GDE Sales Conference 2007

Rock Reinforcement

Ing. Rudy Dante Aguilar Icho

Atlas Copco Geotechnical Drilling and Exploration

04/28/23

GDE Sales Conference 2007

Contenido

SDA- Self Drilling Anchors

Swellex

Swellex Pumps

MAI Pump M400NT

Roofex (2008)

04/28/23

GDE Sales Conference 2007

Soi

l / w

eak

Roc

k

Underground (Tunneling & Mining)

Har

d R

ock

Surface (Slope Stabilization & Piling)

Rock Reinforcement

Increasing Stresses

U/G

Markets by application, domains and rock type

04/28/23

GDE Sales Conference 2007

Sue

lo /

Roc

a dé

bil

Roc

a du

ra

Superficie (Estabilizacion de taludes y pilotes)

Productos MAI de sostenimiento de rocas

Subterráneo (Minería & Tunelería)

04/28/23

GDE Sales Conference 2007

Bars…produced from 12m long pipesAnd cut to size 1m,2m,3m,4mand 6m

Face plates, Nuts & Couplings

Drill bits

SDA – Product Line

Grout Pump

04/28/23

GDE Sales Conference 2007

A ) Elementos funcionales

Barra de anclaje

Extensiones

Platina

Tuerca

B) Elementos operacionales

Brocas y centralizadores

MAI SDA = Self Drilling Hollow Core Anchor System

SDA Pernos auto perforables

04/28/23

GDE Sales Conference 2007

• Perforación• Inyección de cemento• Instalación de la platina

SDA Métodos de Instalación

04/28/23

GDE Sales Conference 2007

MAI-SDA: Grouting method

Drilling Connecting grout hose

Grouting with MAI® Pump m400NT

1

2

3

4

04/28/23

GDE Sales Conference 2007

MAI-SDA: Grouting method

04/28/23

GDE Sales Conference 2007

SDA

A ) Functional elements

* Anchor rods

* Extension Couplings

* Nut and Plate

B) Operational elements

* Sacrificial Drill bits

200 / 150

R25N

R25

280 /230

R32N

360 / 280

R32S

R32

500 / 400

R38N

R38

550 / 450

R51L

800 / 630

R51N

R51

1600 / 1200

T76N

1900 / 1500

T76S

T76

Ultimate Load / Yield LoadR32L

Replaced by

Self Drilling Hollow Core Anchor System

04/28/23

GDE Sales Conference 2007

- Corrosión de Sacrificio + So3, Cl ambiente C~ 0,15mm/ año + Ambiente de agua dulce

C~0,07mm/año Tiempo de vida se determina mediante

el grado anual de corrosión

- Galvanizado en caliente + Mínimo con capa de Zinc 80 micrones

(promedio actual 150-200 micrones Vida de servicio determinado

generalmente por standares existentes entre 5-10 años

Protección de Corrosión

04/28/23

GDE Sales Conference 2007

SDA – typical Sacrificial Drill bits

Type -X Type -EX, EXX Type -EC, ECC Type -ESF, ESSF

Type -EY,EYY Type -ESD,ESSD Type -XX

04/28/23

GDE Sales Conference 2007

Where are SDA anchors used ?

..... In very difficult and unstable ground conditions, such as unconsolidated sands, gravels or broken and fractured rock formations.

04/28/23

GDE Sales Conference 2007

Sistema Standard de Perforación: Roto – percusión …..(Perforación giratoria)

Tipos de Barrido: * Barrido de Agua... En arena densa, formación de grava o

de acuerdo a las condiciones de roca mejor barrido en cortes grandes y enfriamiento de las brocas * Barrido de Aire… En suelo suave, por ejemplo, caliza

suave, arcilla o similar donde se evite derrame excesivo de agua * Inyección de Cemento y Perforación Simultánea......

En todas las condiciones de suelo no consolidadas

- estabiliza el taladro de perforación durante la instalación, consiguiendo una mejor inyección que cubra la longitud de anclaje

- buena penetración alrededor del suelo, por lo tanto se obtiene mejores valores de fricción externos

- la instalación se realiza en una sola operación, por lo que se ahorra tiempo !

SDA Métodos de Instalación

04/28/23

GDE Sales Conference 2007

Surface crawler D7 with IRIA

D7 with COP 1838 – IRIA and Rod guiding/ clamping System

04/28/23

GDE Sales Conference 2007

IRIA – kit

04/28/23

GDE Sales Conference 2007

Alto grado de instalación ya que no requiere la operación básica de perforación. La perforación, posición e inyección se realiza en una sola operación

1/3

Comparisons: SDA and conventional rebars

1/2

04/28/23

GDE Sales Conference 2007

Herramientas de Instalación Atlas Copco

04/28/23

GDE Sales Conference 2007

Instalación Semi-Mecanizada y Post Inyección

04/28/23

GDE Sales Conference 2007

Instalación Semi Mecanizada e Inyección a través del IRIA

04/28/23

GDE Sales Conference 2007

Pull out test

04/28/23

GDE Sales Conference 2007

La bomba de Inyección m400NT y la m400EASY

22 04/28/23

04/28/23

GDE Sales Conference 2007

Function m400NT

04/28/23

GDE Sales Conference 2007

SDA - Applications

R 25 R 32

R 38

Soil & Rock Nailing'SRN '

R 38 R 51

T 76

Micro Injection Piling'M IP '

R 38 R 51

T 76

Temp. Prestress Anchor'TSA '

R 25 R 32

Tunnelling'SDA '

Applications

Ground Engineering (GE) Surface Applications

Tunnelling (TU) Underground Application

04/28/23

GDE Sales Conference 2007

Potential Problem Area - Slopes

Visit Guni Tunnel Portal 1 KatraIndia, 2004Site Report 05/2005 after 250m total Tunnelcollapse

04/28/23

GDE Sales Conference 2007

Fractured Rock / Unconsolidated soil

Visit Guni Tunnel Portal 2 ReasiIndia, 2004

04/28/23

GDE Sales Conference 2007

Introduction Soil Nailing

Lambagarh Slide Chamoli DistrictUttar Pradesh, India

04/28/23

GDE Sales Conference 2007

Potential Problem Area - Tunnelling

Hanbau Tunnel,Taiwan 2000

04/28/23

GDE Sales Conference 2007

Tunnelling Applications (TU)

Systematic Radial Bolting Fore-poling or Spiling

04/28/23

GDE Sales Conference 2007

Soil & Rock Nailing Applications (GE)

04/28/23

GDE Sales Conference 2007

Soil Nailing Construction Method

04/28/23

GDE Sales Conference 2007

Slope Stabilisation

Shortlands Junction, Bromley, 2002, UK

04/28/23

GDE Sales Conference 2007

Micro Injection Piles - Post settlement control on existing structures (e.g. MIP installation in cellars or similar).

- Increasing the foundation capacity for existing structures.

- New deep foundation for structures in congested city areas with narrow access routes.

- The use of simultaneous drilling and grouting method.

Application and advantages

04/28/23

GDE Sales Conference 2007

Temporary support anchors

04/28/23

GDE Sales Conference 2007

Temporary support anchors

Retaining Structure for railway embankment at Bijlmer Station; Amsterdam Ca. 700 no TSA T76N L=25m , BL=12m, Working Load 600kN

04/28/23

GDE Sales Conference 2007

Birmingham Northern Relief Rd.( M6-Toll), UK

Battered wall

04/28/23

GDE Sales Conference 2007

Birmingham Northern Relief Rd.( M6-Toll), UK

Design

04/28/23

GDE Sales Conference 2007

Slope Stabilisation and Protection

Koudiat Acerdoune Dam project Algeria, 2004

04/28/23

GDE Sales Conference 2007

Tunnel Project Eichelberg,Germany: R51L

Slope Stabilisation and Protection

04/28/23

GDE Sales Conference 2007

Jerusalem 200340.000m R32N galvanized, Production with D7 24no SRN, 12m lg per WD

Battered wall

04/28/23

GDE Sales Conference 2007

Taipei , Taiwan, 1999R32N 1.000m

Battered wall

04/28/23

GDE Sales Conference 2007

Preparation Tunnel Portal Greece, 2000

Slope Stabilisation and Protection

04/28/23

GDE Sales Conference 2007

Sir Herbert Miles Road, Gibraltar, 1999R32N 8.500m

Battered wall

04/28/23

GDE Sales Conference 2007

Flexible Facing

Shortlands Junction, Bromley, 2002, UK

04/28/23

GDE Sales Conference 2007

Pensnett Industrial Estate Project, UK, 1999

Soft Facing

04/28/23

GDE Sales Conference 2007

Soft Facing with wire meshes

Tintern Nr. Chepstow, 2000, UK

04/28/23

GDE Sales Conference 2007

Dublin M50, Ireland, 2000

Drainage System

04/28/23

GDE Sales Conference 2007

........somewhere in the UK, 2000

Drainage System

04/28/23

GDE Sales Conference 2007

SRN Application

Limestone Quarry Carriere D’Arvel Switzerland 2004

04/28/23

GDE Sales Conference 2007

SRN Solution

Limestone Quarry Carriere D’ArvelSwitzerland 2004

04/28/23

GDE Sales Conference 2007

Rock Fall & Avalanche Barriers

04/28/23

GDE Sales Conference 2007

Micro Injection Piles

MIP for Nokia, Jyväskviä, Finland 2000

Settlement Control at City hall in Tallinn Estonia, 1999

04/28/23

GDE Sales Conference 2007

Micro Injection Piles

Unicorn Abrasives, UK, 1998R32N

04/28/23

GDE Sales Conference 2007

Micro Injection Piles

MIP Bank of Finnland, Helsinki, 2000

04/28/23

GDE Sales Conference 2007

Temporary support anchors

Secant pile retaining structure, Uk, 1999

04/28/23

GDE Sales Conference 2007

Temporary support anchors

Centerville, Vancouver, 2000R38N 9.000m

04/28/23

GDE Sales Conference 2007

Permanent support anchors

Restructuring of channel support, Holland, 1996

04/28/23

GDE Sales Conference 2007

Tunnelling (TU)

Hanbau Tunnel, Taiwan, 1999R 32N 80.000m

04/28/23

GDE Sales Conference 2007

Dual Railway Tunnel Bologna, Italy 2003R38N L=15m

Tunnelling (TU)

04/28/23

GDE Sales Conference 2007

Tunnelling – Pipe Roofing

Umbrella at Montegiglio Tunnel Project, Italy, April 2002 R51L L=9m/ 3m overlap

04/28/23

GDE Sales Conference 2007

Sue

lo /

Roc

a dé

bil

Roc

a du

ra

Superficie (Estabilizacion de taludes y pilotes)

Productos MAI de sostenimiento de rocas

Subterráneo (Minería & Tunelería)

04/28/23

GDE Sales Conference 2007

Swellex Products Line

04/28/23

GDE Sales Conference 2007

SWELLEX MANUFACTURING

04/28/23

GDE Sales Conference 2007

Folded Steel Tube Expanded through high water pressure Radial pressure on surrounding rock Immediate roof support !!!

SWELLEX PRINCIPLE

04/28/23

GDE Sales Conference 2007

High water

Pressure

Expanded SWELLEX in the hole

After expansion air pressure force water out of the inlet hole

300bar

SWELLEXafter expansion

Face Plate

SWELLEXInstalled In the hole

Inlet Hole

SWELLEXbefore

expansion

A >> B

B

EXPANSION PRINCIPLE

04/28/23

GDE Sales Conference 2007

INSTALLATION SEQUENCE

Drilling1 Expansion 3

Atlas Copco

Pumpsautomatically stops 4

Atlas Copco

Insertion2

04/28/23

GDE Sales Conference 2007

Immediate full column support

IMMEDIATE FULL COLUMN SUPPORT

04/28/23

GDE Sales Conference 2007

SwellexNet washer for screening

Swellex bridges gaps in

the rock

Allows major shear movements

0,5

m

In hard rock, 50 cm inflated profile develop 100KN friction

Swellex followsall the

irregularituis in the hole

SWELLEX FEATURES IN THE HOLE

04/28/23

GDE Sales Conference 2007

SafetyImmediate rock support

Productivity

ProductivityFast installation

Easy and trouble-free installation

VersatilityInsensitive to irregularities in the hole

Reliability , SafetyAtlas Copco Quality control

Enviromentally friendlyNo Resin, No cement

Controllable rock reinforcementPressure control after the installation

SafetyFull column action

SWELLEX ADVANTAGES

04/28/23

GDE Sales Conference 2007

Mn12 / Pm12 Pm16 Bitumen-Coated Mn24 / Pm24

Plastic-Coated

SWELLEX BOLTS PORTFOLIO

Pm24Connectable Pm24Hanger

Pm24Connectable

Retainer Section

04/28/23

GDE Sales Conference 2007

Swellex Mn12 & Pm12 32 mm 39 mm27 mm

Swellex Mn24 & Pm24 43 mm 52 mm36 mm

Swellex Mn16 & Pm16 43 mm 52 mm36 mm

Initial Profile Min Hole diameter Max hole diameter

INSTALLATION HOLE DIAMETER

04/28/23

GDE Sales Conference 2007

30 35 40 45 5038

300

200

100

StandardSwellex & Mn12

SuperSwellex & Mn24

kN/mFr

ictio

nal r

esis

tenc

e

Hole diameter (mm)

MidiSwellex & Mn16

Traction Test in Granite

Resistencia a la Fricción vs. Diámetro del Taladro

04/28/23

GDE Sales Conference 2007

Diámetro de la broca

Bit Gauge

04/28/23

GDE Sales Conference 2007

SWELLEX PREMIUM LINE

Swellex ® Premium

Pm12 Pm16 Pm24

Yield Load kN 100 130 200

Min. Breaking Load kN 120 160 240

Min. Elongation % 15 10 10

04/28/23

GDE Sales Conference 2007

Swellex ® Manganese

Heat Treated Mn12 Mn16 Mn24

Yield Load kN* 75 N/A 150

Min. Breaking Load kN 100 N/A 200

Min. Elongation % 20 - 25 N/A 20 - 25

SWELLEX MANGANESE LINE

04/28/23

GDE Sales Conference 2007

RESULTADO: un perno superior

Un perno que produce mas trabajo!

Alta capacidad de carga yal mismo tiempo

Alta capacidad de absorción de energía

Swellex Mn

04/28/23

GDE Sales Conference 2007

TYPES OF STEEL BASICS

04/28/23

GDE Sales Conference 2007

SwellexSwellex

Cohesive Material Frictional Material Clay Shale Limestone Granit Sansdstone Breccia Sand

HARD & COHESIVE ROCK

In hard rock Swellex profile will deform regularly accordingly with small irregularities in the hole. Anchorage in a combination of small (differential) mechanical interlocking and friction. As hard rock do not deform plastically, better anchorage will be reached when hole diameter in the upper recommended range (larger hole) to maximize the area of contact.

ROCK MECHANICS ANCHORAGE

SWELLEX ANCHORAGE MECHANISM

04/28/23

GDE Sales Conference 2007

SwellexSwellex

Cohesive Material Frictional Material Clay Shale Limestone Granit Sansdstone Breccia Sand

ROCK MECHANICS ANCHORAGE

SWELLEX ANCHORAGE MECHANISMSOFT & NON-COHESIVE ROCK

In soft rock, Swellex profile will deform irregularly, compressing the rock, accordingly with variation of plastic property of the rock in the hole (non-homogeneity). Anchorage in a combination of large mechanical interlocking and friction. As soft rock will deform plastically, better anchorage will be reached with hole diameters in the lower recommended range (small hole) to maximize the fluctuation of profile diameter in the hole.

04/28/23

GDE Sales Conference 2007

Active, radial forces

increase the friction

on the surfaces of the joints

Radial expansion

increases

the friction coefficient in

granular material

SWELLEX en roca fracturada

- In soft rock, macro deformation variations along the profile provide strong interlock.

04/28/23

GDE Sales Conference 2007

Confinamiento radial

Alojamiento en el taladro

Presión de la placa sobre la roca

Soporte de carga libre

Acción dominante del bloque

Desarrollo del arco

Confinamiento de la roca

Comportamiento Del Perno Swellex

04/28/23

GDE Sales Conference 2007

SWELLEX PLATES AND WASHER PORTFOLIO

Adjustable face plate for optimal load distribution, even in case of angled hole direction

04/28/23

GDE Sales Conference 2007

1 Swellex Bolt and Plate

2 Chuck 3Installation

Arm

we ell xS ®

4Swellex Pump

Principal components SWELLEX System

INSTALLATION COMPONENTS

04/28/23

GDE Sales Conference 2007

Pneumatic

Electric

Hydraulic

SWELLEX PUMPS PORTFOLIO

04/28/23

GDE Sales Conference 2007

ARMS & CHUCKS PORTFOLIO

04/28/23

GDE Sales Conference 2007

INSTALLATION METHODS

MANUAL INSTALLATION

04/28/23

GDE Sales Conference 2007

INSTALLATION METHODS

SEMI MECHANIZED INSTALLATION

04/28/23

GDE Sales Conference 2007

INSTALLATION METHODS

MECHANISED INSTALLATION

04/28/23

GDE Sales Conference 2007

1. SLIP PULL TEST2. DESTRUCTIVE PULL TEST3. NON-DESTRUCTIVE PULL TEST

PULL TESTS

04/28/23

GDE Sales Conference 2007

QUALITY ASSURANCE on the Field

PULL TEST EQUIPMENT

The Pull Test Equipment is used to control the anchorage capacity and the integrity of Swellex bolts.Note: Sleeves are required to perform slip test (anchorage capacity test)

Pull Test Equipment Complete for Mn12/Pm12, Mn16/Pm16 & Mn24/Pm24

8613 1108 00

Sleeve for Mn12/Pm12: 150mm length 3128 3139 75

Sleeve for Mn16/Pm & Mn24/Pm24: 150mm length 3196 2302 00

04/28/23

GDE Sales Conference 2007

PULL TESTS SLIP

SLIP PULL TEST

The slip pull test is done to determine the anchorage capacity of Swellex. Sleeves are slid on the profile in order to limit the length of the profile inflated (in contact) in the hole and authorize sliding of the bolt when pull tested.

Ex. A Mn12 having a “free” length (not covered by sleeve) of 0,3m is inflated in a 38mm holes in granite. Performing a pull test, sliding occurs at 60kN. The anchorage capacity can them be calculated; 60kN / 0,3m = 200kN/m for 38mm hole diameter in granite.

Slip pull-test are requested to:– Give engineers information for rock support

design.– Anchorage capacity in the different types of

rocks– Effect of hole diameter on the anchorage

capacity

04/28/23

GDE Sales Conference 2007

DESTRUCTIVE PULL TEST

A destructive pull tests gives information on the ultimate capacity of the Swellex bolt. Important information can be collected on the behavior of Swellex in the rock matrix. It is the best way to assess bolts condition, evaluate corrosion effect on old bolts and to compare results to original specification.

Destructive pull-tests are giving information on:

– Behavior of Swellex in the rock Mode of failure Total deformation prior to failure Progressive debonding

– Steel performances Max strength Deformation

PULL TESTS DESTRUCTIVE

04/28/23

GDE Sales Conference 2007

NON DESTRUCTIVE PULL TEST

Non destructive pull tests are performed to assess bolts performance up to a set value usually located in the elastic behavior of the bolt. This test offer the advantage of testing the Swellex bolts without damaging the bolt or affecting the surface support. It is the best test to monitor bolts performance in time.

Non destructive pull tests are useful:– To control Swellex quality without affecting

the bolt To assess that minimum performance

requested are met if corrosion is suspected

To evaluate that minimum performance are reached in time

– Steel performances Minimum strength

PULL TESTS NON-DESTRUCTIVE

04/28/23

GDE Sales Conference 2007

Aplicaciones SWELLEX

04/28/23

GDE Sales Conference 2007

Rock Pre-ReinforcementTunnel Front

Tunnel front stabilization in soft formations and fault zones

04/28/23

GDE Sales Conference 2007

Rock Pre-Reinforcement Tunnel Enlargement

04/28/23

GDE Sales Conference 2007

Rock Pre-ReinforcementTunnels

No damages to the cutting tools

TBM Road Headers

04/28/23

GDE Sales Conference 2007

COMING SOON….

The Roofex - A New Rock Bolt!

04/28/23

GDE Sales Conference 2007

The new Roofex

Stop Element

Sleeve

Sliding Element

Sleeve Bar Plate Nut

Description of details

04/28/23

GDE Sales Conference 2007

The new Roofex Rx 10

Adapts itself to ground movements

Has a patented sliding element over a high strength steel bar

Provides constant load capacity at 75 kN in static loading conditions

Can absorb 20 kJoules of energy on a single event

Can still provide a 100 kN maximum load capacity after sliding is complete

The future of deep mine rock bolting

04/28/23

GDE Sales Conference 2007

Can be installed with resin or cement grout

Can be manufactured in most standard length

Can have the pre-set sliding distance choosen during manufacturing ( 60 cm is the maximum recommended)

The new Roofex Rx 10

The future of deep mine rock bolting

04/28/23

GDE Sales Conference 2007

RoofexSection after installation

Protection tubeStop Element

Steel BarSliding Element

ResinProtection tube

04/28/23

GDE Sales Conference 2007

Roofex in yielding ground

We want to control this!

04/28/23

GDE Sales Conference 2007

RoofexBolt sliding under design load

Distance [mm]

Forc

e [k

N]

04/28/23

GDE Sales Conference 2007

RoofexBolt after having reached the end of the defined sliding length(=stop element hits bale)

Forc

e [k

N]

Distance [mm]

Results of multiple tests

04/28/23

GDE Sales Conference 2007

RoofexThe bolt takes load up to the UL of the rebar before failing

Distance [mm]

Forc

e [k

N] Results of

Multiple tests

04/28/23

GDE Sales Conference 2007

Roofex Targeted Applications: Dynamic Failure Events

04/28/23

GDE Sales Conference 2007

Roofex in dynamic events

Impact Tests on Rx10Bolt can still hold more than 95 kN

ultimate load after the impact

Load vs displacement

0

20

40

60

80

100

120

0 20 40 60 80 100 120 140 160 180 200

Plate displacement (mm)

Load

(kN)

Roofex 60 cm Set Displacement

0,00

2,00

4,00

6,00

8,00

10,00

12,00

0,00 200,00 400,00 600,00Plate Displacement (mm)

Load

(Ton

s) Test B - 5kJTest C - 5 kJTest D - 5 kJTest E - 15 kJTest F - 20 kJTest G - 27 kJ

Bolt Failure

04/28/23

GDE Sales Conference 2007

New rock bolt with a patented sliding system that delivers consistent load displacement properties

Installation as simple as another conventional rock bolt

Can handle large deformations

Can handle large impact loads

Displacement length can be defined during manufacturing

The new Roofex Rx 10The future of deep mine rock bolting

04/28/23

GDE Sales Conference 2007

FUTURE PRODUCTS

Roofex: Introduction in 2008

R32L Galvanized: documentation to be completed

E1 Swellex pump available now

EC1 Swellex pump planned for early 2008

T100 under development: for 2008

04/28/23

GDE Sales Conference 2007

QUALITY CONTROL DURING MANUFACTURE

Swellex– IST System– Profile Inflation Test– Profile and Bushing Strength Tests

SDA Bars testing – raw material and end product– Coupling testing with external certification

04/28/23

GDE Sales Conference 2007

We are committed to your superior productivity throughinteraction and innovation.