Review of Power System Operation

2009

Michael Kelly

Daily Load Shape

2006

Daily Load Shape

2007

Daily Load Shape

2008

Daily Load Shape

2009

Demand Reduction

Wind Stats

• 1161 MW installed (30/9/09)

– 16% of total capacity installed 7,174 MW(6,013+1,161)

• 999 MW max output (12/8/09)

– 43% of system demand (8/9/09)

• 0.1% of energy dispatched off (year to 30/9/09)

Wind PenetrationWind as percentage of System Demand

2009 daily min and max values

0

5

10

15

20

25

30

35

40

45

50

01

/01

/09

15

/01

/09

29

/01

/09

12

/02

/09

26

/02

/09

12

/03

/09

26

/03

/09

09

/04

/09

23

/04

/09

07

/05

/09

21

/05

/09

04

/06

/09

18

/06

/09

02

/07

/09

16

/07

/09

30

/07

/09

13

/08

/09

27

/08

/09

10

/09

/09

24

/09

/09

Date

%

Min 0.18 % on 13th Aug 2009 Max 43.2 % on 8th Sep 2009

Impacts• Lower risk of supply shortage

– Greater opportunity for transmission and generation maintenance

– Amber alerts 2008 = 33, 2009 = 2 (to date)

• Changed running regimes– Base load to mid merit

– Mid merit to peaking

• Greater Opportunity for transmission maintenance– Localised transmission restrictions

North West Transmission System• 2nd Oct 13:29

– 2 110kV lines on maintenance

– high wind and low demand

– 110kV Line from Golagh to Cathleen’s Fall is over loaded

Increasing Cycling of Generators

No of starts 2008 2009 % Increase

Base Load units 149 188 26%

Total Starts 5882 7254 23%

Performance Monitoring Why?• Need to know capability of system:

– Existing: Performance vs Standard– Impact of Changes e.g. Generation Portfolio

• Grid Code– Non Compliance of one user can result in lack

of access for another user and / or cost to end customer

Performance Monitoring What?

• Looked at some metrics from existing systems

• Will be discussing these with Users

• Developing a software system to produce regular reports

• Incentives…

• Contact: anne.trotter@eirgrid.com

Best New Entrant

Wind Farm Control

• Direct control of 457 MW of wind from NCC

• Example

– 2nd Oct 13:29

– 110kV Line from Golagh to Cathleen’s Fall is over loaded

Winter 2009/2010

• Available Capacity– Conventional 6,013 MW– Wind 1,250 MW installed, 250 MW reliance

• Peak – 4,680 MW– 226 MW below 4,906 MW in December 2007