Scope of the EIS System
Engineering Geological and
Geohazard Assessment
8/3/2019 Report - Scope of the EIS System
3/56
Scope of the EIS System
Environmentally Critical
Projects (ECPs)
Projects located inEnvironmentally Critical
Areas (ECAs)
8/3/2019 Report - Scope of the EIS System
4/56
Environmentally Critical Projects (ECPs)
Heavy Industries
Non-Ferrous Metal Industries
8/3/2019 Report - Scope of the EIS System
5/56
Environmentally Critical Projects (ECPs)
Heavy Industries
Iron and Steel Mills
8/3/2019 Report - Scope of the EIS System
6/56
Environmentally Critical Projects (ECPs)
Heavy Industries
Petroleum and Petro-Chemical
Industries
8/3/2019 Report - Scope of the EIS System
7/56
Environmentally Critical Projects (ECPs)
Heavy Industries
Smelting Plants
8/3/2019 Report - Scope of the EIS System
8/56
Environmentally Critical Projects (ECPs)
Heavy IndustriesResource Extractive Industries
Major Mining and Quarrying Projects
8/3/2019 Report - Scope of the EIS System
9/56
Environmentally Critical Projects (ECPs)
Resource Extractive Industries
Forestry Projects
Logging
8/3/2019 Report - Scope of the EIS System
10/56
Environmentally Critical Projects (ECPs)
Resource Extractive Industries
Forestry Projects
Major Wood
ProcessingProjects
8/3/2019 Report - Scope of the EIS System
11/56
Environmentally Critical Projects (ECPs)
Resource Extractive Industries
Forestry Projects
Intro. of Fauna in
Public/PrivatePlaces
8/3/2019 Report - Scope of the EIS System
12/56
Environmentally Critical Projects (ECPs)
Resource Extractive Industries
Forestry Projects
Forest
Occupancy
8/3/2019 Report - Scope of the EIS System
13/56
Environmentally Critical Projects (ECPs)
Resource Extractive Industries
Forestry Projects
Extraction of
MangroveProducts
8/3/2019 Report - Scope of the EIS System
14/56
Environmentally Critical Projects (ECPs)
Resource Extractive Industries
Fishery Projects
Dikes for/and
FishpondDevelopment
Projects
8/3/2019 Report - Scope of the EIS System
15/56
Environmentally Critical Projects (ECPs)
Infrastructure ProjectsResource Extractive Industries
Major Dams
8/3/2019 Report - Scope of the EIS System
16/56
Environmentally Critical Projects (ECPs)
Infrastructure Projects
Major Power Plants
8/3/2019 Report - Scope of the EIS System
17/56
Environmentally Critical Projects (ECPs)
Infrastructure Projects
Major Reclamation Area
8/3/2019 Report - Scope of the EIS System
18/56
Environmentally Critical Projects (ECPs)
Infrastructure Projects
Major Roads and Bridges
8/3/2019 Report - Scope of the EIS System
19/56
Environmentally Critical Projects (ECPs)
Infrastructure ProjectsGolf Course Projects
8/3/2019 Report - Scope of the EIS System
20/56
Environmentally Critical Projects (ECPs)
Infrastructure Projects
Golf Course Projects
Heavy Industries
Resource Extractive Industries
8/3/2019 Report - Scope of the EIS System
21/56
Environmentally Critical Projects (ECPs)
Resource Extractive Industries
Infrastructure Projects
Golf Course Projects
Heavy Industries
Projects located in
Environmentally Critical Areas (ECA)
8/3/2019 Report - Scope of the EIS System
22/56
Projects located in
Environmentally Critical Areas (ECA)
All areas declared by law as national
parks, watershed reserves, wildlife
preserves, and sanctuaries.
8/3/2019 Report - Scope of the EIS System
23/56
Projects located in
Environmentally Critical Areas (ECA)
Areas set aside as aesthetic potential
tourist spots
8/3/2019 Report - Scope of the EIS System
24/56
Projects located in
Environmentally Critical Areas (ECA)
Areas which constitute the habitat for
any endangered or threatened
species of indigenous Philippinewildlife (flora and fauna)
8/3/2019 Report - Scope of the EIS System
25/56
Projects located in
Environmentally Critical Areas (ECA)
Areas of unique historic
archaeological or scientific interest
8/3/2019 Report - Scope of the EIS System
26/56
Projects located in
Environmentally Critical Areas (ECA)
Areas which are traditionally
occupied by cultural communities or
tribes (indigenous culturalcommunities)
8/3/2019 Report - Scope of the EIS System
27/56
Projects located in
Environmentally Critical Areas (ECA)
Areas frequently visited and/or hard-
hit by natural calamities (geologic
hazards, floods, typhoons, volcanicactivity, etc.)
8/3/2019 Report - Scope of the EIS System
28/56
Projects located in
Environmentally Critical Areas (ECA)
Areas with critical slopes
8/3/2019 Report - Scope of the EIS System
29/56
Projects located in
Environmentally Critical Areas (ECA)
Areas classified as prime
agricultural lands
8/3/2019 Report - Scope of the EIS System
30/56
Projects located in
Environmentally Critical Areas (ECA)
Recharged areas of aquifers
8/3/2019 Report - Scope of the EIS System
31/56
Projects located in
Environmentally Critical Areas (ECA)
Water bodies characterized by one or
any combination of the following
conditions:
tapped for domestic purposes;
within the controlled and/or
protected areas declared by
appropriate authorities
8/3/2019 Report - Scope of the EIS System
32/56
which support wildlife and fishery
activities
8/3/2019 Report - Scope of the EIS System
33/56
Projects located in
Environmentally Critical Areas (ECA)
Mangrove areas characterized by one
or any combination of the following
conditions:
with primary pristine and dense
young growth
adjoining mouth of major river
systems
8/3/2019 Report - Scope of the EIS System
34/56
near or adjacent to traditional
productive fry or fishing grounds
which act as natural buffers
against shore erosion, strong
winds and storm floods
on which people are dependent for
their livelihood
8/3/2019 Report - Scope of the EIS System
35/56
Projects located in
Environmentally Critical Areas (ECA)
Coral reefs characterized by one or
any combination of the following
conditions:
with fifty percent (50%) and above
live coralline cover
spawning and nursery grounds for
fish
8/3/2019 Report - Scope of the EIS System
36/56
which act as natural breakwater of
coastlines.
8/3/2019 Report - Scope of the EIS System
37/56
Engineering Geological and Geohazard
Assessment
Section 1 of DENR
Administrative Order
No. 2000-28
8/3/2019 Report - Scope of the EIS System
38/56
Engineering Geological and Geohazard
Assessment
...it is hereby required thatall proponents of any
project shall undertake an
Engineering Geological andGeohazard Assessment.
8/3/2019 Report - Scope of the EIS System
39/56
EGGA Procedural Flowchart
ProponentMOA
GovernmentPrivate
GSS GSS
EGGA EGGA
Review Review
8/3/2019 Report - Scope of the EIS System
40/56
EGGA Procedural Flowchart. . . cont. . .
Final
EGGA
RevisionEndorsement
Endorsement
8/3/2019 Report - Scope of the EIS System
41/56
Engineering Geological and Geohazard
Assessment Report
Components:
1. Geologic Hazards
2. Hydrologic Hazards
8/3/2019 Report - Scope of the EIS System
42/56
Engineering Geological and Geohazard
Assessment Report Components
Fault Related or Seismic Hazards
Ground Acceleration
Ground Rupture
Geologic Hazards
Liquefaction
Differential Settlement
8/3/2019 Report - Scope of the EIS System
43/56
Engineering Geological and Geohazard
Assessment Report Components
Fault Related or Seismic Hazards
Landslides
Fault Creep
Geologic Hazards
Lateral Spread
Tsunami
8/3/2019 Report - Scope of the EIS System
44/56
Engineering Geological and Geohazard
Assessment Report Components
Fault Related or Seismic Hazards
Seiches
Geologic Hazards
8/3/2019 Report - Scope of the EIS System
45/56
Engineering Geological and Geohazard
Assessment Report Components
Fault Related or Seismic Hazards
Landslides
Fall
Geologic Hazards
Topple
Slump
Mass Movement
Slide
8/3/2019 Report - Scope of the EIS System
46/56
Engineering Geological and Geohazard
Assessment Report Components
Landslides
Spread
Geologic Hazards
Fall
Complex
Mass Movement
8/3/2019 Report - Scope of the EIS System
47/56
Engineering Geological and Geohazard
Assessment Report Components
Landslides
Geologic Hazards
Mass Movement
Creep
Subsidence
Settlement
8/3/2019 Report - Scope of the EIS System
48/56
Engineering Geological and Geohazard
Assessment Report Components
Lava Flow
Geologic Hazards
Mass Movement
Debris Flow
Pyroclastic Flow
Debris Avalanche
Volcanic Hazards
8/3/2019 Report - Scope of the EIS System
49/56
Engineering Geological and Geohazard
Assessment Report Components
Lahar
Geologic Hazards
Lateral Blast and Pyroclastic
Surge
Bombs and Ballistic
Projectiles
Volcanic Hazards
8/3/2019 Report - Scope of the EIS System
50/56
Engineering Geological and Geohazard
Assessment Report Components
Ash Fall
Geologic Hazards
Tsunami
Flooding
Volcanic Gases
Volcanic Hazards
8/3/2019 Report - Scope of the EIS System
51/56
Engineering Geological and Geohazard
Assessment Report Components
Volcanic Earthquakes
Geologic Hazards
Volcanic Hazards
8/3/2019 Report - Scope of the EIS System
52/56
Engineering Geological and Geohazard
Assessment Report Components
Flooding (Overflow)
Geologic Hazards
Fluvial
Hydrologic Hazards
Scouring of Riverbed
Flooding (Sheetflow,concentrated run-off
8/3/2019 Report - Scope of the EIS System
53/56
Engineering Geological and Geohazard
Assessment Report Components
Channel Erosion and Migration
Fluvial
Hydrologic Hazards
Sedimentation
Rill Erosion
Gully Erosion
8/3/2019 Report - Scope of the EIS System
54/56
Engineering Geological and Geohazard
Assessment Report Components
Flooding
Fluvial
Hydrologic Hazards
Storm Surge
Coastal Erosion
Coastal Aggradation
Coastal Hazards
8/3/2019 Report - Scope of the EIS System
55/56
Engineering Geological and Geohazard
Assessment Report Components
Coastal Subsidence/Sea Level
Rise
Hydrologic Hazards
Submarine Landslide
Coastal Hazards
8/3/2019 Report - Scope of the EIS System
56/56