RealWorldImplicationsofCalifornia’sNSF/ANSI61Certified

ConcreteRequirements

SteveCaswell,P.E.,Carollo EngineersKevinPeacock,DNTanks

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

2

RevisedWaterworksStandards• CCRTitle22

• UpdatedandrevisedrequirementsforWaterworksprojects

• Specificrequirementsfornewwells,storagetanks,reservoirs,sourcecapacity,permitting,watermainsandadditives

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

3

RevisedWaterworksStandards

• Section64591‐ indirectadditives‐chemicalsleachingfrommaterialsincontactwithdrinkingwateri.e.pipes,storagetanks,coatingsandanymaterialsincontact.

CCRTitle22

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

4

Section64591‐ IndirectAdditives

..watersystemshallnotuseanychemical,material,lubricant,orproductintheproduction,treatmentordistributionofdrinkingwaterthatwillresultinitscontactwiththedrinkingwaterincluding

– processmedia(carbon,sand)– protectivematerials(coatings,linings,liners)– joiningandsealingmaterials(solventcements,weldingmaterials,gaskets,lubricatingoils),

– mechanicaldevicesusedintreatment/transmission/distributionsystems(valves,chlorinators,separationmembranes

– pipesandrelatedproducts(pipes,tanks,fittings)

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

5

Section64591‐ IndirectAdditives

• …testedandcertifiedasmeetingthespecificationsofNSFInternational/AmericanNationalStandardInstitute(NSF/ANSI)61‐2005/Addendum1.0‐2005(DrinkingWaterSystemComponents—HealthEffects),whichisherebyincorporatedbyreference

• ThisrequirementshallbemetundertestingconductedbyaproductcertificationorganizationaccreditedforthispurposebytheAmericanNationalStandardsInstitute.(ANSI)

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

6

ANSIandNSF

• NSFInternationalisastandardsdevelopmentorganizationandalsooperatesANSIaccreditedcertificationprograms.

• ThereareotherANSIaccreditedcertificationprograms.

• ANSI approvesstandardsandaccreditscertificationorganizations.(www.ansi.org)

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

7

ANSI– approvesSTDSandaccreditsprograms:http://www.ansi.org/

1. CanadianStandardsAssociationhttp://www.csagroup.org/us/en/industries/plumbing/drinking‐water‐requirements

2. IAPMOhttp://www.iapmortl.org/Pages/ANSINSF.aspx

3. NSFInternational(alsodevelopsstds)http://www.nsf.org/business/water_distribution/standard61_overview.asp

4. UnderwritersLaboratoryhttp://www.ul.com/global/eng/pages/offerings/industries/waterandfood/water/prodcert/components/

5. WaterQualityAssociationhttp://www.wqa.org “WQAGoldSeal”http://www.wqa.org/sitelogic.cfm?ID=1632

AccreditedCertificationPrograms

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

8

CurrentProjectOptionsforConcrete

Option3– FacilityCertificationMethod

Option2 – ConcreteSiteMixEvaluationMethod

Option1 – ApprovedComponentsCertificationMethod

Option4– AlternativeMethod

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

9

Option1– ApprovedComponentsCertificationMethod

Whenallcomponents(cement,admixtures,aggregates,etc.)oftheconcretemixturearecertifiedbyanapprovedNSF/ANSI61laboratory,noadditionaltestingisrequiredtocertifytheconcretemixture.Listsofapprovedcomponentscanbefoundatthefollowingwebsites:

– http://info.nsf.org/Certified/PwsComponents/– https://www.wqa.org/Find‐Products– http://database.ul.com/cgi‐bin/XYV/template/LISEXT/1FRAME/index.html

– http://pld.iapmo.org/default.aspx– http://www.csagroup.org/us/en/services/testing‐and‐certification/certified‐product‐listing

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

10

Option1– ApprovedComponentsCertificationMethod

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

11

Option1– ApprovedComponentsCertificationMethod

ConstituentApproval– ANSI/NSF61approvedadmixtures– ANSI/NSF61approvedcement

• Cemex• CalPortland• Lehigh•Mitsubishi

– AggregateTesting• ANSICertifiedLaboratory

– Totaldurationfortestingfromshippingofaggregates4‐8weeks

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

12

Option2‐ ConcreteSiteMixEvaluationMethodAprojectspecificmethodwhereaconcretemixtureistestedforNSF/ANSI61complianceeventhoughoneormoreoftheindividualcomponentsarenotcertified.Asampleofthehardenedconcrete,typicallyaconcretecylindercastbyanapprovedlaboratory ,isanalyzedtodetermineifthemixturemeetstherequiredspecifications.

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

13

Option2‐ ConcreteSiteMixEvaluationMethodCylinderTesting

– Developmixdesign– CastcylinderandsendtoANSIapprovedlaboratory– Soaktestingisperformed– Totaldurationfortestingfromstartofcasting8‐12weeks

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

14

Option3– FacilityCertificationMethodAbatchingfacilitycanbecertifiedtoproduceNSF/ANSI61approvedmixtures.Thismethodistypicallymoreexpensivethantheothermethodsbutallowsthefacilitytosupplytheapprovedmixturetoanyprojectsolongasthefacilitymaintainstheircertification(1‐5yearsdependingonthecertificationcompany).Theprocessforcertificationisasfollows:1. Companysubmitsanapplication.2. Provideproductformulation,toxicologyand

productuseinformation.3. Toxicologydepartmentreviewsformulations.4. Plantauditandsamplecollection.5. Laboratoryconductstesting.6. Finaltoxicologyevaluation.7. Certificationissuedforcompliantproducts

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

15

Option4‐ AlternativeMethod

ThelawallowsuserstoproposeanalternativemethodofcompliancetotheWaterBoardwithdemonstrationthattheproposedalternativewillprovidethesamelevelofprotectiontopublichealthandobtainwrittenapprovalfromthedepartment.

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

CityofSacramento,CA–ProjectCaseStudy

SteveCaswell

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

17

CityofSacramentoWaterTreatmentPlantRehabilitationProject

• $114M constructioncost• Currentlyunderconstruction• Two160MGDtreatmentplants• Replacing90yearoldconventionaltreatmenttrain• Addingsolidshandlingfacilitiestobothtreatmentplants

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

18

ProjectTimeline

Planning2007‐2009

Design2010‐2012

ConstructionNTP May2013

ConstructionCompletionAugust2016

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

19

Design‐ RegulatoryDiscussions

• Summer2012– DPH positiononlycementandadmixturesmeetNSF61,notaggregate

• Latefall2012– DPH indicatesthataggregateand/orcylindertestingMAYberequired

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

20

Design‐ SupplierDiscussions

Supplier ConstituentTesting CylinderTesting

Cement Admixture Aggregate

Supplier1 Yes Yes No Possibility

Supplier2 ? Yes No ?

Supplier3 ? Yes No ?

Supplier4 No Yes No Yes

Supplier5 No Yes No No

Supplier6 Yes Yes No Possibility

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

21

Design‐ SupplierDiscussions

Supplier Constituent Testing CylinderTesting

Cement Admixture Aggregate

Supplier1 Yes Yes No Possibility

Supplier2 ? Yes No ?

Supplier3 ? Yes No ?

Supplier4 No Yes No Yes

Supplier5 No Yes No No

Supplier6 Yes Yes No Possibility

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

22

Design‐ SpecificationDevelopment

• Factorstoaddress– Unknownregulatoryposition– Unknownabilityofsupplierstomeetstandard– Couldtestingbecompletedpriortobid?– Scheduleimplications

• Approach– Constituent‐OR‐ Cylindertestingallowed– Contractorresponsibleforallcosts– Mustbeapprovedpriortoanyconcretepours

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

23

Construction‐ ConcreteComplianceMethods

• ConcreteConference– Supplierindicatedusingconstituentmethod– StartedtestingpriortoNTP– Approvaltook10weeks– ApprovalnotanNSFlisting

• Massconcreteimplications– Useofflyash– Requiredtestingusingcylindermethod– Approvaltook3months

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

24

Construction‐ OtherConsiderations

• DefininglocationsthatrequireNSF61concrete• Pre‐caststructures

– Nopre‐castsuppliershaveNSF61approvals– Canusejobmixorgetapproval

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

25

CaseStudiesCentralValley

• 1.10MGStorageTank• InsideDiameter:86’‐0”• WallHeight:26’‐0”• ConcreteCompliancethroughConstituentComplianceAlliedConcretewasSupplier– NSFapprovedadmixtures– NSFapprovedcement(CalPortland)– AggregatetestingthroughIAMPO

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

26

CaseStudiesCentralValley,CA

• 3.0MGStorageTank• InsideDiameter:126’‐0”• WallHeight:37’‐0”• ConcreteCompliancethroughConstituentComplianceCalaveraswasConcreteSupplier– NSFapprovedadmixtures– NSFapprovedcement(Lehigh)– AggregatetestingthroughUL

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

27

ProjectDevelopment• Understandearlyinprojectdesign/developmentifconcretewillbeincontactwithpotablewater.

• Engageinconversationswithlocalconcretesuppliersand/ormanufacturersonavailability

• Determineiftestingwillbedonepriortobidorafterbid

• Testingrequirementscanbesetforthinspecificationsforoncontractor

• Testingmaybedonebyownerorconsultantpriortobid

• CheckwithyourlocalWaterBoardofficeregardingcompliance

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

28

GoingForward• NSFStd 61Table3.1– MaterialSpecificAnalyses

– Dec2012Proposedtestsforcementbeyondregulatedmetals• GC/MS,• dioxinsandfurans,• radionuclides,• glycolsandethanolamines

• Longtermgoal:Istestingnecessaryconsideringatrackrecordofresults.

• Foracertainvolume/surfaceareacantestingbewaived.

Car

ollo

Tem

plat

eWat

erW

ave.

pptx

29

Summary

Testingcanbecompletedforanyprojectthrough:ConstituentTestingCylinderTesting

Questions?