Presentation outline
� EDA – General Information
� EDA – Overall Process
� Cat A Projects
� Cat B Projects
� Effectiveness of R&T activities
� Conclusions
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 3
EDA – General Information
The legal basis
The Treaty of Lisbon (01/12/2009) elevated EDA to Treaty level as a substantial cornerstone of the Common Security and Defense Policy. The Council Joint Action 2004/551/CFSP (12 July 2004) on the establishment of the EDA still applies.
The Head of the Agency
Catherine Ashton, the High Representative of the Union for Foreign Affairs and Security Policy, is the Head of the European Defence Agency from the 1 December 2009.
The Chief Executive
Claude-France Arnouldtook her appointment on 17 January 2011.
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 4
EDA – General Information
� 26 participating Member States (pMS):
all members of European Union, except
� Cooperation agreement with
� Categories of projects:
– Operational budget (funded by all pMS)
– Cat A (Opt out)
– Cat B (Opt in)
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 5
EDA – General Information(continued)
� EDA procedures for R&T projects
NEW-June 2010– “General Rules and Procedures applicable to ad hoc
research and technology projects and programmes
for the European Defence Agency”
– “General Provisions applicable to ad hoc research
and technology projects and programmes for the
European Defence Agency”
� Strong industrial participation
in CapTech activities
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 6
EDA – Overall processCapabilityDirectorate
J. Mullin
R&TDirectorate
C. Bréant
ArmamentDirectorate
Vacant
Industry & MarketDirectorate
Vacant
LtGen AndriesACOS STRAT
Capt (Navy) Marcel
RHID/RSTD
LtGen AndriesACOS STRAT
M. Van de VenBSDI
CapTechs
IAP 1 to 4
CapTechs
ESM 1 to 4
CapTechs
GEM 1 to 4
Central PoC
Col Smets
ACOS STRAT
Col OlligschlagerACOS STRAT
Maj JancysACOS STRAT
Col DewildeACOS STRAT
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 7
Presentation outline
� EDA – General Information
� EDA – Overall Process
� Cat A Projects
� Cat B Projects
� Effectiveness of R&T activities
� Conclusions
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 8
Cat A – Joint Investment Program“Force Protection” Key Facts
� 20 contributing Members (cM) to this JIP
AT, BE, CY, CZ, DE, EE, EL, ES, FI, FR, HU, IE, IT, NL, NO, PL, PT,
SI, SK, SE.
� Total budget : 54,93 million Euro, 2007-2009 (BE : 1,52 Mio €)
� Covers the capability areas:
� Collective survivability
� Individual protection
� Secured tactical wireless communication
� Data Analysis including data fusion from various sources
� Mission Planning/Training in an asymmetric environment
� Tenderers : system integrators, SMEs,
academia, defence and security research establishments
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 9
Unmanned Maritime SystemsKey Facts
� Management Committee
– Captain (Navy) Yves Dupont
� Project Arrangement signed at EDA Steering Board
Meeting in MoD formation
in December 2010
� BE participating with 4 ongoing studies, maximizing
the return on investment
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 10
Cat A – Joint Investment Program“CBRN” Key Facts
� Management Committee established June 2010
– Med Col Jean-Luc Gala, CTMA/DLD-Bio
– Mr Wim Van den Bossche, DLD
� Draft version of the Project Arrangement
issued on 4 February 2011
� Book building / technical content in progress
� Coordination mechanism between EDA, EC and ESA
(European Framework Cooperation)
� Business case will be submitted to CHOD / MOD
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 11
Presentation outline
� EDA – General Information
� EDA – Overall Process
� Cat A Projects
� Cat B Projects
� Effectiveness of R&T activities
� Conclusions
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 12
Cat B Projects– Generation Process
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 13
Cat B – OverviewDecember 2009 December 2010
Total candidates 29 19
Total value 138,5 MEUR 91,7 MEUR
# PA
signed
14 9
# contracts signed
4 1
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 14
Cat B – New projects with BE paricipation
� MIRACLE 2 Micro Satellite Clusters (2)
� NMRS-2 Networked Multi-Robot Systems – Phase 2
� MLM Munition Life Management
� 2B-PROT High-Tech materials for ballistic impact and
blast-wave protection
� SOCUMOD Ph2 Social & cultural modelling of FHQS & the
operational environment – Phase 2
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 15
Presentation outline
� EDA – General Information
� EDA – Overall Process
� Cat A Projects
� Cat B Projects
� Effectiveness of R&T activities
� Conclusions
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 16
Information Acquisition & Processing
Guidance, Energy& Materials
Environment, Systems & Modelling
IAP1
ComponentsPatrick Merken (CISS)
GEM1(Utimia Madaleno)
Materials & StructuresLuc Rabet (COBO)
ESM1(Solon Mias)
Naval Systems & their EnvironmentYves Dupont
IAP2 (Attila Simon)RF Sensor Systems& Signal Processing
Thierry Gérard (RHID)
GEM2(Dinesh Chandramouli)
Energetics, Missiles & MunitionsMichel Lefèbvre (TSCA)
ESM2(Jérôme Garcia)
Aerial Systems & their EnvironmentFernand Rouvroi (RHID)
IAP3(Jari Hartikainen)
Optical Sensor Systems& Signal Processing
Marijke Vandewal (CISS)
GEM3(Antoine Vincent)
Ground Systems & their Environments
Erik Van de Schoor (RHID)
ESM3(Ulrich Karock)
Systems of Systems, Space, Simulation & Experiment
Thierry Gérard (RHID)
IAP4(Michael Sieber) CIS & Networks
Patrick Verlinde (CISS)
GEM4(Jonas Nygards)
Guidance & ControlFernand Rouvroi (RHID)
ESM4(Gerlof De Wilde)
Human Factors & CBR ProtectionJohan Vereycken (RHID)
Jean-Luc Gala (CMTA/DLD Bio)
http://www.eda.europa.euhttps://extranet.eda.europa.eu
CapTech National Coordinators
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 17
CNC roles
� CapTech National Coordinator– RHID– ACOS Ops&Trg, STRAT, …– DG MR, HR, …
� Guidance from RHID– Consider agenda before confirming attendance to CapTech meeting
– Inform / report to RHID– Additional briefings on CNC roles
� Feedback from CNCs
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 18
Improving the CapTechWay of Working
� Strategic Research Agenda
� Implementation of Lessons Learned
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 19
Presentation outline
� EDA – General Information
� EDA – Overall Process
� Cat A Projects
� Cat B Projects
� Effectiveness of R&T activities
� Conclusions
Royal High Institute for Defence
16 Feb 2011 Presentation to Nat Reps Slide 20
Conclusions
� EDA R&T provides a structure for collaborative projects and programmes
� BE involvement is « proportionaly adequate »
� RSTD available for further information upon request