Risk Assesment

Post on 31-Aug-2014

104 views 2 download

description

 

Transcript of Risk Assesment

Creative Media Production

Risk Assessment

Name

Project

Location Nunnington hall

Hazard Person(s) / Equipment at Risk

Risk Control Taken

Severe weather, such as rain or snow, etc.

Camera Don’t take photos when the weather

forecast is bad or at least, use cover.

Tripping or falling over equipment

Person on sight, equipment

Make sure wires, legs etc are clearly pointed

out

Animals People on sight, equipment

Make sure everyone knows not to disturb

the local wildlife

Traffic (Carpark) Persons 4Make sure you look around when on roads for oncoming traffic

Electrical equipmentAny electrical props Don’t allow rain to

damage equipment

What Health and Safety legislation might you need to consider in this project?

69