2

OutlineOutline

1. What we do

2. How we do it

3. How to structure projects

4. Why it is worth doing

3

1.1.

Fibrowatt has Fibrowatt has commissioned commissioned America’s firstAmerica’s first

Poultry Litter Fuelled Poultry Litter Fuelled Power PlantPower Plant

3

4

The 55MW Fibrominn The 55MW Fibrominn PlantPlant

4

Commissioning began in May 2007

5

Poultry Litter Fueled Power PlantsPoultry Litter Fueled Power Plants

• Generating renewable electricity from poultry litter

• Well proven technology (14 year operating record in the UK)

• Carbon neutral

• Improves and protects water resources

• Improves sustainability and biosecurity for poultry farmers

• Recovering value from the nutrients by selling the ash fertilizer

Biomass power has an important place in rural communities

6

Who is Fibrowatt?Who is Fibrowatt?

• Fibrowatt LLC, based in PA

• The founders built the world’s first three poultry litter fuelled power plants in the UK

• Fibrowatt’s Minnesota plant is currently being commissioned

– A 55 megawatt, 700,000 ton/year turkey litter plant– The first in the US– Development work began 1999– Financed with $202m of investment grade rated debt in December 2004– Commercial Operations will commence in August 2007

50MW Projects under development in North Carolina, Arkansas, Mississippi and Maryland

7

2.2.

How Power From Poultry How Power From Poultry Litter WorksLitter Works

7

8

Poultry HousesPoultry Houses

9

Covered ConveyorCovered Conveyor

10

Loading the TruckLoading the Truck

11

Tarpaulin CoverTarpaulin Cover

12

Truck on ScalesTruck on Scales

13

Fuel DeliveryFuel Delivery

14

Trucks UnloadingTrucks Unloading

15

Thetford Fuel HallThetford Fuel Hall

16

TruckTruckCleaningCleaning

17

How it WorksHow it Works

18

Inside Inside the the

BoilerBoiler

19

3.3.

How to Jump-Start How to Jump-Start ProjectsProjects

19

20

How Long Does It Take?How Long Does It Take?

20

1. Development phase2 - 4 years

2. Construction phase2 – 3 years

TOTAL 4 – 7 YEARS

21

What Does It Cost?What Does It Cost?

21

1. Development phase: $3-10M

2. Construction phase: $150-200M

22

What are the key requirements?What are the key requirements?

22

1. Fuel – adequate fuel already available

2. Sites – multiple sites already offered

3. Electricity contracts – federal incentives needed

23

Facilitating the ProjectsFacilitating the Projects

• 1.9 ¢/kWh Production Tax Credit (§45)– To level the playing field

– Poultry Litter should get the same incentives as Wind

• Placed-in-Service Deadline needs to be 7-10 years out– Our plants take 2-4 years to develop, design, permit & finance

– Construction takes at least a further 2½ years

• Option to select 30% Investment Tax Credit– Same incentive as Solar Power

• Ability to utilize tax-exempt bonds

23

24

4.4.

Why it is worth doing Why it is worth doing

24

25

Multiple Benefits of our PlantsMultiple Benefits of our Plants

• Renewable Energy– Producing green, carbon-neutral power from domestic resources

– 750MW of identifiable projects

• Pollution Reduction– Reducing groundwater contamination from excess animal waste

• Agricultural Sustainability– Rural economic development

– Enabling the poultry industry to maintain sustainable growth

– Enhancing bio-security for poultry farmers

– Supporting the Family Farmer

25

26

27

28

Challenge & OpportunityChallenge & Opportunity

• Renewable Power from Poultry Litter is (currently) more expensive than Coal

• There is significant potential– The poultry industry is concentrated in Southern States, which have little wind resource

• A viable renewable energy option for Southern States28

Projects Currently Planned

North Carolina 3 plants 155MW

Arkansas 2 plants 110MW

Georgia 2 plants 110MW

Alabama 2 plants 105MW

Mississippi 1 plant 55MW

Maryland 1 plant 45MW

Other States 4 plants 160MW

Total 15 plants 750MW

29

NUTRIENTS

CARBON (CO2)

Flue Gases

Ash

ELECTRICITY