Post on 28-Mar-2016
description
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
TECHNICAL CO-OPERATIONAND CONSULTANCY PROGRAMME RELATED
TO THE INTEGRATED CONSERVATIONOF THE CULTURAL AND NATURAL HERITAGE
Reconstruction Implementation Commission for Serbian Orthodox Religious sites in Kosovo*
* All reference to Kosovo, whether to the territory, institutions or populations, in this text shall be understood in full compliance with United Nations Secu-rity Council Resolution 1244 and without prejudice to the status of Kosovo
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 3
This publication describes in words and images the remarkable work of the Reconstruction Implementation Commission (RIC) from 2004
through 2010. It demonstrates the success of a unique and historic project that has been underpinned by a strong sense of collective responsibility for protecting cultural heritage and the promotion of a greater understand-ing between cultures and religions. The publication has been designed to draw attention to the achievements of the RIC, initiated by the Council of Europe, the European Union and the United Nations Interim Administra-tion Mission in Kosovo (UNMIK) during a particularly challenging period of history in Kosovo1.
The Council of Europe’s role in conflict prevention and post-conflict management is rooted in the Organisation’s core values of human
rights, democracy and the rule of law. Historically, cultural heritage has been a critical contested issue and a key source of conflict, acts of both destruction and rebuilding having strong symbolic and practical implica-tions. Similarly, cultural heritage has been fundamental to processes of conflict resolution and reconstruction, linked to efforts to recognise the multiple identities of a community and protect the rights of individuals to different cultural expressions and beliefs. The contribution of heritage to local development has become a vital tool in rebuilding, partly because of its enormous potential to contribute significantly to economic, social and educational development processes2. A respect for the value of cultural di-versity and pluralism is fundamental to cohesion and stability.
The publication describes the background to the RIC, the process, the important working structures, partnerships, and the mechanisms that
have been created to manage the project and that have achieved strong tangible and intangible results. The evidence shows the success of the col-lective efforts, enthusiasm and genuine interest of all the stakeholder in-stitutions, many local and international experts and individuals who have worked to overcome important challenges along the way. It is they who together have kept the process moving forward by means of an approach founded on multi-ethnic collaboration, dialogue and common consensus. For this reason, the RIC is a model worthy of evaluation and attention.
Robert PalmerDirector of Democratic Governance, Culture and Diversity
Read more >
I would like to take this opportunity to thank the numerous people who have been in-volved in this exciting joint venture. In addition to my own dedicated teams in Stras-
bourg and Pristina, I would like to mention in particular the Serbian Orthodox Church, the Ministry of Culture, Youth and Sport, and the Institutes for the Protection of Monu-ments in Belgrade and Kosovo, together with UNMIK, the European Commission Li-aison Office to Kosovo and its predecessor the European Agency for Reconstruction. It has been the strong human factor and the will of all local and international partners that has ensured the success of the RIC mechanism that has led to the restoration of 28 religious sites in Kosovo, further 2 sites managed and financed by UNESCO, 2 sites managed and financed by the European Union and one non-religious site managed and financed by the Ministry of Culture, Youth and Sport, all of which were damaged during the events of March 2004 in Kosovo. The work did not only focus on physical reconstruction, but also professional training and public awareness.
Now that this phase of work of the RIC is coming to an end, what does the fu-ture hold for a successor mechanism, and how might we take advantage of the
achievements so far? We hope that publications and promotional events will encour-age continuing and additional support from local and international institutions and a further strengthening of common heritage and well-being of all communities in Kosovo. Proposals are currently being discussed to set up a possible sustainable ex-panded mechanism with a wider technical mandate than the current RIC, possibly embracing both religious (orthodox, islamic, catholic etc) and non-religious historic sites, as well as tangible and intangible heritage, and the development of broader partnerships. We have now embarked on an open and shared process of consultation and debate about the future in the hope of building on past achievements so that we can continue the momentum and encourage increased appreciation of cultural diversity and its practical implementation by further projects.
The Council of Europe will remain steadfastly committed to the preservation and protection of cultural and natural heritage as a means of fostering the basic prin-
ciples of human rights and democracy, and promoting the understanding of heritage as a shared source of remembrance, understanding, identity, cohesion and creativ-ity. We have gained the experience of the impact of past conflicts, and now must act with a heightened sense of responsibility for the generations that come after us.
1 All references to Kosovo, whether the territory, institutions or population, in this text shall be understood in full com-pliance with United Nation’s Security Council Resolution 1244 and without prejudice to the status of Kosovo.
2 Refer to the Council of Europe Framework Convention on the Value of Cultural Heritage for Society, 2005, CETS No. 199, which came into force on 1 June 2011.
Page 4
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 5
The European Union highly appreciates the achievements of the Re-construction Implementation Commission. The RIC is an EU-funded
mechanism since 2005 managed and chaired by the Council of Europe. It supports the implementation of Kosovo’s European Agenda, namely the respect for the rights of the members of communities as well as Kosovo1
economic development.
According to RIC’s mandate 32 Serbian Orthodox sites have benefited from rehabilitation and conservation works. Kosovo should be com-
mended for funding these important works. The RIC’s achievements were also realised thanks to the cooperation of the other RIC members includ-ing Serbian and Serbian Orthodox Church officials.
This continuous process has led to a significant and tangible contribu-tion towards preserving the diversity of heritage present in Kosovo1 as
part of our common European heritage.
The protection and promotion of Cultural Heritage in Kosovo continues however to face serious challenges. We therefore encourage all institu-
tional actors to build on this success to ensure continuity in their coopera-tion and extension of such a mechanism to all types of heritage in Kosovo.
Indeed, the ownership needs to be further fostered at local level to en-sure that relevant communities & leaders are systematically included in
discussions concerning this topic. Only through their full participation and active involvement can any cultural heritage related initiative be-come truly sustainable, in particular if its potential for economic growth starts being developed.
The European Union will continue to support Kosovo as well as any oth-er relevant parties from all communities in their work to pursue this
constructive dialogue which remains the pre-requisite for sustained rec-onciliation, inter-cultural dialogue and economic development in Kosovo.
We therefore trust that the continuation and strengthening of such a successor mechanism based on RIC model will be given careful
consideration and thought by all stakeholders.
Kjartan BjörnssonHead of Operations
1 Under UNSCR 1244/99
European Commission
Liaison Office to Kosovo
Page 6
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 7
The Council of Europe promotes the strategic objective of a Europe without dividing lines based on democracy, the
rule of law and respect for human rights. Inevitably, this in-cludes the imperatives of the cultural and social dimensions of human rights. In this respect, the social value of cultural heritage for European citizens represents one of the funda-mental principles of the Council of Europe, underpinning our approach across various field activities.
Action on the ground aims at enhancing cultural heritage as a means to promote reconciliation, intercultural dia-
logue and socio-economic development for society. Conse-quently, this perception of the built heritage as a factor for social cohesion and economic development is at the very core of the project in Kosovo, and goes beyond mere con-servation and restoration, encouraging rehabilitation and providing new uses and possibilities for the local population.
The RIC recontruction works presented in this publication are being implemented thanks to very successful partnerships
and cooperation with the European Union, the United Nations Interim Administration Mission in Kosovo, the Serbian Orthodox Church, the Kosovo institutions and the Serbian institutions. The activities carried out are a vehicle for disseminating the Council of Europe’s values and political objectives in order to promote a Eu-ropean democratic society in a wide area of peace and prosperity.
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
Read more >
Page 8
The Reconstruction Implementation Commission (RIC) was set up in Kosovo in 2004 as an implementation tool for the
reconstruction of Serbian Orthodox Churches (SOC). The RIC has provided a unique platform for dialogue between Kosovo and Serbian stakeholders, including the SOC, in order to over-come the specific difficulties connected to the political situa-tion with a genuine interest and efforts of all sides.
The United Nations Interim Administration Mission in Kos-ovo (UNMIK) invited UNESCO, the European Commission
(EC) and the Council of Europe (CoE) to perform the damage assessments. In response, the Council of Europe (Directorate of Democratic Governance, Culture and Diversity) set up an
“Emergency Action Plan for the Cultural Heritage in Kosovo” together with the European Commission, and in very close co-ordination with UNMIK. It was undertaken as an addition to the ongoing “Regional Programme for Cultural and Natural Heritage in South East Europe”.
Three joint technical assessment missions were organised by the CoE and the EC from May to July 2004 including ex-
perts from the CoE, EC, the Kosovo Provisional Institutions of Self-Government (PISG), Belgrade-affiliated experts and rep-resentatives of the Serbian Orthodox Church. These missions resulted in the publication of an overall technical assessment report of all 34 Serbian Orthodox Religious sites and one non-religious site and two further, more detailed, technical assess-ment reports of each site.
The Background
Cultural Heritage:a tool for
reconciliation and confidence
building
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 9
Based on the three technical assessment reports, a priority list was established with cost estimates and detailed pro-
posals for urgent intervention and conservation measures to
each site – medium and long term measures were also indi-
cated where possible. To implement this work, the PISG allo-
cated € 3,7 million from its budget and the then-Acting-Spe-
cial Representative of the Secretary-General of the UN (SRSG)
allocated an additional € 0,5 million from the SRSG’s reserve
funds for the reconstruction programme.
In addition to the technical assessment missions, the CoE initiated two other strategies, one of which was to take ad-
vantage of the situation to persuade the Serbian Orthodox
Church to add 11 of their monuments to the Priority Interven-
tion List established within the Regional Programme for Cul-
tural and Natural Heritage in South East Europe and therefore
integrating the list with a balanced list of monuments repre-
senting that which exists in the whole of the Kosovo region.
The second strategy was established on the initiative of the
CoE’s Secretary General, and with a view to streamlining the
international community’s efforts to preserve all cultural her-
itages of Kosovo, an “Independent International Commission
for the Cultural Heritage in Kosovo”, involving the CoE, the EC
and UNMIK was set up on 10 September 2004 to provide ad-
vice and support on policies in the medium- and long-term.
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
Read more >
Page 10
2004The Implementation
Committee
International Expert Board
2005The Reconstruction
Implementation Commission
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 11
Negotiations mediated by UNMIK between the Serbian Or-thodox Church and the PISG resulted in a Memorandum
of Understanding (MoU) signed in June 2004 by the Church and the PISG, establishing an Implementation Committee (IC) to manage and supervise the performance of urgent re-construction works. The IC worked smoothly from August un-til mid-September 2004, when the Church withdrew from the MoU and all progress on the process of reconstruction came to a halt. The Committee was dissolved.
Following numerous meetings and negotiations between UNMIK, Church representatives and Serbian authorities,
the Holy Synod confirmed that the Church would re-enter the agreement and a second MoU was signed in March 2005. On the basis of this new MoU, the Reconstruction Implementation Commission (RIC) was established and held its first plenary meeting in May 2005 – the RIC continues to meet on a monthly basis. Although the RIC was conceived as an ad hoc body for a provisional period of time, its functionality has lasted over six years. It remains the only Cultural Heritage mechanism in Koso-vo that produces results with the involvement of all stakeholders.
In recognition of the necessity to comply with European and international standards, an International Expert Board (IEB)
was established in 2006 to support and monitor the quality of the reconstruction works. The IEB, at the request of the RIC Chair-person, carries out field missions to review the quality of works and make recommendations to the RIC on ways to improve its methods in line with European and international standards.
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
Page 12
The Reconstruction Implementation Commission
The mechanismin brief
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 13
The Reconstruction Implementation Commission
The mechanismin brief
The RIC is the decision-making body responsible for the implementation process. Its mandate is clearly defined
in the Terms of Reference signed in August 2005, and subse-quently revised in May 2006 with an Addendum accepted in September 2006.
The RIC is responsible for programming and overseeing the implementation of the reconstruction works to the 34 Ser-
bian Orthodox religious sites damaged during the events of March 2004. In addition to the reconstruction activities, the RIC actively contributes to the development of capacity build-ing between the main institutions involved, as well as profes-sional training and public awareness.
The RIC is supported by a Technical Unit based in Pristina, Kosovo. This Technical Unit is supported financially by
the CoE and the EC. It is headed by a Team Leader (interna-tional expert) and comprises two Serbian and Albanian staff specialised in the fields of architecture and civil engineering. The RIC Technical Unit also deals with contract management, administration and translations. For the financial aspects, it is assisted by the financial assistant of the Joint Project “EU/CoE Support to the Promotion of Cultural Diversity in Kosovo”.
The RIC Technical Unit is responsible for the day-to-day management of contracts, procurement and administra-
tion duties, and is responsible for implementing the decisions of the RIC under the guidance of the RIC Chairperson. It has direct contact with the Ministry of Culture, Youth and Sports which has budget and procurement management responsi-bilities. A local consultant appointed by the Ministry acts as the ‘focal point’ between the Ministry and the Technical Unit to provide an efficient and direct line of communication.
THE MEMBERS OF THE COMMISSION ARE AS FOLLOWS
3 Council of Europe Representative – Chairperson
3 Serbian Orthodox Church Representative
3 Republic Institute for the Protection of Cultural Monuments, Belgrade Representative
3 Representative from the Ministry of Culture, Youth and Sports
3 Representative from the Institute for the Protection of Monuments, Pristina
3 Representative from UNMIK
RIC Technical Unit
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
Read more >
Page 14
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 15
A ll projects are prepared by the Serbian Institutions for the Protection of Cultural Monuments (IPMs) managed
through its office in Leposavic, and the preparation of contract documentation and the procurement processes are organised jointly by the Technical Unit and the Ministry of Culture, Youth and Sports (MCYS). All tenders are global, focusing on attract-ing companies from the region. The ‘Invitation to Tender No-tices’ are published in local and regional newspapers and on the RIC and CoE websites. The tenders are designed to attract companies that have experience in the construction and con-servation of Orthodox cultural heritage monuments. This ex-perience shall constitute an essential condition for the selec-tion of successful contractors. Tenders are evaluated by the RIC with observation by the MCYS procurement officer, and the recommendations are put forward to the Church for approval. The contracts are managed on site by the RIC Technical Unit.
Supervisors and consultants are appointed by the RIC to over-see the day-to-day operations of the works on site. They are
overseen by both Serbian and Albanian supervisors/consultants whose role it is to instruct the contractor and ensure that qual-ity standards are met. In principle, the supervisors/consultants are nominated through the IPM and reflect an equal balance of Albanian and Serbian representation on each project site.
Tender process
FOR FURTHER TECHNICAL INFORMATION ON TENDERS, CLICK HERE
„
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
RIC supervisors/consultants
Read more >
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 17
6.9 million euros have been committed by the Kosovo As-sembly since 2004.
1.6 million euros were committed by the European Union to manage and complete reconstruction works to two of the
RIC priority sites in Prizren.
205 000.00 euros were commited by UNESCO to manage and complete reconstruction of the Church of St Michael
in Shtime/Štimlje and the Church of St Sava in Mitrovice/K.Mitrovica.
On 13 May 2005, the Director General of UNESCO in close cooperation with UNMIK, CoE and EU, organised a donors’ conference in Paris for the purpose of the Protection and Pro-motion of Cultural Heritage in Kosovo, during which further funding was ensured for the projects implemented by UNE-SCO in parallel to the RIC process.
RIC is particularly grateful for the kind donations from:
3 The Norwegian Embassy: for the Church of St Nicholas in Prishtinë/Priština
3 The American Embassy: for the Church of St Nicholas in Prishtinë/Priština
3 The USAID and IOM: for the Church of St. Nicholas in Prishtinë/ Priština
3 The French Embassy: for the Parish House at the Church of St Nicholas in Prishtinë/Priština
3 The German Embassy: for the Church of St Elias in Vushtrri/Vuc itrn
3 The Greek Liaison Office: for the Church of St Kyriake in Prizren
3 The Greek Government for their contribution and experts’ support through the European Centre for Byzantine and Post-Byzantine Monuments in Thessalonica, for the restoration of the wall paintings at the Church of St George (Runoviˇc ) in Prizren.
In addition, the salaries of the TU, the chairperson, IEB ex-perts’ visits, web design and maintenance were made pos-
sible with generous contribution of the EU.
Funding for Reconstruction
including capital investments and
goods and services
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
Read more >
Page 18
Based on priorities defined by the RIC in consultation with the Serbian Orthodox Church, the following achievements
have been realised since 2005, promoting the opportunity for these sites to have a future and positive functional uses once more within the communities in which they stand.
30 sites - conserved, consolidated and protected as urgent action implemented in 2005
19 churches have full external works completed and some internal works completed
02 monastery konaks (guest houses) have been re-built and are habitable
08 priests’ houses are completely re-built and are habitable02 baptisteries have been restored03 free-standing belfry towers have been re-built
or repaired (bells installed)02 seminary residence has been re-roofed (external
and internal works to be completed)03 auxiliary buildings have been repaired and re-built03 perimeter walls have been repaired or re-built
The following sites have been implemented by the European Union:01 bishop’s residence reconstructed and habitable01 seminary building reconstructed and habitable
The following number of sites have been rebuilt with funding from UNESCO:02 church buildings
The EC has been supporting the RIC project programme in a direct Joint Programme contract with the CoE.
The RIC has been strongly supported by the UNMIK, particu-larly in respect of coordinating security issues with KFOR and
the police, liaising between the various stakeholders, and pro-viding coordination and logistical assistance when necessary.
The RIC has been supported by the Centre for Archaeological Re-search in “the former Yugoslav Republic of Macedonia” as well
as the European Centre for Byzantine and Post Byzantine Studies.
The RIC project represents an integral part of the Council of Europe’s Regional Programme for Cultural and Natural
Heritage in South East Europe managed by the Heritage, Tech-nical Assistance and Joint Actions with the EU Division of the Directorate of Democratic Governance, Culture and Diversity.
Partners
A mechanism supported by the
international communities
The Reconstruction Implementation Commission
THE MECHANISM IN BRIEF
Achievements
TO CONSULT ACTIVITY REPORTS, CLICK HERE„
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 19
Training
Conclusion
A mechanismwhich has proved
its worth
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
The International Expert Board composed of experts from Greece, Italy, Spain and the United Kingdom has played
an important role in initiating workshops related to the con-servation and management of European cultural heritage. A five day workshop was also hosted by the European Centre for Byzantine and Post Byzantine Studies in 2007, attended by 18 local experts nominated by the IPMs in Belgrade and Pristina.
The RIC reconstruction project has fostered a multi-ethnic and diversified approach to its work. The project has pro-
vided the opportunity to encourage and establish institu-tional capacity building, trust and confidence in Kosovo and Serbia, and between Kosovo and Serbian institutions. Further, the religious life has gradually been revitalised in some sites following the conclusion of reconstruction works.
The project has emphasised the importance of culture, not only in terms of encouraging training opportunities in the
field of conservation, but also for emphasising how culture and cultural heritage is playing a key role in a particularly sen-sitive political arena. The RIC working framework has been able to manage the implementation of the reconstruction process of the Serbian Orthodox religious sites in Kosovo for the last six years. However, the opportunity remains to extend the RIC framework to include the management and imple-mentation of all heritage in Kosovo, using the representation of key partners as the pivotal platform for promoting a coor-dinated and sustainable approach to heritage management.
01CHURCH OF THE HOLY VIRGIN LJEVIŠKA
11CHURCH OF ST ANDREW
21ST ELIAS CHAPEL
31CHURCH OF THE PRESENTATION OF THE VIRGIN
06CHURCH OF HOLY SAVIOUR
16CHURCH OF ST KYRIAKE
26CHURCH OF THE ASSUMPTION OF THE HOLY VIRGIN
02 HOLY ARCHANGELS MONASTERY
12 ORTHODOX SEMINARY OF STS CYRILLUS& METHODIUS
22CHURCH OF ST JOHNTHE BAPTIST
32CHURCH OFSTS FLORUS & LAURUS
07OLD CHURCH OF ST GEORGE (RUNOVIĆ’S CHURCH)
17CHURCH OF ST NICHOLAS
27CHAPEL OF ST LAZARUS
03 MONASTERY OF ST JOANIKIJE/DEVIĆ MONASTERY
13CHURCH OF THE BIRTH OF THE HOLY VIRGIN
23CHURCH OF THE PRESENTATION OF THE VIRGIN
33CHURCH OF ST MICHAEL
08CHURCH OF ST ELIAS
18CHURCH OF THE HOLY KING UROS
28ATELIER AND OPEN GALLERY OF AGIM CAVDARBASHA
04 EPISCOPAL CHURCH OF ST GEORGE
14EPISCOPAL RESIDENCE
24CATHEDRAL OF THE HOLY TRINITY
34CHURCH OF ST KYRIAKE
09CHURCH OF ST SAVA
19CHURCH OFSTS PETER & PAUL
29CHURCH OF ST PARASCEVE
05 CHURCH OF ST NICHOLAS (TUTIĆ’S CHURCH)
15CHURCH OF ST PARASCEVE
25CHURCH OF ST ELIAS
35CHURCH OF STS PETER & PAUL
10CHURCH OF ST NICHOLAS
20SERBIAN TOWN CEMETERY
30CHURCH OF THE BIRTH OF THE HOLY VIRGIN
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
The Reconstruction Implementation Commission (RIC) was set up in
Kosovo in 2004 as an implementation tool for the reconstruction of Serbian Orthodox Churches. The RIC has provided a unique platform for dialogue between Kosovo and Serbian stakeholders;
Go to list of projects : : Page 21
BËRNJAK BRNJACA
PRIZREN
SHIPASHNICAE ULËTDONJA
ŠIPAŠNICASHTIMEŠTIMLJE
VUSHTRRIVUČITRN
GJAKOVËĐAKOVICA
ISTOG ISTOK
LIPJANLIPLJAN
FERIZAJ UROŠEVAC
LLAUSHË LAUŠA
FUSHË KOSOVË KOSOVO POLJE
PRISHTINËPRIŠTINA
PODUJEVË PODUJEVO
MITROVICË MITROVICA
OBILIQOBILIĆ
PEJË PEĆ
VITIVITINA
VILLEN°
SITE SITE
BËRNJAK / BRNJACA 34 CHURCH OF ST KYRIAKE
FERIZAJ / UROŠEVAC
13 CHURCH OF THE BIRTH OF THE HOLY VIRGIN
18 CHURCH OF THE HOLY KING UROS
19 CHURCH OF STS PETER & PAUL
20 SERBIAN TOWN CEMETERY
21 ST ELIAS CHAPEL
FUSHË KOSOVË / KOSOVO POLJE 17 CHURCH OF ST NICHOLAS
GJAKOVË / ĐAKOVICA
24 CATHEDRAL OF THE HOLY TRINITY
25 CHURCH OF ST ELIAS
26 CHURCH OF THE ASSUMPTION OF THE HOLY VIRGIN
27 CHAPEL OF ST LAZARUS
ISTOG / ISTOK 35 CHURCH OF STS PETER & PAUL
LIPJAN / LIPLJAN31 CHURCH OF THE PRESENTATION OF THE VIRGIN
32 CHURCH OF STS FLORUS & LAURUS
LLAUSHË / LAUŠA 03 MONASTERY OF ST JOANIKIJE/DEVIĆ MONASTERY
MITROVICË / MITROVICA 09 CHURCH OF ST SAVA
OBILIQ / OBILIĆ 30 CHURCH OF THE BIRTH OF THE HOLY VIRGIN
PEJË / PEĆ22 CHURCH OF ST JOHN THE BAPTIST
23 CHURCH OF THE PRESENTATION OF THE VIRGIN
PODUJEVË / PODUJEVO 11 CHURCH OF ST ANDREW
PRISHTINË / PRIŠTINA10 CHURCH OF ST NICHOLAS
28 ATELIER AND OPEN GALLERY OF AGIM CAVDARBASHA
PRIZREN
01 CHURCH OF THE HOLY VIRGIN LJEVIŠKA
02 HOLY ARCHANGELS MONASTERY
04 EPISCOPAL CHURCH OF ST GEORGE
05 CHURCH OF ST NICHOLAS (TUTIĆ’S CHURCH)
06 CHURCH OF HOLY SAVIOUR
07 OLD CHURCH OF ST GEORGE (RUNOVIĆ’S CHURCH)
12 ORTHODOX SEMINARY OF STS CYRILLUS & METHODIUS
14 EPISCOPAL RESIDENCE
16 CHURCH OF ST KYRIAKE
SHIPASHNICA E ULËT / DONJA ŠIPAŠNICA 15 CHURCH OF ST PARASCEVE
SHTIME / ŠTIMLJE 33 CHURCH OF ST MICHAEL
VITI / VITINA 29 CHURCH OF ST PARASCEVE
VUSHTRRI / VUČITRN 08 CHURCH OF ST ELIAS
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
S ince its founding six years ago, the RIC has undertaken
rehabilitation and conservation works on 34 Serbian Orthodox sites.
BËRNJAK BRNJACA
PRIZREN
SHIPASHNICAE ULËTDONJA
ŠIPAŠNICASHTIMEŠTIMLJE
GJAKOVËĐAKOVICA
ISTOG ISTOK
LIPJANLIPLJAN
FERIZAJ UROŠEVAC
LLAUSHË LAUŠA
FUSHË KOSOVË KOSOVO POLJE
PRISHTINËPRIŠTINA
PODUJEVË PODUJEVO
OBILIQOBILIĆ
PEJË PEĆ
VITIVITINA
VUSHTRRIVUČITRN
MITROVICË MITROVICA
Go to thumbnails of the projects : : Page 23
Byzantine style, five domes, cross-in-square church. At-tached belfry over exonarthex. Rich decorative wall paintings. Built in the XIV century over the remains of a previous XI century Basilica. Cultural his-toric monument, protected by law. Recently included in the UNESCO world heritage list.
J
1 Church2 Parish house3 Auxilary building4 Guest house
1
2
4
3
PrizrenChurch of the Holy Virgin Ljeviška
2004
D A M A G E A S S E S S M E N T
The church was severely affected by fire in 2004. Damaged openings, belfry structure endangered due to the effects of fire, especially in the area of the biforium interior burnt and vandalised. Wall paintings covered in soot. Part of the fresco of the Virgin of Eleousa destroyed by hammering.Note: A large part of the lead roof cover was stolen in 2005.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 General clearance of the site. 3 New fence and gates. Replacement or repair of damaged doors, lintels, grills and windows. 3 Replacement of stone pillar and capital of the biforium. 3 New timber construction covered with lead to the first level of the belfry. 3 Replacement of burnt beams of the belfry. Stabilization of the bell. 3 Temporary plastic sheet roof covering installed to roof areas without lead cover.
2006
R E C O N S T R U C T I O N W O R K S
3 Replacement of the lead roof cover over the lateral aisles, the altar area and the belfry. 3 Stone and brick work consolidation. 3 Repairs to the exonarthex damaged surfaces. 3 Repair of the belfry’s iron railings and reconstruction of the platform. 3 Repair of the upper gallery, render and floors of the chapel. 3 Replacement of burnt joinery and lintels. 3 Reconstruction of the narthex timber gallery and staircase. 3 Glazing of windows.
2007
R E C O N S T R U C T I O N W O R K S
3 Full reconstruction of the auxiliary services building. 3 Third phase of lead roof replacement.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
R E C O N S T R U C T I O N W O R K S
3 Cleaning of the site. 3 Reconstruction of the parish house.
2010
R E C O N S T R U C T I O N W O R K S
FURTHER INTERVENTIONS NEEDED: 3 Reconstruction of the Guest House. 3 Reconstruction of the perimeter wall. 3 Landscaping. 3 Restoration of the wall paintings (UNESCO).
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 25
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren ChurCh of the holy Virgin ljeViškaJ
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
Archaeological site from the XIV century protected by law. Ruins of a main church, a parecclesion and a refec-tory. In the XV century, the site was abandoned and later used as a quarry to build Sinan Pasha mosque. New monas-tic building and workshop constructed during the 1990s.
PrizrenHoly Archangels Monastery
2004
D A M A G E A S S E S S M E N T
New monastery completely burnt down in March 2004: destroyed roofs and services, badly damaged walls, ceilings and floors. Workshop burnt down and totally destroyed.The rest of the archaeological site was undamaged.New guest house built by the Church over the foundation of the old workshop during 2004 – after the March riots.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 No interventions carried out. 3 No consensus reached.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Reconstruction of the guest house. 3 Reconstruction of the perimeter wall. 3 Landscaping.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 29
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren holy arChangels MonasteryJ
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Monastic complex with a Church dating from the XV century and three “konaks” and refectory. Frescoes from XV and XIX centuries. The mon-astery was renovated in the XIX century, destroyed in the second World War and rebuilt (1947-60). Listed monument.
J
1 Central konak2 Refectory3 Church4 Cemetery5 Old konak6 Outbuildings7 Boiler house8 Farm building
1
2
4
5
6
7
8
3
Llaushë/L aušaSkëndera j/Srb icaMonastery of St Joanikije/Dević Monastery
2004
D A M A G E A S S E S S M E N T
In March 2004, the whole complex was set on fire, the interiors gutted and the cemetery desecrated.The church was badly affected by fire, the roof, iconostasis and konaks destroyed and the wall paintings covered in soot and graffiti. Only the main walls were still standing. In 2004, after the riots, the church roof was repaired and the former refectory reconstructed and turned into the nuns’ living quarters.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Repair of perimeter walls. 3 Replacement or repair of damaged doors, windows, gutters and down pipes in the church.
3 Repair of the altar table and of the lead roof. 3 Demolition of unstable and unsafe partition wall in the old konak.
2006
RECONSTRUC TION WORKS
Reconstruction of the old guest house: 3 Reconstruction of partitions, plaster, floors and joinery, services. 3 New concrete slabs. 3 New roof construction and roof tiles. 3 Lead roof cover to the winter chapel.Reconstruction of a collapsed retaining wall.Internal repairs to the church:
3 Restoration of damaged plaster and floors. 3 Electrical installations.Protective works in the central konak:
3 New concrete slabs and walls consolidation.
200720082009
RECONSTRUC TION WORKS
Reconstruction of the central guest house: 3 New concrete floor slabs. 3 New roof construction and roof tiles. 3 Reconstruction of partitions, plaster, floors and joinery. Services installed. 3 Construction of a new boiler house and heating system. 3 Cemetery, graveyard and gravestones repairs. 3 Floor heating and new marble floor in the church.
2010
RECONSTRUC TION WORKS
3 Installation of the bells in the bell tower. 3 Cleaning of the well and construction of protective structure over the well.FURTHER INTERVENTIONS NEEDED:
3 Reconstruction of the Guest House, the Guest Reception building and the Farm building.
3 Reconstruction of the perimeter wall and landscaping. 3 Wall paintings restoration and new iconostasis.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 33
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
llaushë/lauša Monastery of st joanikije/DeVić Monastery
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
5
3
2
4
J
1 Church of Saint Nicholas (Tutic’s)2 Episcopal Church of St George3 Parish House4 Old church of St George (Runović’s church)5 Episcopal Residence building
Large scale three aisled Basilica with dome and belfry added later over the western sec-tion of the church”.Sheltered rich treas-ures. Built in the second half of XIX century. In-ventoried IPM Prizren.
PrizrenEpiscopal church of St George
2004
D A M A G E A S S E S S M E N T
Completely burned down, roof collapsed, interior gutted, only perimeter walls remained.Dome and bell-tower collapsed. Interior, iconostasis and decorations completely destroyed. Marble floor extensively damaged.Damaged and soiled stonework.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearance of the church and the site. 3 Mounting of a provisional scaffold and temporary protection over the top of the perimeter walls. 3 Demolition of the parish house due to it being an unstable structure. 3 Temporary hoardings.
2006
R E C O N S T R U C T I O N W O R K S
3 Clearance. Demolition of damaged elements. 3 Foundations for new pillars. 3 Steel pillars and roof structure. 3 Stone cleaning and repairs. 3 New stone vaults and dome. 3 Lead roof installed. 3 Joinery. 3 Electrical installation.
2007
R E C O N S T R U C T I O N W O R K S
3 Reconstruction of the dome and the belfry to the church. 3 Reconstruction of the parish house. 3 Internal plasterwork commenced. 3 Electrical installation. 3 Internal repairs.
2008
F U R T H E R I N T E R V E N T I O N S
3 Project works continued from 2007.
2009
R E C O N S T R U C T I O N W O R K S
3 Reconstruction of the interior and installation of the bells.
2010
R E C O N S T R U C T I O N W O R K S
3 Project works continued from 2009. 3 Landscaping project.FURTHER INTERVENTIONS NEEDED: 3 New iconostasis. 3 Furniture in the church.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 37
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren ePisCoPal ChurCh of st george
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Late Byzantine style. Small sized chapel, one aisle and dome. Remains of original wall paintings. Built and decorated in the XIV century. Last restored in the 1960s. Listed cul-tural historic monument.
J
CHURCH OF SAINT NICHOLAS (TUTIC'S)
PrizrenChurch of St Nicholas(Tutić’s church)
2004
D A M A G E A S S E S S M E N T
Lead roof removed, stone work partly damagedby hammering, perimeter fence partially lost.Windows destroyed.Interior badly damaged by fire and vandalised,marble pavement and wall paintings affected by fire.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearance of the yard. 3 Re-roofing with new lead. 3 Repair or substitution of damaged stones and bricks. 3 New door and windows with glazing. 3 Replacement of broken floor stone slabs. 3 New iron fence. 3 Temporary hoardings to the site.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
R E C O N S T R U C T I O N W O R K S
3 Internal repairs. 3 Electrical installation.
2008
R E C O N S T R U C T I O N W O R K S
3 Project works continued from 2007.
2009
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Wall paintings restoration. 3 Landscaping and drainage.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 41
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren ChurCh of st niCholas (tutić’s ChurCh)
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
Late Byzantine style. One-aisled domed church, cross vaulted pronaos. Walls from an unfinished newer church form the church yard. Remains of wall paintings. Built in the XIV century, the walls of the new-er church were added in the XIX century. Listed monument.
PrizrenChurch of the Holy Saviour
2004
D A M A G E A S S E S S M E N T
Older church: Interior damaged, internal surfaces, wall paintings, floor and wooden doors and windows affected by fire. Exterior in good condition.Newer church walls: soiled by smoke, unstable upper sections, doors and windows affected by fire, bell tower in an unstable condition.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Cleaning. 3 Repair of the wall tops to the newer church and cleaning of stonework. 3 Replacement of damaged timber doors and metallic windows. 3 Construction of a new fence and gates. 3 New roof construction and metallic covering to the belfry.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out. 3 UNESCO programme.
For further information, please contact : Siniša ŠešumUNESCO Venice Office – BRESCE, Marsala Tita 48, UN House, Sarajevo, BOSNIA AND HERZEGOVINATel:+387 33 222 796/Fax:+387 33 222 795/E-mail: s.sesum@unesco.org
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Repairing of the newer church walls and the bell tower. 3 Perimeter wall (fence). 3 New iconostasis. 3 Furniture in the church.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 45
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren ChurCh of the holy saViour
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Late Byzantine style. Small one aisled church with bar-rel vault. Rich wall paint-ings. In the complex of the Episcopal Church of St George (no. 04) Built in the XIV-XVI centuries. Protected monument.
J
1 Old church of St George (Runović’s church)
2 Episcopal church of St. George
3 Parish House
4 Episcopal Residence building
4
3
2
1
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 49
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
PrizrenOld church of St George(Runović’s church)
2004
D A M A G E A S S E S S M E N T
Interior damaged by explosion and fire, visible cracks, wall paintings largely affected, stone floors in bad condition, burnt doors and windows, desecrated tomb.External stonework affected by fire and smoke.The lead roof cover was stolen in 2005 and again in 2006.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clean-up operation with recovery of sensitive material. 3 Re-roofing with lead. 3 Cleaning of stonework. 3 Temporary soft wood doors and windows. 3 Protective covering of the floor and tombstone inside the church.
2006
R E C O N S T R U C T I O N W O R K S
3 Clearance and dismantling of damaged elements. 3 Repair of internal render. 3 Stonework repairs and cleaning. 3 Electrical installation. 3 Lead roof installed. 3 New joinery.
2007
R E C O N S T R U C T I O N W O R K S
3 Archaeological strategy prepared.
2008
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2010
R E C O N S T R U C T I O N W O R K S
3 Drainage system around the church. 3 Laying of floor stone slabs at the church interior. 3 Landscaping. 3 Wall paintings restoration founded by the Greek Government.FURTHER INTERVENTIONS NEEDED: 3 New iconostasis.
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren olD ChurCh of st george (runoVić’s ChurCh)
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
Single aisled vaulted church with pronaos. An exonarthex was later added enclosing the church. The church was erected in 1834 over the remains of an older church (XVI-XVII centuries). Rich wall paintings. Par-ish house and graveyard.
1 Baptistery
2 Perimeter wall
3 Bell tower
4 Church
5 Parish house
1
5
2
2
3
4
Vushtrri/VučitrnChurch of St Elias
2004
D A M A G E A S S E S S M E N T
Roof destroyed by fire, windows removed. A few structural cracks.Interior looted, vandalised and burnt down, burnt emporia floor and beams, unstable columns. Wall paintings affected by fire.Parish and guest houses burnt down, cemetery desecrated.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Cleaning of the site and the church. 3 Protective hoardings around the site. 3 Building of a protective temporary roof. 3 Protection of doors and windows.
2006
R E C O N S T R U C T I O N W O R K S
3 Dismantling of the provisional protective roof. 3 Excavation around the church. 3 Repair or substitution of plasters. 3 New exonarthex roof structure and tiles. 3 Drainage system. 3 Stone roof covering to the church. 3 New joinery. 3 New floor. 3 Electrical installation. 3 Repairs to the roof.
2007
R E C O N S T R U C T I O N W O R K S
Reconstruction of the parish house: 3 New roof structure and tiles. 3 New floor slabs. 3 New floors. 3 Plastering of façade and interior wall surfaces. 3 New electrical, water and sewage installations. 3 New joinery. 3 Sidewalk around the building.
2008
R E C O N S T R U C T I O N W O R K S
3 Project works continued from 2007.
2009
R E C O N S T R U C T I O N W O R K S
3 Full reconstruction of the baptistery building. 3 Repairing of the church’s roof and interior. 3 Repairing of the bell tower and installation of the bells. 3 Repairing of the church’s drainage system. 3 Reconstruction of the perimeter wall.
2010
R E C O N S T R U C T I O N W O R K S
3 Reconstruction works continued from 2009.FURTHER INTERVENTIONS NEEDED: 3 Landscaping. 3 Repairing of the cemetery. 3 Wall paintings restoration. 3 New iconostasis.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 53
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Vushtrri/Vučitrn ChurCh of st elias
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
M itrovicë/M itrovic aChurch of St Sava
The site was handed over to UNESCO. The conservation and restoration works were carried out by UNESCO thanks to the generous contribution of the United States of America within the UNESCO programme “Safeguard the Cultural Heritage in Kosovo”.
FOR FURTHER INFORMATION, PLEASE CLICK HERE
SEE APPENDIXON PAGE 163
„„
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 57
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
65
1 Cemetery
2 Bell tower
3 Baptistery
4 Church
5 Parish House
1
2
3
4
5
Basilica type church from the early XIX century. Ex-onarthex and dome added in the XX century. Rich wall paintings and iconostasis. External baptistery, parish house and bell tower. Grave-yard. Listed monument.
Prishtinë/Prišt inaChurch of St Nicholas
2004
D A M A G E A S S E S S M E N T
Completely burnt down, interior gutted, roof collapsed, only perimeter walls and dome standing but affected by fire. Narthex in unstable condition.Wall paintings in very bad condition. Baptistery and parish house entirely burnt. Upper part of the bell tower and interior staircase collapsed.Cemetery desecrated.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearance of the site and the church. 3 New entrance doors and windows to the church, baptistery and parish house. 3 Installation of temporary metallic roof construction over a scaffold.
2006
R E C O N S T R U C T I O N W O R K S
3 Cleaning of stonework. 3 New pillars and roof slab. 3 Timber roof construction and roof tiles. 3 Lead roof to the exonarthex. 3 New timber gallery, ceiling and joinery. 3 Replacement of plasters and floors. 3 Services. 3 Parish house and baptistery reconstruction. 3 Bell tower reconstruction, new roof and staircase.
2007
R E C O N S T R U C T I O N W O R K S
3 Completion of the parish house and baptistery. 3 Staircase to the belfry. 3 Conservation of the perimeter wall. 3 Landscaping works. 3 Repairs to the cemetery. 3 Repairs to the toilets
2008
R E C O N S T R U C T I O N W O R K S
3 Project works continued from 2007.
2009
R E C O N S T R U C T I O N W O R K S
3 Final repair works in the interior of the church, parish house, baptistery and bell tower.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 New iconostasis.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 59
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prishtinë/Priština ChurCh of st niCholas
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Single aisled church with
central dome. Initially built in 1930. The last reconstruction
was in 1971.
J
1 Church
2 Bell tower
1
2
Po dujevë/Po dujevoChurch of St Andrew
2004
D A M A G E A S S E S S M E N T
Looted and burnt down. Apse blown up with explosives. Floors, internal surfaces and joinery damaged. Roof cover partially removed.Boundary wall demolished.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearing of the church interior. 3 Reconstruction of the blown-up apse. 3 Repair of the roof. 3 Replacement of gate, doors and windows. 3 Reconstruction of perimeter walls.
2006
R E C O N S T R U C T I O N W O R K S
3 No interventions carried out.
2007
R E C O N S T R U C T I O N W O R K S
3 Roof repairs. 3 Façade repairs. 3 Internal plasterwork completed. 3 Marble floor laid. 3 Electrical installation. 3 Bell tower reconstruction.
2008
R E C O N S T R U C T I O N W O R K S
3 Project works continued from 2007.
2009
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 New iconostasis.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 63
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
PoDujeVë/PoDujeVo ChurCh of st anDrew
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
1 Uncle Sima’s building
2 Dormitory building
3 Dean’s building
Four main buildings. The oldest building, Uncle Sima’s, was built in the XIX cen-tury. The rest are later additions built mainly in the 1990s.
1
2
3
PrizrenOrthodox seminaryof Sts Cyrillusand Methodius
2004
D A M A G E A S S E S S M E N T
Older building burnt and collapsed. Only the perimeter walls remain, badly damaged by fire. The remaining three buildings equally damaged and burnt down.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Reconstruction funded and managed by the European Agency for Reconstruction (EAR).
2006
R E C O N S T R U C T I O N W O R K S
3 Project preparation and tender process by the European Agency for Reconstruction (EAR).
2007
R E C O N S T R U C T I O N W O R K S
3 Reconstruction of the roof at the Dean’s and the Dormitory buildings. 3 Reconstruction of Uncle Sima’s building implemented by the European Agency for Reconstruction (EAR).
2008
R E C O N S T R U C T I O N W O R K S
3 Project continued from 2007.
2009
R E C O N S T R U C T I O N W O R K S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Reconstruction of the Dean’s and the Dormitory buildings. 3 Apartments for professors. 3 Reconstruction of the old house – guest reception building. 3 Reconstruction of the old dormitory building. 3 Reconstruction of the auxiliary buildings. 3 Repairing of students’ garden. 3 Landscaping.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 67
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren orthoDox seMinary of sts Cyrillus anD MethoDius
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Small-sized village church. One aisle and belfr y over the entrance of the main façade. XX century, 1930.
J
S of te/S of tović Fer iza j /UroševacChurch of the Birthof the Holy Virgin
2004
D A M A G E A S S E S S M E N T
3 Completely damaged, roof collapsed, structural cracks, damaged joinery. 3 Internal walls and floors affected by fire. 3 Cemetery desecrated and damaged.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Reconstruction of the semi-circular vault. 3 Roof structure and roof tiles. 3 Belfry’s cupola and apse covered with zinc. 3 Plastering and painting of walls and vaults. 3 Timber windows, doors and upper gallery. 3 Marble pavement. 3 Electrical installation. 3 New perimeter fence and a gate.
2006
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 New iconostasis. 3 Landscaping.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 71
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
softe/softoVić ChurCh of the Birth of the holy Virgin
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Two storey building with basement on the site of the Church of St George (no. 04) Initially built in the XIX century as the Russian consulate, the current building is a recent reconstruction.
J
1 Church of St Nicholas (Tutic’s)2 Episcopal Church of St George3 Parish House4 Old church of St George (Runović’s church)5 Episcopal Residence building
1
5
3
2
4
PrizrenEpiscopal residence
2004
D A M A G E A S S E S S M E N T
Completely burnt down, roof collapsed, interior gutted, floors in unstable condition, joinery burnt down, walls and floors affected by fire.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearance of the building. 3 Temporary closing of the openings with plywood. 3 Temporary covering of the roof with thick plastic sheet. 3 Reconstruction funded and managed by the European Agency for Reconstruction (EAR).
2006
R E C O N S T R U C T I O N W O R K S
3 Project preparation and tender process by the European Agency for Reconstruction (EAR).
2007
R E C O N S T R U C T I O N W O R K S
3 Reconstruction implemented by the European Agency for Reconstruction (EAR).
2008
R E C O N S T R U C T I O N W O R K S
3 The project continued from 2007.
2009
F U R T H E R I N T E R V E N T I O N S
3 No works carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Project completed.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 75
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren ePisCoPal resiDenCe
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
Single aisled XX century church with concrete
belfry.Poor quality.
Shipashnic a E Ulët/Donja Šipašnic a Kamenicë/KamenicaChurch of St Parasceve
2004
D A M A G E A S S E S S M E N T
3 Minor damage. Attacked by Molotov cocktail. 3 The church is mainly affected by subsidence. Structural cracks have appeared throughout the building. Water penetration.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Construction of new perimeter fence and gate.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Reconstruction of the Church. 3 Reconstruction of the bell tower. 3 Landscaping. 3 Repairing of the cemetery.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 79
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
shiPashniCa e ulët/Donja šiPašniCa ChurCh of st ParasCeVe
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Inscribed cross in square building with a cen-tral dome. Remains of wall paintings. Re-built during the 1960s over the remains of XIV century church.
J
PrizrenChurch of St Kyriake
2004
D A M A G E A S S E S S M E N T
Interior of the church burnt. Wall paintings damaged by fire and soot. Exterior in good condition.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Repair of the lead roof. 3 New oak timber doors and repair of metallic windows. 3 Repair and re-fixing of the altar pillar. 3 Repair of the perimeter walls and addition of a metallic fence.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
R E C O N S T R U C T I O N W O R K S
3 New lead roof cover. 3 Internal repairs. 3 Electrical installation.
2008
R E C O N S T R U C T I O N W O R K S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Wall paintings restoration. 3 Perimeter wall. 3 Landscaping.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 83
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Prizren ChurCh of st kyriake
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Free cross type domed church with pronaos
and belfry. Priest house. Built around
1929.
J
Fushë Kosovë/Kosovo PoljeChurch of St Nicholas
2004
D A M A G E A S S E S S M E N T
Exterior in good condition. Interior looted, few windows broken. Lobby area affected by fire: doors burnt down, floor destroyed, wall paintings soiled. Staircase and bell mechanism destroyed.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Replacement of damaged doors. 3 Repair of damaged windows. 3 Repair of the damaged marble floor. 3 Replacement of the burnt staircase to the belfry. 3 Construction of a new fence and gate.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Repairing of the church. 3 Landscaping. 3 Wall paintings restoration.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 87
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
fushë kosoVë/kosoVo Polje ChurCh of st niCholas
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Cross in square church with five domes.
Rich decoration. Bell tower
built in 1933.Listed monument.
J
Ferizaj/UroševacChurch of the Holy King Uros
2004
D A M A G E A S S E S S M E N T
Minor damage in the church. Entrance stairs in bad condition.Main doors and wooden staircase handrail and balustrade affected by fire.Priest’s house destroyed.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearance. 3 Replacement of carved entrance doors. 3 Repair of main entrance stairs. 3 Repair of timber staircase railings. 3 New metallic entrance gate.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Repairing of the Church. 3 Reconstruction of the Parish House. 3 Repairing of the bell tower. 3 Reconstruction of the perimeter wall (fence). 3 Landscaping. 3 Wall paintings restoration.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 91
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
ferizaj/urošeVaC ChurCh of the holy king uros
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Modern single-aisled church.
Attached belfry. Guest house
and graveyard.XX century.
J
Talinovc/M -TalinovacFer iza j /UroševacChurch of Sts Peter and Paul
2004
D A M A G E A S S E S S M E N T
Damaged roof cover, brickwork and windows.Interior burnt, floors broken, wall paintings damaged.Guest house: roof destroyed, damaged joinery, interior burnt down. Cemetery largely damaged.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Brickwork repairs. 3 Repair of the aluminum roof to the church. 3 New roof to the guest house. 3 Glazing of the windows, new metallic entrance doors and gate. 3 Repair of headstones.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Repairing of the church. 3 Repairing of the auxiliary building. 3 Repairing of the fence. 3 Repairing of the cemetery. 3 Landscaping. 3 New iconostasis.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 95
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
talinoVC/M-talinoVaC ChurCh of sts Peter anD Paul
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Town cemeterycontaining gravesof different ages.
The chapel is a recently built
modern building .
J
Ferizaj/UroševacSerbian town cemetery
2004
D A M A G E A S S E S S M E N T
Chapel: roof partly destroyed, interior damaged by fire, windows and door broken, floors partly affected.Site: guest house destroyed, large number of headstones damaged.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Repair of the roof. 3 Metal door. Glazing of windows. 3 Floor repairs. 3 Repair of headstones. 3 Completion of the perimeter fence.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Internal repairs to the chapel. 3 Reconstruction of the auxiliary building. 3 Repairs to the cemetery. 3 Landscaping.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 99
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
ferizaj/urošeVaC serBian town CeMetery
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Single-aisled modern chapel.
Graveyard. Recently built.
J
Varoshë/Varoš S eloFer iza j /UroševacSt Elias chapel
2004
D A M A G E A S S E S S M E N T
Church affected by fire, doors and windows damaged, interior smoked, altar screen burnt.Cemetery desecrated and damaged.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 New metallic door and gate, replacement of broken glass to the windows. 3 Floor repairs. 3 Repair of headstones.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Internal repairs to the chapel. 3 Repairs to the cemetery.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 103
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Varoshë/Varoš selo st elias ChaPel
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Free cross type with pronaos,
belfry over the pronaos.
Completed in 1982.
J
1 Parish House
2 Church
3 Guest reception building
4 Perimeter wall
1
4
23
Pejë/PećChurch ofSt John the Baptist
2004
D A M A G E A S S E S S M E N T
Church looted and affected by fire and soot, doors and windows destroyed, marble pavement affected by explosion.Parish house burnt down.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Repair of the roof and new covering with aluminum sheet. 3 New metallic entrance gates, timber doors, glazing of the windows. 3 Repairs to damaged marble floor.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
R E C O N S T R U C T I O N W O R K S
Reconstruction of the parish house: 3 New roof timber structure and roof cover 3 Plastering of the interior and exterior walls 3 New joinery 3 New parquet floors 3 New electrical, sewage and water installations
2008
R E C O N S T R U C T I O N W O R K S
3 Project works continued from 2007.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
R E C O N S T R U C T I O N W O R K S
3 Repairing of the church. 3 Reconstruction of the guest reception building. 3 Reconstruction of the perimeter wall. 3 Landscaping. 3 Project works continued in 2011.FURTHER INTERVENTIONS NEEDED: 3 New iconostasis.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 107
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Pejë/Peć ChurCh of st john the BaPtist
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Three aisled basilica, barrel vault, decora-tive wall paintings. Guest house and graveyard. Originally built in the XVI cen-tury. Later restoration from1868. Protected.
J
B ellop olë/B elo PoljePejë/PećChurch of the Presentationof the Virgin
2004
D A M A G E A S S E S S M E N T
Roof in very bad condition, doors and windows damaged, interior vandalised and affected by fire, iconostasis burnt down, wall paintings covered with soot, stone pavement, partially destroyed.Site: surrounded by a low wall, cemetery vandalised.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Full re-roofing: consolidation of the vault, new timber roof structure covered with ceramic roof tiles. 3 Replacement of damaged stone slate floor. 3 Reconstruction of three gravestones in the graveyard. 3 New fence and gates to the site.
2006
R E C O N S T R U C T I O N W O R K S
3 Clearance and removal of damaged elements. 3 Perimeter drainage around the church. 3 Repair or substitution of external and internal plasters. 3 Perimeter pathway. 3 New joinery. 3 Floor repairs. 3 Electrical installation.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Repairs to the cemetery. 3 Landscaping. 3 New iconostasis. 3 Restoration of the wall paintings.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 111
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
BelloPolë/Belo Polje ChurCh of the Presentation of the Virgin
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Concrete construction. Late 1990s.
Mausoleum builtand destroyed
in the early XX century.
J
Before destruction
Gjakovë/Đakovic aCathedralof the Holy Trinity
2004
D A M A G E A S S E S S M E N T
Destroyed in summer 1999.In March 2004 the ruins were removed from the site.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 No interventions carried out.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Reconstruction of the church. 3 Reconstruction of the perimeter fence. 3 Landscaping.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 115
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
gjakoVë/ĐakoViCa CatheDral of the holy trinity
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Small chapel, sin-gle aisle and belfry. Built in 1991 on the site of a destroyed church from the early XX century.
J
Before destruction
Bishtrazhin/BištražinGjakovë/ĐakovicaChurch of St Elias
2004
D A M A G E A S S E S S M E N T
Blown up with explosives. Completely destroyed.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Selective removal of debris under the supervision of an archaeologist. Storage of reusable materials within the site. 3 Consolidation of the foundation remains. 3 Reinforcement of the existing fence, new iron entrance gate.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Reconstruction of the Church. 3 Repairing of the perimeter fence. 3 Landscaping.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 119
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Bishtrazhin/Bištražin ChurCh of st elias
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
1 Parish House
2 Church
3 Guest House
4 Outbuilding
12
3
4
Single-aisled church with bel-fry over the entrance. Built in the XIX century on the site of an older XVI century foun-dation. Listed monument.
Gjakovë/Đakovic aChurchof the Assumptionof the Holy Virgin
2004
D A M A G E A S S E S S M E N T
Burned and demolished. Completely destroyed.Parish house completely destroyed. Cemetery desecrated.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearing of the site, demolition of the unstable remains of the north eastern building. 3 Construction of a fence around the complex.
2006
R E C O N S T R U C T I O N W O R K S
Reconstruction of the perimeter wall: 3 Concrete wall foundations. 3 Stone wall. 3 Timber gates.
2007
R E C O N S T R U C T I O N W O R K S
Reconstruction of the parish house: 3 Completely new, one storey building, constructed from foundations.Reconstruction of the guest house: 3 New building constructed on the existing foundations and basement concrete slab.
2008
R E C O N S T R U C T I O N W O R K S
3 Project works continued from 2007.
2009
R E C O N S T R U C T I O N W O R K S
3 Reconstruction of the church: 3 Completely new church building reconstructed from foundations.
2010
R E C O N S T R U C T I O N W O R K S
3 Reconstruction of the church-works continued from 2009.FURTHER INTERVENTIONS NEEDED: 3 Reconstruction of the auxiliary building. 3 Landscaping. 3 New iconostasis.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 123
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
gjakoVë/ĐakoViCa ChurCh of the assuMPtion of the holy Virgin
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
JSmall modern
cemetery chapel.Guest house and graveyard. Built between 1991-
1994
Before destruction
PiskoteGjakovë/ĐakovicaChapel of St Lazarus
2004
D A M A G E A S S E S S M E N T
Chapel demolished and rubble removed.Guest house vandalised, cemetery desecrated, gravestones damaged, trees cut down.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearance of the chapel and guest house. 3 Cleaning of the cemetery from vegetation and debris. 3 Repairing of tombstones.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Reconstruction of the Chapel. 3 Reconstruction of the auxiliary building. 3 Repairing of the cemetery. 3 Landscaping.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 127
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Piskote ChaPel of st lazarus
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
House, atelier and open
galleryof an Albanian
sculptor.
J
Çaglavicë/Čaglavic a Pr isht inë/Pr i š t inaAtelier and Galleryof Agim Cavdarbasha
2004
D A M A G E A S S E S S M E N T
The house was completely damaged by fire (approx 100 m2).About 80-100 artifact sculptures (wooden, clay, stock, metallic) destroyed.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Handed over to the Ministry of Culture, Youth and Sports.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 131
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
ÇaglaViCë/čaglaViCa atelier anD gallery of agiM CaVDarBasha
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
JSingle aisle
church. Attached belfry over
the entrance. Guest house
and parish house.
Viti/Vit inaChurch of St Parasceve
2004
D A M A G E A S S E S S M E N T
Minor damages, cracks and some missing roof tiles.Priest house stoned. Windows repaired and perimeter wall built after the riots.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Roof repair, repair of the joints between the church and the belfry and refilling of cracks. 3 Repair of damaged plaster in the guest house.
2006
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Project is completed.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 135
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Viti/Vitina ChurCh of st ParasCeVe
J
J Presentation of this projectReturn to thumbnails : : Return to listJ Presentation of this project
Return to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Cross layout, five domed unfinished
building. 1990s.
J
O bil iq/O bil ićChurch of the Birthof the Holy Virgin
2004
D A M A G E A S S E S S M E N T
Partially damaged.Window panes and doors broken.Rainwater damage.Interior partially affected by fire.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Repair of damaged gutters and down pipes. Clearance of the site. 3 Production and installation of new timber doors, glazing of all windows.
2006
R E C O N S T R U C T I O N W O R K S
3 No interventions carried out.
2007
R E C O N S T R U C T I O N W O R K S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Repairs to the church. 3 Landscaping. 3 Perimeter fence.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 139
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
oBiliq/oBilić ChurCh of the Birth of the holy Virgin
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
Byzantine style. One aisle, barrel vaulted. Stone iconostasis inte-gral with the structure, wall paintings. Built in the XIV century. Archaeo-logical remains from IV-VI centuries. Protected.
Lipjan/LipljanChurch of the Presentationof the Virgin
2004
D A M A G E A S S E S S M E N T
Hand grenades thrown nearby, slight damage to stonework.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 New iron perimeter fence and gates.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 UNESCO programme for wall paintings restoration. For further information, please contact : Siniša Šešum
UNESCO Venice Office – BRESCE, Marsala Tita 48, UN House, Sarajevo, BOSNIA AND HERZEGOVINATel:+387 33 222 796/Fax:+387 33 222 795/E-mail: s.sesum@unesco.org
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 143
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
liPjan/liPljan ChurCh of the Presentation of the Virgin
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
Free cross type, with a big dome.
Built in the XX century nextto the church
of the Presentation(no. 31)
Lipjan/LipljanChurch of Sts Florus and Laurus
2004
D A M A G E A S S E S S M E N T
Exterior damage almost invisible.External door of the church was damaged during riots in 2004.It was repaired immediately after riots.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Fencing the site together with the Church of the Presentation of the Virgin (no. 31).
2006
F U R T H E R I N T E R V E N T I O N S
3 Project completed.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 147
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
liPjan/liPljan ChurCh of sts florus anD laurus
J
J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
Shtime/ŠtimljeChurch of St Michael
The site was handed over to UNESCO. The conservation and restoration works were carried out by UNESCO thanks to the generous contribution of the United States of America within the UNESCO programme “Safeguard the Cultural Heritage in Kosovo”.
FOR FURTHER INFORMATION, PLEASE CLICK HERE
SEE APPENDIXON PAGE 167
„„
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 151
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
JD Library of this project
Return to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Small domed church and
guest house. Rebuiltin 1975.
J
B ërnjak/Brnjac a Rahovec/OrahovacChurch of St Kyriake
2004
D A M A G E A S S E S S M E N T
Church undamaged. Guest House burnt down: roof affected by fire, windows and doors damaged, interior affected by fire.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Roof construction and cover repairs. 3 Reconstruction of damaged render. 3 New doors and windows. Gate repair. 3 Repair of pavements. 3 Replacement of electrical installation.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Repairing of the church. 3 Repairing of the guest house. 3 Landscaping. 3 Perimeter fence.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 153
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Bërnjak/BrnjaCa ChurCh of st kyriake
J J Presentation of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Free cross type domed church with pronaos and belfry.
Parish house and a few graves. The church was
built in 1929.
J
1 Church
2 Parish House
1
2
Isto g/IstokChurch of Sts Peter and Paul
2004
D A M A G E A S S E S S M E N T
Major damage around southern window.Door and windows destroyed. Interior affected by fire, iconostasis burnt, altar destroyed, stone pavement partially destroyed.Parish house completely burnt down.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Reconstruction of damaged stonework and external render. 3 Repair of internal plasters and cracks. 3 New doors, windows and grills. 3 Replacement of electrical installation. 3 Re-fixing of marble altar table.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
R E C O N S T R U C T I O N W O R K S
3 Roof repairs to the church. Reconstruction of the parish house:
3 New timber roof structure and roof cover. 3 New joinery. 3 Plastering of the interior and exterior walls. 3 New electrical, sewage and water installations. 3 New parquet and ceramic tile floors. 3 Archaeological assessment.
2008
R E C O N S T R U C T I O N W O R K S
3 Project works continued from 2007.
2009
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2010
F U R T H E R I N T E R V E N T I O N S
N E E D E D
3 Landscaping. 3 Perimeter wall (fence). 3 New iconostasis.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 157
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
J
D Library of this projectReturn to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
istog/istok ChurCh of sts Peter anD Paul
JJ Presentation of this project
Return to thumbnails : : Return to list
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Page 160
Council of Europe representative and Chairperson
Hakan Shearer Demir
Serbian Orthodox Church (SOC) representative
Father Sava, the Prior of Dečani Monastery
Ministry of Culture, Youth and Sports (MCYS) representative
Vjollca Aliu Director of Cultural Heritage Department
Institute for the Protection of Cultural Monuments (IPM) of Serbia representative
Vera Pavlović-LončarskiDirector of the Institute for the Protection of Cultural Monuments
Institute for the Protection of Monuments (IPM) of Kosovo representative
Burbuqe Bakija-DevaHead of the Cultural Heritage Division in the MCYS
Council of Europe
Robert PalmerDirector of Democratic Governance, Culture and Diversity
Heritage, Technical Assistance and Joint Actions with the EU Division (Strasbourg)
Gianluca Silvestrini Head of DivisionMarc Hory Project Coordinator
Adeline Marty Administrative Assistant
Secretariat Office in KosovoTim Cartwright Head of OfficeVisar Berisha Driver
International Expert Board Demetrios Athanasoulis ArchaeologistMichael Eatherley Structural EngineerPedro Ponce de León ArchitectChiara Compostella Wall paintings Restorer
RIC Technical Unit
Julija Trichkovska Expert in cultural heritage
Goran Zdravković Technical Advisor, Civil Engineer
Shkendije Kazagiqi Technical Advisor, Architect
UNMIKMikhail Krasnoshchekov
UNMIK representative, Political Affairs Officer
Ministry of Culture, Youth and Sports (MCYS)Tomorr Buza RIC Focal Point Sebahate Boshnjaku Procurement Officer Florije Gashi Finance OfficerZarka Morina Finance AssistantArsim Thaçi Budget OfficerGenc Tarakaj DriverGenc Boshnjaku Driver
Projects designsInstitutes for the Protection of Cultural Monuments in Serbia co-ordinated by Leposavić office
RIC Site Supervisors
Zoran Garić Architect IPM Leposavić
Jovica Lukić Architect IPM Leposavić
IPM Kosovo ConsultantsLindita Cervadiku Architect IPM PrishtinaArsim Mulhaxha Architect IPM Pejё/PećValbona Saliuka Architect IPM PrishtinaJusuf Xhibo Architect IPM Prizren
Faton Pruthi Architect IPM Gjakovё/Ðakovica
Archaeologists
Milot Berisha Archaeological Institute
Svetlana Hadžić IPM LeposavićKemajl Luci Museum of KosovoLuan Koçabashliu IPM Prizren
European Commission Liaison Office in Pristina
Carole Poullaouec Team Leader of Social Development Team
Edis Agani Task manager
The Reconstruction Implementation Commission
EXPERTS AND STAFF INVOLVED IN THE RIC PROJECT
Tenderslist
CLICK ON THE LANGUAGE
OF YOUR CHOICETO DOWNLOAD
THE PDF FILE
ActivityreportCLICK ON
THE LANGUAGEOF YOUR CHOICE
TO DOWNLOADTHE PDF FILE R
ESTO
RED
SI
TES
FUR
TH
ERIN
FOR
MA
TIO
NH
OW
TH
E RI
C W
ORK
SIN
TRO
DU
CTI
ON
FOR
EWO
RD
SA
PP
END
ICES
Page 161
The Reconstruction Implementation Commission
DOWNLOAD FILES
2005English / Albanian / Serbian
2006English / Albanian / Serbian
2007English / Albanian / Serbian
2009English / Albanian / Serbian
2005English / Albanian / Serbian
2006English / Albanian / Serbian
2007English / Albanian / Serbian
2008/2009English / Albanian / Serbian
2009/2010English / Albanian / Serbian
D Return to tender process
D Return to partners
J
Cross inscribed church with dome. Parish house and external belfr y. Built between 1896 and 1912. The church project was designed by the ar-chitect Andra Stevanovic.
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 163
D Library of this projectReturn to thumbnails : : Return to list
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
M itrovicë/M itrovic aChurch of St Sava
2004
DAMAGE ASSESSMENT
The church belfry was hardly damaged in March 2004. The church complex buildings were damaged. The interior, the altar and iconostasis (created by Dimitrie Andonov-Papradiski) were completely destroyed. Windows were broken. The floor into the church, the wooden gallery and the marble cover of the walls were burnt. Roof dilapidated. Damaged joinery. Interiors smoked and fire affected. Emporia destroyed. Joinery and internal staircase of the bell tower destroyed. Parish house burnt down.
2005
PROTECTIVE INTERVENTIONS
3 Replacement of the northwestern area of the roof and repairs to the remainder. 3 Complete replacement of glazing. 3 New oak entrance doors. 3 Cleaning of stonework. 3 Re-fixing of emporia detached beam.
20 - 2006 07
FURTHER INTERVENTIONS
3 No interventions carried out.
2008
FURTHER INTERVENTIONS
The site is handed over to UNESCO
2009
RECONSTRUCTION WORKS
Implemented by UNESCO thanks to the generous contribution of the United States of America within the UNESCO programme “Safeguard the Cultural Heritage in Kosovo”Works on the church: 3 New wooden roof structure – complete surface 3 New lead cover of the roof – complete surface 3 New horizontal and vertical gutters 3 Complete restoration of the upper part of the façade, new plastering and façade works
3 Restoration of the main façades, cleaning of the stone structures, re-pointing the joints 3 Reparation and glazing of windows 3 New electrical installation – cables 3 Removal of damaged plaster of the interior and plastering of surface 3 Painting of the interior of the church including all required preparatory works 3 New electrical cables for the bell tower 3 Cleaning of the exterior
2010
FURTHER INTERVENTIONS
NEEDED
Church building: 3 Construction of inner gallery, including construction of accompanying staircases 3 Floor structure repaired with stone slabs 3 Wall paintings – frescos 3 Construction of the new iconostasis 3 Inner lighting system – spot lights 3 Exterior lighting system 3 Floor heating 3 Arrangement of the complete church plot, landscaping
Other buildings: 3 Reconstruction of the Parish House. 3 Reconstruction of the Old Parish House. 3 Repairing of the bell tower. 3 Reconstruction of the perimeter wall.
J
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
RETURN ON THE GENERAL PRESENTATION OF THE PROJECT„
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 165
J
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
MitroViCë/MitroViCa ChurCh of st saVa
J Presentation of this projectReturn to thumbnails : : Return to list
Free cross type and dome. Bell tower aside.Built during the period 1920-1922. The project for the church was de-signed by the archi-tect Jelisaveta Nacic.
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 167
D Library of this projectReturn to thumbnails : : Return to list
RETURN ON THE GENERAL PRESENTATION OF THE PROJECT„
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
Shtime/ŠtimljeChurch of St Michael
2004
D A M A G E A S S E S S M E N T
Exterior in good condition, doors and windows partly damaged.Interior and wall paintings vandalised, altar destroyed. Belfry upper part destroyed by fire.
2005
P R O T E C T I V E I N T E R V E N T I O N S
3 Clearing of the church, site and belfry. 3 New oak door, replacement of a metallic window, glazing of all windows with plexiglass. 3 New perimeter fence and gate.
2006
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2007
F U R T H E R I N T E R V E N T I O N S
3 No interventions carried out.
2008
F U R T H E R I N T E R V E N T I O N S
The site is handed over to UNESCO
2009
2010
R E C O N S T R U C T I O N W O R K S
Implemented by UNESCO thanks to the generous contribution of the United States of America within the UNESCO programme “Safeguard the Cultural Heritage in Kosovo”. 3 New wooden roof structure – complete surface 3 New lead cover of the roof – complete surface 3 New horizontal and vertical gutters 3 Restoration of the façade 3 Reparation and glazing of windows 3 New electrical installation – cables 3 Removal of damaged plaster of the interior and plastering of surface 3 Painting of the interior of the church including all required preparatory works
FURTHER INTERVENTIONS NEEDED:Church building: 3 Floor structure repaired with stone slabs 3 Wall paintings – frescos 3 Construction of the new iconostasis 3 Inner lighting system – spot lights 3 Exterior lighting system 3 Arrangement of the complete church plot, including required landscaping works
Other buildings: 3 Reconstruction of the bell tower.
J
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
J
RES
TOR
ED
SITE
SFU
RT
HER
INFO
RM
AT
ION
HO
W
THE
RIC
WO
RKS
INTR
OD
UC
TIO
NFO
REW
OR
DS
AP
PEN
DIC
ES
Page 169
shtiMe/štiMlje ChurCh of st MiChael
J Presentation of this projectReturn to thumbnails : : Return to list
J
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
RECONSTRUCTIONIMPLEMENTATION COMMISSION
FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
Co
nce
pti
on
& r
éalis
atio
n >
Les
Exp
lora
teu
rs, S
tras
bo
urg
, Fra
nce