Railroad Commission of Texas

RICK BEHAL

ON-LINE COMPLETIONS - UIC

1

LOG IN

2

ON-LINE APPLICATIONS

3

COMPLETION APPLICATION

4

SELECT FILING OPERATOR

5

FILING OPTIONS/MESSAGES

FILING OPTIONS/MESSAGES

6

Well Completion Package - Search

7

8

9

10

Packet Data Oil/W-2 – Well Data

11

Page 1: Potential Data not required when filing for active or shut-in UIC (well type)

W-2 Page 1 – Potential Test, Completion or Recompletion Report

12

13

14

Weight & Multi-StageTool depth are only fields that can be left blank.If using multi-stage (DV) tool, use separate line for each cement stage

15

Actual Perfs, not Permitted Zone

List formation tops (3)

List all work chronologically

Please add remarks

16

17

Add additional Forms

L-1 Electric Log Status

18

P-4 Certificate of Compliance and Transportation Authority

19

P-4 Certificate of Compliance and Transportation Authority – Certify

20

W-12 Inclination Report

File On-line Form W-12AND attach pdf of hard-copy Form W-12 with data and 2 signatures.

W-12 Inclination Report required for all new drills and re-entry of “dry hole” that was PA’d and completion data was never submitted (Refer to SWR 11)

21

Attachments

22

Messages

23

24

25

26

27

28

Injection Permitting Technical Staff:

UIC Section 512-463-6792

Doug Johnson, Manager 512-463-6760Douglas.Johnson@rrc.state.tx.us

Rick Behal 512-463-6473Richard.Behal@rrc.state.tx.us

Chichi Christine 512-463-2259Chichi.Christine@rrc.state.tx.us

Jim Moore 512-463-6443Jim.Moore@rrc.state.tx.us

Jo Kilpatrick-William 512-463-6439Jo.Kilpatrick-Williams@rrc.state.tx.us

Nagi Mabruk 512-475-4655Nagi.Mabruk@rrc.state.tx.us

Robert Freymuller 512-936-0981Robert.Freymuller@rrc.state.tx.us

29