RENOVATION WORK AT MAKERERE UNIVERSITY FINAL WORK

Post on 08-Jul-2015

54 views 2 download

description

A MUST READ PRESENTATION ABOUT MAKERERE UNIVERSITY KAMPALA UGANDA

Transcript of RENOVATION WORK AT MAKERERE UNIVERSITY FINAL WORK

RENNOVATION WORKS AT

MAKERERE UNIVERSITY

ZURA AHMED 10/U/2556

AND

GILBERT ALITWIJUKA

10/U/2551

RENOVATION WORK AT MAKERERE UNIVERSITY

MULTI MEDIA CLASS 2014 JCO4201

LECTURER KAKOOZA FRED

COMMUNICATION CLASS

THE MAIN BUILDING WAS RENOVATED LAST YEAR

INSTITUTE IS UNDER CONSTRUCTION.

RENOVATION WORK AT THE HALLS OF RESIDENCE.

MICHELE HALL IS ONE OF THE HALLS THAT WERE RENOVATED

THE MAIN BUILDING WAS RENOVATED LAST YEAR

The main library is one of the structures that were expanded

INSTITUTE IS UNDER CONSTRUCTION.

A site next to social sciences which is yet to be renovated