 acres of tidal wetlands and the San Francisco Bay currently has 73,000 acres.
Managed Retreat- the planned abandonment of threatened areas near the shoreline and is used when other efforts have become too expensive or are thought to be a losing battle- minimizes human suffering and is less expensive than armoring strategies, but it causes a loss of coastal property values, legal and equity issues and may require significant clean-up costs.
Some of these strategies may or may not be suitable for the Marin County Bay shoreline because of cost, environmental factors, existing development and feasibility.
E. Funding Sources and Regulatory Requirements Funding Sources and Prerequisites There is one important factor about certain funding sources and prerequisites for grant qualification. In order to qualify for some grants, the City must have an adopted Multi-Hazard Mitigation Plan, which typically includes measures for emergency preparedness and operations. Hazard mitigation is “any sustained action taken to reduce or eliminate the long-term risk to human life and property from hazards. A hazard mitigation plan identifies the hazards a community or region faces, assesses their vulnerability to the hazards and identifies specific actions that can be taken to reduce the risk from the hazards.” (ABAG, 2013) The Federal Disaster Mitigation Act of 2000 (DMA 2000) outlines a process which cities, counties, and special districts can follow to develop a Hazard Mitigation Plan. Development of this plan is a requirement for certain benefits from CalEMA and FEMA. The City of San Rafael prepared and received State-adoption of a Multi-Hazard Mitigation Plan in the mid-2000s. However, these plans must be renewed every five years. Given the age of this plan, it may not be adequate to qualify for all available grant opportunities. A review and update of the City’s Multi-Hazard Mitigation Plan should be included on the list of ‘next steps.’ The following is a list of funding sources used and referred to in the sea level rise literature provided in this paper. Some of these sources might be available for countywide or local sea level rise planning and study.
U.S Army Corps of Engineers (USACE): is the primary federal agency funding shoreline restoration projects limited to large-scale structural alternatives. All projects funded by the USACE require reconnaissance and feasibility studies before implementation to determine
Climate Adaptation- Sea Level Rise White Paper 23 January 2014
whether a federal interest exists in the project. For more information see http://www.usace.army.mil/.
▪ Section 14 Emergency stream bank and shore erosion, maximum federal contribution $1million
▪ Section 204 Beneficial uses of dredged material, maximum federal contribution for project development and construction $5 million.
▪ Section 206 Aquatic ecosystem restoration, maximum federal contribution is $5million
Government Issue (GI): funding requires congressional authorization and includes four phases: reconnaissance, feasibility, pre-construction engineering and design, and construction.
California Emergency Management Agency and FEMA: provides grants for hazard mitigation including climate-related hazards planning. For more information see http://www.calema.ca.gov/LandingPages/Pages/Grants-and-Funding.aspx.
U.S. Fish and Wildlife Service: requires a 50% match, normally, and federally-listed threatened or endangered species require a minimum of 25% match. For more information see http://www.fws.gov/grants/.
California Coastal Conservancy: funds pre-project feasibility studies, property acquisition, planning, environmental review, construction, monitoring, and in limited cases, maintenance. Previous study projects include a consideration of sea level rise scenarios (2050-2100) to assess project vulnerability and reduce expected risks and increase resiliency to sea level rise. For more information see http://scc.ca.gov/category/grants/.
North Bay Watershed Association: facilitates partnerships that promote the stewardship of the North Bay Watershed resources and has funded 17 projects totaling $393,000 from 2008 to 2012. For more information see http://www.nbwatershed.org/.
In addition, the following funding sources should be explored for local sea level rise planning and study:
One Bay Area Grant (OBAG): Grants available to Priority Development Areas (PDA) for planning and transportation/infrastructure projects. The Downtown San Rafael PDA would be eligible.
Marin County Measure A: Marin County Measure A is a temporary ¼-cent sales tax increase that will protect the natural places, local parks, and family farms. The Measure A tax is intended to be used for the following purposes:
Protect streams, baylands, natural areas, and wildlife habitat
Manage vegetation to preserve biodiversity and reduce wildfire risk
Protect water quality by conserving open space and other natural lands that feed our
lakes, streams, lagoons, and baylands
Protect and preserve Marin County farms and ranches
Improve public access and recreational opportunities by maintaining and enhancing
walking, hiking, biking and equestrian trails
Fifteen percent of the Measure A tax that is collected is made available to cities, towns, and special districts to manage their parks, nature preserves, recreation programs and vegetation to reduce wildfire risk. Locally, there are competing needs and tradeoffs that must be weighed in allocating these tax dollars. In San Rafael, the tax dollars have been allocated to public park improvements and public open space management. Use of Measure A funds may be appropriate to consider addressing sea level rise (either for assessment purposes or adaptation) on publicly-owned lands. However, such projects would have to compete with the other public park and open space projects.
Climate Adaptation- Sea Level Rise White Paper 24 January 2014
City of San Rafael – Long-Range Planning Support - General Plan 2020 Maintenance Fund: The
revenue stream for this fund is a surcharge on all building permits. This fund is used to implement and manage the San Rafael General Plan 2020. As the Sustainability Element of the General Plan 2020 includes programs to support preparation of a vulnerability assessment, levee analysis and sea level monitoring and planning, this fund might be suitable to subsidize the implementation of these programs.
Regulatory Requirements The following is a general list of regulatory requirements and/or clearances that may aid in the development of sea level rise adaptation strategies and were mentioned in the sea level rise literature.
California Environmental Quality Act (CEQA) and National Environmental Protection Act (NEPA): the 2010 CEQA Guidelines amendments states, “The EIR should evaluate any potentially significant impacts of locating development in other areas susceptible to hazardous conditions as identified in authoritative hazard map, risk assessments or in land use plans addressing such hazards areas.” While an analysis of sea level rise is not mandated under the CEQA Guidelines, inclusion of this topic in environmental documents is advisable. On projects that are in low-lying areas or close to the shoreline, it has been the City of San Rafael policy to assess the potential impacts of sea level rise on a project through the environmental review process.
Executive Order S-13-08: planning construction projects in vulnerable areas must consider a
range of sea level rise scenarios.
BCDC San Francisco Bay Plan: new climate change policies will affect design and siting requirements for some projects requiring permits from the BCDC. Any construction work that is conducted within the Bay or on upland areas that are within 100 feet of the shoreline are subject to a BCDC permit.
Clean Water Act Section 401: requires water quality certification (from the regional water board)
before a federal agency (U.S. Army Corps of Engineers) can issue a permit or license for an activity that may result in water discharge.
Rivers and Harbors Act Section 10: requires authorization from the U.S. Army Corps of Engineers
for the construction of any structure in or over any navigable water as well as the excavation/dredging, deposition of material, obstruction or alteration in these waters.
National Historic Preservation Act Section 106: requires Federal agencies to take into account
the effects of their undertakings on historic resources.
Federal Endangered Species Act Section 7: requires all federal agencies to consult with the National Marine Fisheries Service or the United States Fish and Wildlife Service if they are proposing an action that may affect listed species or their designated habitat.
Porter-Cologne Water Quality Act: gives the State Water Resources Control Board the ultimate
authority over State water rights and water quality policy, while establishing Regional Water Quality Control Boards to oversee water quality at the local/regional level.
California Endangered Species Act: protects and preserves all native species and their habitats,
threatened with extinction or experiencing a significant decline that could lead to a threatened or endangered designation.
California Fish and Wildlife Code Section 1602: requires any person, state or local governmental
agency, or public utility to notify CDFW before beginning any activity that will substantially divert
Climate Adaptation- Sea Level Rise White Paper 25 January 2014
or obstruct the natural flow of, change or use any material from, or deposit/dispose of debris, waste, or other material in any river, stream or lake.
Magnusen-Stevens Fishery Conservation and Management Act: provides for the conservation
and management of fisheries. Please note that the above list may not be all-inclusive. There may be other agencies involved in the regulatory process for adaptation work that is completed in tidelands (e.g., State of California State Lands Commission) and navigable channels (e.g., State of California Department of Boating and Waterways).
V. CURRENT STUDIES AND STRATEGIES UNDERWAY IN MARIN
A. Richardson Bay Pilot Program In 2010, the Marin County Department of Public Works initiated a pilot program in the Richardson Bay. Rather than focusing on assessing vulnerability, the pilot program employed actual engineering concepts at bay front locations along the Richardson Bay. The goals of the pilot program have been to: a) provide the education and engineering basis for adaptation planning; b) describe options along with their opportunities and constraints; c) determine costs; d) anticipate impacts; e) identify and plan for permitting; and f) prepare for grants as they become available. Part of the pilot program effort has been the Aramburu Beach/Island Restoration Project, which was built in 2011-2012. The first demonstration project of its kind in the San Francisco Bay, it is designed to test natural shoreline approaches to wind and wave erosion, as well as sea level rise. The demonstration project involves the construction of a gravel/cobble beach with a sandy foreshore, as well as the use of wood micro groins (tree stumps). This project is currently being monitored.
Figure 7: Aramburu Beach/Island Restoration Project 2012 (Source: Marin Co. Public Works Dept.)
Climate Adaptation- Sea Level Rise White Paper 26 January 2014
B. C-SMART The Marin County western coastline is predicted to be subject to combined effects of sea level rise, more intense storms, extreme high tides and more coastal erosion. The State of California has invited local governments to apply for funding support to begin to understand, assess and prepare for these possibilities. The County of Marin, in partnership with affected local communities and leading organizations working on these issues, has proposed “C-SMART” (Collaboration on Sea-level Marin: Adaptation Response Team) to begin the process of responding to this challenge. C-SMART is overseen by the Marin County Community Development Agency. The C-SMART team includes the Marin County Department of Public Works, Office of Emergency Services, the County Counsel’s office, the Gulf of the Farallones National Marine Sanctuary, the U.S. Geological Survey, the U.S. National Park Service, Point Blue Conservation Science, the Federal Emergency Management Administration and the Coravai research and consulting firm. In November 2013, the California Ocean Protection Council (OPC) awarded $1.3 million to seven local governments, which includes a $250,000 grant to a C-SMART. The project will evaluate the potential risks to homes, businesses, public facilities – including Highway 1 – as well as coastal resources such as shoreline wetlands, beaches and recreational areas that could be subject to inundation and damage from extreme storm surge events and projected sea level rise. While C-SMART is not relevant to the San Rafael bayfront, the formula, process and output of this effort may be useful for future planning along the Bay shoreline. The take-aways include: a) assembling the right team for this project; b) finding the funding sources to conduct the project; and c) developing the appropriate scope for the study.
C. Marin Climate & Energy Partnership (MCEP) Efforts Efforts are underway to coordinate a county-wide approach to adaptation to Sea Level Rise (SLR). The Marin Climate & Energy Partnership (MCEP), a consortium of all Marin cities and some other agencies in Marin working on climate projects, in December 2013, convened a meeting of entities on behalf of the ABAG Joint Policy Committee (JPC). The intent of the meeting was to identify the major projects and priorities in Marin County that the JPC could support through a planned resource hub, which would offer financial, technical, and informational resources and guidance to local efforts to mitigate and adapt to climate change. A major discussion point was adaptation and sea level rise, and representatives from the County were there to offer insights on the projects they are involved with in the county regarding vulnerability assessments and other planning programs. MCEP has a goal to understand the current state of planning with regard to adaptation and SLR in order to become “grant ready” in 2014 to augment the efforts in the most efficient way.
D. Southern Marin (Vulnerability Assessment) Pilot Program The County of Marin is implementing a vulnerability assessment pilot program for Tamalpais Valley and Marin City entitled, Climate Change, Sea Level Rise, Resilience and adaptation: How can we best prepare to meet the challenges ahead. Initiated and sponsored by Marin County Supervisor Kate Sears, the project seeks to address how climate change impacts of sea level rise and storm events will affect these southern Marin communities, infrastructure, ecosystems, and economy and the strategies to pursue to reduce and manage these risks. The project area focuses on the portion of Mill Valley that touches Richardson Bay at the SASM Sewage Treatment Plan, continues along Shoreline Highway to Tamalpais Valley, an then south to Marin City. The area was selected for its diverse shoreline features, the presence of a regionally-significant transportation infrastructure that includes US101 and State Highway 1, as well as a wide variety of public, private, commercial and recreational assets.
Climate Adaptation- Sea Level Rise White Paper 27 January 2014
While this pilot program primarily uses the BCDC ART Project template, the unique approach to this pilot program is that there is the commitment to engage the entire community through outreach in order to educated, share data and information and obtain feedback. Using a “grassroots” approach, it is the intent of this program to ultimately develop relevant adaptation strategies with the assistance of the community. As a pilot program, it is hopeful that this project will develop a template for other similar efforts throughout Marin County. A 12-13-member steering committee has been formed that is comprised of community members, County of Marin (Department of Public Works) staff and BCDC staff. County/BCDC staff provide the scientific data and projections, mapping, and strategies; these are shared with the steering committee for comment and feedback. Ultimately, the steering committee will identify and evaluate possible adaptation strategies that take into account social, economic, environmental, jurisdictional, recreational and health impacts.
2
E. Gallinas Creek Watershed Program As discussed in Section II (Background) above, in 2008, the County of Marin initiated the Marin County Watershed Program, which presents a 10-year work plan for five of Marin’s developed watersheds. One of the projects is the Gallinas Watershed Program, which is within the San Rafael planning area. The purpose of this project is to identify and describe the recommended watershed improvement measures and provide details on project feasibility, sequencing, preliminary costs and funding strategies. It is anticipated that some type of revenue measure (e.g., bond measure, assessment districts) will be required to implement the recommended measures. By way of background, the 5.6-square-mile Gallinas Creek watershed has two main drainage basins. The main stream to the north is the larger of the two drainages and flows from the ridgeline down through the Santa Margarita Valley and the community of Terra Linda to its confluence with the South Fork Gallinas Creek near McInnis Park. South Fork Gallinas Creek is fed by several small tributaries that originate in the San Rafael Hills and San Pedro Ridge and flow through the communities of San Rafael Meadows, Los Ranchitos and Santa Venetia. Over the years of development in the greater valley, much of the open drainage ways west of US101 were filled or re-channeled into concrete structures. Sections of this basin are served by County Flood Zone #6 (San Rafael Meadows) and County Flood Zone #7 (Santa Venetia). Further, a Community Service Area (CSA#6) has been formed in the Santa Venetia area that covers the maintenance dredging of the channel for navigability. The Gallinas Watershed Program will utilize a collaborative, iterative process to develop an integrated flood protection and habitat restoration program. The watershed program will build upon existing studies and develop new analytical tools to evaluate and quantify the extent of flooding and to evaluate the range of proposed solutions. This process will be summarized in a final report. The final report will also include recommendations on how to leverage local funds to attract State and Federal grant funds. The final report will provide an assessment of and describe the type of local revenue measures that could support project implementation. The current products of the work program that are underway are:
McInnis Marsh Restoration Study- this study will study the potential for tidal restoration of the diked marshlands outboard of McInnis Park and contiguous uplands
Las Gallinas Sediment Studies- this study will address sediment characteristics and build-up
along Gallinas Creek
Santa Venetia Storm Drain Analysis- this analysis consider options for storm drainage improvements in the Santa Venetia neighborhood
2 Meeting with Marin Co Supervisor Sears, Supervisor Aides Maureen Parton and Leslie Alden; December 18, 2013
Climate Adaptation- Sea Level Rise White Paper 28 January 2014
Levee Evaluation- the evaluation will consider levee options along Gallinas Creek. A community meeting is scheduled in January 2014 to present the results of a levee evaluation conducted by the County and the US Army Corps of Engineers.
The watershed approach considers the development of multi-benefit projects as a way to ensure that project priorities are eligible for the broadest range of funding at the State and Federal levels. The above studies will have both direct and indirect benefits to studying and planning for sea level rise. Recently, the City of San Rafael contributed $60,000 (includes $20,000 from the San Rafael Airport property owner) to the Gallinas Watershed Program. This contribution can be spent on studies. The City will be working with County staff to decide where this contribution might be best directed.
3
F. BCDC Pilot Project for Priority Development Areas (PDA) In coordination with ABAG, BCDC has embarked on a pilot project that will involve assessing vulnerability in a selected group of Bay Area Priority Development Areas (PDA) that are in low-lying areas and close to shorelines. The Downtown San Rafael PDA is one of the areas selected for this pilot project for several reasons: 1) it is relatively close to the Bay shoreline and has an immediate linkage to the San Rafael Canal; 2) is developed at low elevations with much of the area within the FEMA 100-year flood hazard zone; and 3) is an area that would be greatly impacted by predicted rises in sea level. Right now, little is known about how this program will be developed, except that it will follow the BCDC ART template. The pilot program will not only will not only establish a base for the scope of a vulnerability assessment but will identify adaptive strategies that are will likely be suitable for the unique characteristics and circumstances found in these PDAs. BCDC staff has commissioned a consultant in this effort and work is expected to be underway in early 2014.
VI. ASSESSING LOCAL CONDITIONS AND OPPORTUNITIES
A. Identifying San Rafael’s Levees and Shorelines San Rafael has a diversity of shoreline and bayfront conditions. Conditions range from flat shorelines that are developed with levees and sea walls to steep uplands that drop to tidelands. Further, there are low-lying areas of the City that are developed, but are vulnerable to sea level rise because they were formerly tidelands or tidal marsh. A broad, general review of the San Rafael bay front and shoreline conditions has been completed; the information in this paper is not based on technical engineering studies of the levees or shorelines. Rather, the following five areas of San Rafael have been identified based on general, long-term knowledge of the community and past history of flooding, inundation and infrastructure failure during past storm events and high tides: Section A Downtown - San Rafael Creek; general area is filled and developed at low elevations Section B Inner Canal- San Rafael Creek, general area around creek is filled and developed at low
elevations Section C East San Rafael Shoreline; general area bordering the San Rafael Bay is filled and
developed at low elevations; some shoreline levee protection Section D San Pedro Peninsula; varying shoreline conditions ranging from filled lands developed at low
elevations to steep uplands transitioning to tidelands; some levee and sea wall protection
3 Meeting with Marin County Department of Public Works; December 16, 2013
Climate Adaptation- Sea Level Rise White Paper 29 January 2014
Section E Gallinas Creek Basin; general area around Gallinas Creek (two forks) including filled and developed low-lying areas (e.g., Santa Venetia, Marin Lagoon, Contempo Marin); limited levee protection
See Appendix A for a list of sites and properties that have been identified for each of the five areas.
B. Identifying Adaptation Strategies Potentially Suitable for San Rafael Based on the research summarized in this paper, there are a number of adaptation strategies that may be suitable for study by San Rafael. The following strategies should be considered and studied in conjunction with the preparation of a vulnerability assessment:
1. Develop and adopt an “overlay zone” in areas prone to potential sea level rise. Adopting an overlay zone (e.g., County of Marin Baylands Corridor designation), provides a nexus to require, as part of individual site review for development: a) a study of sea level rise impacts to the site and project; and b) the ability to impose adaptive measures on the site (e.g., non-development areas, setbacks, sea walls).
2. “Hold-the-line” levee/sea wall enforcement. Some areas of the San Rafael shoreline that are developed with levees may be suitable for raising or structural enhancement to adapt to rising tides. Possible areas suitable for this strategy are Spinnaker Point and the Peacock Gap/Glenwood shorelines.
3. Retreat and conversion of undeveloped upland and diked baylands to tidal marsh. This strategy
may be suitable for some areas in San Rafael. There are a number of sites that border the Bay and creeks that should be studied (e.g., Canalways, Canal-side area of Pickleweed Park, McInnis Park/San Rafael Airport.
4. “Horizontal Levee” that converts mudflats to marsh plain. The horizontal levee concept has been successfully studied in other areas of the Bay. The outboard tidelands in southeast San Rafael may have the characteristics and conditions suitable for this strategy.
5. “Barrier” or controlled/locked gate system. This type of improvement is effective in controlling tide levels along channels but is very costly to install and maintain. Nonetheless, the feasibility of a gate system at the mouth of the San Rafael Creek/Canal should be studied.
6. Continued dredging of San Rafael Creek/Canal for basin drainage. While it may not be a tool for combatting sea level rise, maintaining the Canal as a navigable channel will help the flow of runoff from upstream. Depending upon the level of contamination, the dredged spoils may be locally useful for other adaptive strategies (e.g., raising or reinforcing levees).
C. Identifying Potential Opportunity Areas for Adaptation Given the diversity of shoreline and bayfront conditions, there are a number of potential “opportunity areas” within San Rafael that should be studied to determine their suitability for successful mid-term and long-term employment of adaptive strategies .Please see Appendix B of this paper, which identifies a number of potential sites and areas from the Gallinas Basin in North San Rafael to the Southeast San Rafael shoreline. For each potential site, information has been provided on property ownership (e.g., private vs. public ownership), property zoning, site/area characteristics and conditions/constraints. Further, for each sites/area, a potential adaptation measure has been identified. Please note that the suggested adaptation strategies presented in Appendix B are not based on any technical or quantitative study. These strategies are not presented as solutions; these are to serve as a starting point for discussion to determine if they are worthy for review and further study. A more detailed study and analysis of the more broad conditions of the San Rafael shoreline and the individual site/areas
Climate Adaptation- Sea Level Rise White Paper 30 January 2014
may conclude that suggested strategies in Appendix B may provide to be infeasible or inappropriate. Nonetheless, the suggestions are intended to serve as a starting point for future study and more importantly, to document opportunity areas.
VII. CHALLENGES Moving forward, there will be a number of challenges that need to be acknowledged and considered before preparing a vulnerability assessment. The following is a brief discussion of the challenges:
1. Assessment and long-term strategy planning for sea level adaptation cannot be done in isolation or be “piecemeal” in its approach. There are no jurisdictional boundaries to the impacts of or planning for sea level rise along the the Marin Bay shores and beyond.
2. Assessment and planning requires the involvement of multiple agencies. Given the complexity of this issue assesing and planning requires the participation, coordination and resources of a number of agencies. In addition to the City of San Rafael, other participating agencies would include, among others, County of Marin, BCDC, Regional Water Quality Control Board, FEMA, and US Army Corps of Engineers.
3. The number of stakeholders involved and effected is substantial. In the Central San Rafael Basin alone, there are thousands of property owners and business owners that are impacted by projected sea level rise, as well as the cost and implications of potential adaptation solutions. Public outreach and participation is critical.
4. Information on sea level rise continues to evolve which could impact impact long-range planning. For example, in the short-term, the long-awaited update of the FEMA FIRM maps will present new flood zone mapping information that may have broader area impacts and will likely result in higher insurance costs to effected property owners.
5. San Rafael has diverse shoreline and levee conditions that vary by neighborhood and area. So, a
“one-size-fits-all” approach to long-term adaptation strategies is impossible. While an areawide assessment is critical, the assessment must carefully look at and consider localized conditions and solutions.
6. City resources and funding are limited. At this time, there are no Public Works Department staff resources, nor is there an earmarked City budget to intiate the preparation of a vulnverability assessment.
7. Long-term adaptation strategies will require trade-offs. Some of the adaptation strategies would have environmental implications that may be at-odds with current policies and priorities. For example, the retreat strategy that converts upland or seasonal marsh to tidal marsh could significantly impact private property rights, private view loss, and bioloogical resources. Assessing the trade-offs will require the cooperation of and coordination with the appropriate stakeholders.
8. Long-term adaptation strategies will be costly. The cost of strategies such as “barriers” could be staggering. Even the raising of an earthen levee is extremely costly unless fill material is locally available. Planning the appropriate strategy for an area will need to consider cost in addition to effectiveness. While federal, state and other agency sources may be available to partially fund these strategies, the formation of assessment districts or other taxing measure will likely be necessary.
Climate Adaptation- Sea Level Rise White Paper 31 January 2014
VIII. NEXT STEPS
The following is a list of suggested tasks and actions to consider and pursue: 1. Prioritize Preparation of a Vulnerability Assessment
Investigate and determine Public Works Department staff resources needed to pursue next steps
2. Investigate and Pursue Funding Sources for Staffing, Studies and Adaptation
Monitor and pursue funding opportunities such as federal grants, OBAG grants
3. Engage in Countywide and Regional Efforts Identify County, state, and regional agencies with Bay and shoreline oversight; participate
in coordinating a collective effort, partnership and/or assistance in preparation of a vulnerability assessment
Consider re-joining the North Bay Watershed Association as it provides a good source for shared information and studies, as well as funding opportunities
4. Identify Stakeholders and Initiate Outreach
Utilize Community Engagement Strategy in identifying stakeholders
Initiate early outreach
5. Continue to Monitor and Participate in Studies and Efforts Underway Monitor updates to FEMA FIRM Maps; document changes as needed
Work with and participate in County of Marin Public Works Department Gallinas Creek
Watershed Project
Monitor and participate in BCDC Pilot Project for Priority Development Areas (PDA)
6. Complete Tasks to Stay Current on Data and to be Eligible for Funding Opportunities Update GIS (Map Guide) maps as necessary to include new data as it becomes available
(e.g., update of FEMA FIRM maps, mapping areas of vulnerability, mapping inventory of levees and shorelines); utilize GIS as a tool for tracking
Review and commission update to City of San Rafael Multi-Hazard Mitigation Plan
Complete an inventory of levees and shorelines
Raise FEMA elevation requirement for construction
7. Pursue Preparation of a Vulnerability Assessment Assessment should include Identify long-term adaptation strategies
Assessment should identify tools for planning and localized implementation including
adoption of a Bayfront Corridor zoning overlay or land use designation, continued Canal dredging
8. Commit to Long-Term Implementation and Programming
Identify tools for funding strategy implementation (e.g., including assessment districts or other taxing measures)