Rainier Ave S Vision Zero Corridor (Phase 2 ) · Rainier Ave S Vision Zero Corridor (Phase 2 )...

Post on 17-Aug-2020

0 views 0 download

Transcript of Rainier Ave S Vision Zero Corridor (Phase 2 ) · Rainier Ave S Vision Zero Corridor (Phase 2 )...

RainierAveSVisionZeroCorridor(Phase2)

SeattleBicycleAdvisoryBoardJamesLeJuly12,2017

Ourmission,vision,andcorevalues

Committedto5corevaluestocreateacitythatis:• Safe• Interconnected• Affordable• Vibrant• Innovative

Forall

Mission:deliverahigh-qualitytransportationsystemforSeattle

Vision:connectedpeople,places,andproducts

2

Overview

• Background• Projectlocation• Alternatives• Outreach• Schedule• Questionsandanswers

3

InvestinginRainierAveSProjectsalongRainier:– ColumbiaCityRPZ– RainierAveSPhase2– AccessibleMt.Baker– Rte.7RapidRide

4

VisionZero(Ph.2)

Goals:– Reducecrashes– Enhancesafetyforall– Ensureefficientandreliabletransitservice

Budget:$2million

5“We♥ SoutheastSeattle”CommunityForum– March7,2017

Context

6

Streetcharacteristics:• Principalarterial• 4to5lanes,52feetwide• 17,500-20,000averageweeklydailytraffic

• 13,000+dailytransitriders• Parkingalternatesides

Existingcross-sectionforPhase1

7

AlaskatoKenny,1mile– implemented2015

Existingcross-sectionforPhase2

8

KennytoHenderson,2miles

Locationofparkingalternatesoneastandwestsidealongcorridor

9

• InboundBusinessAccessandTransit(BAT)laneimprovesbusoperations

• Providesadditionalon-streetparkingalongRainierAveS

• AccommodatesfutureRapidRide

Alternative1:Benefits

8’Parking

12’Travellane

10’Turnlane

10’Travellane

12’BATlane

FacingNorthbound

Alternative1:Considerations• BATlanemaybeusedasillegalpassinglane• BATlanesmaynotbefullyuseduntilRapidRideisoperationalin2021

• FinalBATlaneconfigurationremovesparkingalongRainier

FacingNorthbound

108’

Parking12’

Travellane10’

Turnlane10’

Travellane12’

BATlane

11

• Providesnorth-southbikeroute• Maximizesuseofright-of-wayspace• Provideson-streetparking

Alternative2:Benefits

Crosssectionatmajorintersections(note– turnlanesattheintersection)

Crosssectionbetweenmajorintersections

FacingNorthbound(bothcrosssections)

12

Alternative2:Considerations

Crosssectionatintersections—includesturnlane

Crosssectionbetweenintersections

Maynegativelyimpacttransitandgeneraltrafficspeeds

13

• Enhanceconditionsforpedestriansandpeoplebiking• Addresslocationwithhighestnumberofpedestriancrashes

Rainier&Hendersonprotectedintersection

RainierA

veS

SHendersonSt

14

Alternative2about$5.6+million* forprotectedbikelane,18concretetransitislands,Hendersonintersection.Doesnotincludepavementreconstruction,potentialtrolleywirerelocation,inletsThisalternativeexceedsourprojectbudget

Costestimate$$$

$

Alternative1about$1.6millionforrechannelization,signing,andHendersonintersection

(Costestimatesincludematerials,installation,and30%contingencybasedonSDOT’s2017UnitCostsAnalysisSheet)

Outreach

• Onlineopenhouse– Infotranslatedto8languages–Willbeopentothepublicnextweek

• FocusedoutreachtokeySESeattlestakeholders– Communityconversations– Staffconversations– Smallbusinessengagement– InterceptsurveysalongRainier

15

Schedule

Date Activity

Summer2017 Online openhouse,communityconversations,doortodooroutreachalongRainierAveS

Summer2018 Construction

Fall2019 1-yearprojectevaluationreport

16

Questions?

James.Le@seattle.gov|(206)684-3174http://www.seattle.gov/transportation/southeastseattle.htm

www.seattle.gov/transportation