SASOL MAFUTHA Limpopo, Lephalale
PROJECT TYPE: OPENCAST MINING
CLIENT:
Sasol Mining Pty Ltd
VALUE:
R 134 Million
CONSULTANTS:
None
PROJECT DURATION:
12 Months
DATE OF PROJECT:
1 July 2009
PROJECT DESCRIPTION:
Coal bulk sample in Lephalale, mined to a depth
of 96m.
Approximate volumes mined for the project :-
Selective Mining of Bulk Coal sample. Total of 1,
500,000 m³ of topsoil and blasted over burden
was moved, with a total of 996,000 tons of coal.
Coal was crushed down to a <200mm.