RAILWAY TRANSPORT
FACILITATION IN MONGOLIA
Ministry of
Road and
Transport
Mongolia
“Facilitation and Costing of Railway
Services along the Trans-Asian Railway”
Bangkok, 09-11 December 2015
STATE POLICY ON RAILWAY TRANSPORTATION
(Parliament Resolution No.32, June 24, 2010)
Phase I - appr. 1100 km
Phase II - appr. 900 km
Phase III - appr. 3600 km
Existing railways
• Wagon - 6,577
• Locomotive - 182
• Freight transportation
- 21.0 million ton
• Passenger
transportation- 3.7
million persons
• Human resource
• UBTZ - 15,002
• MTZ - 1,568
• Income - 155 million
USD
• Total rail line– 1,908 км
• Stations
• UBTZ - 80
• Bold tumur yuruu
gol - 5
GENERAL INFORMATION
0.56 1.11
3.91 2.38
4.72
6.86
9.78
15.03
19.8
14.52
7.33
9.18
15.57
16.8
0
5000
10000
15000
21.1 20.4
20000
25000 /mil.tn/
Domestic Export Import Transit
CURRENT FREIGHT TRANSPORTATION (1951-2014)
Iron ore 26%
Coal 36%
Construction material 10%
Petroleum 8%
Container 5%
Copper 4%
3%
Color and black iron 3%
Spar, Food coke 2%
1%
Chemical Other 1%
Wood, wooden
goods 1%
Net weight of freight transportation /as of 2014/
CURRENT FREIGHT TRANSPORTATION
0.06 0.08 0.43
0.74 1.07
1.42
2.72 2.83
4.29
3.52
3.76
0.00
0.50
1.00
1.50
2.1 2.00
2.50
3.00
3.50
4.00
4.50
5.00
4.84
/mill.person/
0.44
4.3 4
CURRENT PASSENGER TRANSPORTATION (1951-2013)
EXISTING LEGAL BASIS
For Mongolia:
Law on Railway transport – 2007
State policy on Railway transportation – 2010
For international railway transport:
Membership in OSJD – SMGS, SMPS
- “International Agreement on Freight Traffic Relations”, OSJD
- “International Agreement on Passenger Traffic Relations”, OSJD
- Other Common Rules and Regulations for Railway Transport
UIC
TIR Convention UNESCAP -Joint statement on Future Development of Euro-Asian Transport links
-Joint Declaration on the promotion of Euro-Asian rail transport and activities towards unified railway law
Mutual agreement:
- Cross border railway agreements with Russia and China
34 million tn/year
21 million tn/year
2020
Year >100 million tn
• Double track
• Electrification
Decision by “UBTZ” General committee on 2013.11.06 for
modernization with amount of 256 million USD
2013 20 16 increase 60%
RAILWAY DEVELOPMENT STRATEGY: UBTZ TECHNICAL
MODERNIZATION (2013-2020)
“AGREEMENT FOR PARTNERSHIP IN UBTZ MODERNIZATION AND
DEVELOPMENT STRATEGY” 2014.09.03
Sainshand
Darkhan
Transit from Russia
to China
6 million ton/year
Ovoot coking coal
deposit : 10 million
ton/year
Tuva, Elista coal mining
deposit, Russia: 15
million ton/year
Transit from China to
Russia/Europe
3 million ton/year
RAILWAY DEVELOPMENT STRATEGY: NORTHERN FREIGHT FLOW
ACCESS TO SEAPORTS
Trans asian railway corridor
Ekaterinburg
Astana
Óâåé
Lyaniyunigan
Ulaanbaatar
Óðóìчè
Beijing
Dalyan
Tyanitszini
Õàðáèí
Êàðûìñêàÿ
Çàóäèíñêèé
çàâîä
Irkutsk
6488 км Ekaterinburg – AStana – Urumchi– Ubei - Lyaniyunigan
6723 км Ekaterinburg –Irkutsk – Carimskaya – Kharbin – Dalyan
5975 км Ekaterinburg –Irkutsk – Ulaanbaatar – Beijing – Tyanitszini
17
Tariff, USD/1ton-km
RJD
UBJD
KJD
KZK
Coal 0,011 0,014 0,031 0,038
Petroleum 0,038 0,027 0,033 0,043
Container 0,015 0,031 0,039 0,028
Wood 0,019 0,017 0,026 0,031
CROSS BORDER RAIL TRANSPORT: “FLEXIBLE TARIFF” /2013/
Үнэ
Хэмжээ 0 3 сая тн
1 сая тн
0,5 сая тн
2 сая тн
STRICT TERM
Zamiin-Uud
Sukhbaatar
Zamiin-Uud
Sukhbaatar
Russia to China
36 hours
40 hours
China to Russia
Zone-2: 70Т GANTRY CRANE OPERATIONAL
AREA
Zone-3: Open Warehouse
Zone-1: 50T CRANE 4 RAILWAY ACROSS
Zone-3 Enclosed Warehouse
MULTIMODAL LOGISTICS CENTER IN ZAMIIN-UUD CROSS BORDER
Freight capacity 5 mill. ton/ year
Financing 71,64
million USD
Operation 2018
After completion of this project Zamyn-Uud border point’s freight turnover will increase 80
percent, transportation delay time or congestion will decrease 50 percent in 2018
comparing with in 2009.
Further actions needed:
• Interconnection of customs
• Introduction of common standard/system for freight entry
declaration
• Real time information
• Flexible tariffs
• Agree with Border cross technology for certain distance and
transport modes with common interested conditions