Post on 27-Dec-2015
Radar and EW Knowledge Base27 November 2008
Presented by Brian FERGUSONTellumat Defence Marketing & Sales Manager
Introduction to Tellumat Defence
• Electronics & Precision Mechanical Company• Private, 100% South African• Based in Cape Town, Offices in Pta and Jnb• Design, Manufacture, Supply, Support• Wide and High Technology Base• Broad and Deep Industrial Base• Independent from Multi-Nationals• Develop Alliances and Partnerships
Tellumat Business Activities
• Telecoms• Wireless Radio Solutions• Contract Manufacturing• Defence – Radar• Defence – Navigation Systems• Defence – Communication Systems• Defence – Identification and Data Link Systems• Defence – Mechanical Artillery Fuzes
& Safe-and-Arm Devices
• Develop technologies, systems and products• Develop re-usable building blocks and
technology elements to form the basis of families of systems and products
• Joint development programmes between Tellumat and development partners
• Minimise time to market for the systems and products
• Minimise technical and schedule risk by following an iterative development approach
Technology Development Objectives
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36YEAR 1 YEAR 2 YEAR 3
TECHNOLOGY DEVELOPMENT
PRODUCTDEVELOPMENT
TEST SYSTEMS DEVELOPMENT
VERIFICATION AND
VALIDATION
MANAGEMENT, SUPPORT AND
SERVICE ACTIVITIES
PROGRAM AND PROJECT MANAGEMENT
R&
D
PL
AN
NIN
G LONG-TERM R&D
USER REQ.
STUDY
PRODUCT SPECIFICATION
AND ARCHITECTURE
DEFINITION
PRODUCTDEVELOPMENT
ITERATION 1
PRODUCTQUALIFICATION
TEST SYSTEMS SPECIFICATION
AND ARCHITECTURE
DEFINITION
PRODUCTDEVELOPMENT
ITERATION 2
PRODUCTDEVELOPMENT
ITERATION 3
TEST SYSTEMSDEVELOPMENT
ITERATION 1
TEST SYSTEMSDEVELOPMENT
ITERATION 2
TEST SYSTEMSDEVELOPMENT
ITERATION 3
VERIFICATION AND VALIDATION
PLANS AND PROCEDURES
PRODUCTQUALIFICATION
TEST SYSTEMSQUALIFICATION
SYSTEMS ENGINEERING
CONFIGURATION MANAGEMENT
MEDIUM-TERM R&D
PLATFORMS
SHORT TERM R&D
MILESTONES PDRCDR
1CDR
2CDR
3ENDSTART
PROCUREMENT AND LOW-VOLUME MANUFACTURING
QUALITY ASSURANCE
VERIFICATION AND VALIDATION FOR
ITERATION 1
VERIFICATION AND VALIDATION FOR
ITERATION 2
VERIFICATION AND VALIDATION FOR
ITERATION 3
Technology Development Process
Technologies in Tellumat
• DSP Processing from IF (Sub Nyquist Sampling)• Simulation with “Hardware-in-the-Loop”• Selected elements of SDR (Software Defined Radio)• UML for software design / documentation• SysML for system engineering• RTOS Real Time Operating System (VXWorks)• Software designed to international certification
requirements (RTCA DO-178B, 278 etc)• Combination of proprietary and OEM (Open
Standard) hardware
Technologies in Tellumat
• 3-D modelling of mechanical elements• Thermal analysis / cooling design using finite
element analysis• Electronically steerable antenna arrays• Micro-strip / micro-wave design using simulation
tools (ADS - Advanced Design System)• High powered solid state pulsed amplifiers• Monopulse processing / tracking• Cryptographic software and hardware
Primary Radar Activities
• AR3D Long Range Air Defence Radars
– Support and Upgrade• AFRAS Airfield and Precision Approach Radars
– Support
• Antenna– Total refurbishment and overhaul– Automatic temperature / pressure sensing
• Transmitter– Complete refurbishment and overhaul– New digital sweeper– New technology oscillating circuitry– Enhancements to power generation system– Stability improvements – New secure pulse pattern (ECCM)
AR3D Upgrade Details
• Signal Processing– New receivers– New MTI (moving target indicator)– Clutter map
• Radar Control– New radar processor– Improved HMI (human machine interface)
• BITE (Built-In Test Equipment)– New improved BITE
• Processor and Displays– New generation COTS technology– New generation scan conversion technology
AR3D Upgrade Details
• Operational Software– Proven flexible Windows based system – Latest air space control functions– Plot integration flexibility– Software is adaptable (easy to change) – On-line diagnostics
• Tech Mon Upgrade
AR3D Upgrade Details
• Sweeper - 62• Transmitter amplitude - 54• Phase correction - 55• Antenna scanning - 72• Clutter motion - 84• STALO stability - 55• COHO stability - 53• PSD / ADC (incl. timing jitter)- 55• Quantisation - 59
Total - 46.9 db
AR3D MTI Improvement Factor Budget
Secondary Radar Activities
• Transponders• Interrogators• Cryptographic Computers• Crypto Data Management• Secure IFF Systems
Challenge (1030 MHz)Challenge (1030 MHz)
Reply (1090 MHz)Reply (1090 MHz)
IFFInterrogator
IFFInterrogator
IFFTransponder
IFFTransponder
CryptoData
Management
CryptoData
Management
InterrogatorCrypto
Computer
InterrogatorCrypto
Computer
TransponderCrypto
Computer
TransponderCrypto
Computer
TracksTracksTo
DecisionNodes
PrimarySensor
PrimarySensor
Plots
IFF - Generic Configuration
The world’s only Mk XII-based IFF system outside of NATO
• Secure mode better than Mode 4, similar to Mode 5 – Time comparison– Aircraft data transfer capability (Height and ID)
• Algorithms• Key generation• Key distribution, programming and loading• Crypto computers
Secure Mode IFF System
Secure Mode IFF System
Maritime Patrol and AEW
FPS
FG
FG TCC's
ICC's
Air Defence Installations
FPS
FG ICC
Air Space Control Sensors
FPS
FG ICC
Naval Bases, Vessels in Port
FPS
FG
FG TCC's
ICC
Naval Vessels
FPS
FG
FG TCC's
ICC
Other Air Force Squadrons
FPS
FG
FG TCC's
CITCC'sJointKey
Generation
Secure Mode IFF System Elements
CT-2000Transponder CC CR-1015
Interrogator CC
CTR-2520CIT CC
FG-2000Fill-gun
• Sensor interrogator upgrades• Target transponder upgrades• Cryptographic data management
systems
National Identification Systems
Thank you
Questions?