Post on 06-Nov-2021
Template provided by: “posters4research.com”
Introduction
There are internal and external problems
faced by JKR. In addition to dealing with
problems that are often disrupted road and
management problems also cause several road
projects delayed. This because the road to face
problems such as frequency of surface, holes in
the road, cracks, and the depth of the hole.
Therefore, JKR decided criteria based
standard specifications for road construction
and the appointed contractor must fulfill the
conditions set.
Research Question
RQ1: What a way or method of execution
used by the JKR in the management and
maintenance of roads?
RQ2: What management JKR makes an
assessment of the procedure for the
appointing of a contractor project
management?
ABSTRACT
INTRODUCTION
CONCLUSIONS AND RECOMMENDATION
ROAD MAINTENANCE MANAGEMENT SYSTEM AND THE APPOINTMENT OF CONTRACTORS IN JKR KEDAH
This thesis discusses the problems faced by the JKR in the management of road maintenance. Issues such as road perishable can be a danger to
consumers. My research is in Kampung Sungai Korok Jitra Kedah. Objective excavation of this thesis is to identify road maintenance management
systems and identify the procedure for the appointment of contractors by the JKR. In addition, there are three main methods in the management of roads
that can be implemented as ordinary maintenance, regular maintenance and emergency maintenance. Contractors appointed must also have expertise in
repairing roads and must be appointed by the appropriate method.
• To identify a management and maintenance of roads
by the JKR over Kubang Pasu District area.
• To identify the procedures in appointing a contractor
for JKR project management.
OBJECTIVE/S
RESULTS
JKR management, particularly in addressing the problem of road damage and determine common methods used to appoint contractor for road maintenance
projects. The results show that management is very important within the organization. Poor management will lead to various problems that plague. However, the
best management can make something work to achieve the quality and the user will be satisfied. Therefore, the role of all the important and essential part in
achieving success. Appointing a contractor must follow specifications so as not to cause prejudice against the organization. If all these aspects are practiced
certainly the image of an organization will be better in line with the country in achieving Vision 2020.
Recommendations for the future research is important to ensure that future research more effective. Other researchers can use other methods to research such
as observation and interview data to be obtained more accurately. Researchers can also learn about the best management in the organization.
From the result, the highest mean of maintenance, factor
effect, method and procedure.
Summary Of Descriptive Statistic
Pearson correlation results verify that all the research
hypotheses are accepted, but there is strong relationship
between procedure and factor effect.
Questionnaire Use SPSS Pilot Test
Correlation & Normality test
METHODS
RESEARCH FRAMEWORK
DEPENDENT VARIALES
*Guarantee
quality success
INDEPENDENT VARIABLES *Maintenance *Factor effect *Method *Procedure
Maintenance 0.221
Factor Effect 0.506
Method 0.359
Procedure 0.511
ITEMS DETAILS PERCENTAGE (%)
Gender Male 73.0
Age group 31-40 33.5
Race Malay 80.5
Education level UPSR/PMR/SPM
/STPM/STAM
48.8
Year period use road 21-40 47.9
N Mean
Maintenance 215 3.8217
Factor effect 215 3.8512
Method 215 4.0872
Procedure 215 3.6535
Summary Result for Respondents Demographics
Summary Of Realibility Statistics
RELIABILITY STATISTICS
Cronbach's Alpha Cronbach's Alpha Based
on Standardized Items
N of Items
.723 . 648 21
Summary Of Correlations
Reliability is the correlation of an item, scale or
instrument with a hypothetical one which truly measures
what it is supposed to.
Kolmogorov-Smirnova Shapiro-Wilk
Statistic df Sig. Statistic
df Sig.
Maintenance .162 215 .000 .928 215 .000
Factor effect .145 215 .000 .962 215 .000
Method .205 215 .000 .487 215 .000
Procedure .092 215 .000 .976 215 .001
a. Lilliefors Significance Correction
Summary Of Normality Test
Shapiro- Wilk shows significant value of each category
of questions. Refers to the graph if the data are
normally distributed, the data points will be meeting
over the line. Q-Q plot of the graph we can see
normally distributed data.