ROLLER COASTER PROJECTGet ready for a wild ride!
LETTER FROM THE CHIEF EXECUTIVE OFFICER..
ROLLER COASTER PROJECT BREAKDOWN Roller Coaster Design (Group Grade-30 pts.)
ROLLER COASTER PROJECT BREAKDOWN Roller Coaster Design (Group Grade-30 pts.) Roller Coaster Blueprint (Group Grade-20 pts.) Design Rationale (Individual Grade-30 pts.) Advertisement (Group Grade- 20 pts.) Journal and Participation (Individual Grade- 20 pts.)
TIMELINE
May 30-31 intro, time to work on design and blueprint
Design is due in class June 3/4 June 3/4 is a workday! June 6/7 you will have time to revisit design
(first 40 min) June 6/7 you will present your coaster and
turn in EVERYTHING!
SCHEDULE
BOTTOM LINE: EVERYTHING IS DUE ON JUNE 6/7!!
BEFORE I LET YOU GO….1) Let’s cut our tubing together2) Today you need to brainstorm what other materials
you can bring in to support the track of your coaster!
3) http://www.youtube.com/watch?v=-dpBVtAbKJU