Radar and EW Knowledge Base 27 November 2008 Presented by Brian FERGUSON Tellumat Defence Marketing...

Post on 27-Dec-2015

217 views 0 download

Transcript of Radar and EW Knowledge Base 27 November 2008 Presented by Brian FERGUSON Tellumat Defence Marketing...

Radar and EW Knowledge Base27 November 2008

Presented by Brian FERGUSONTellumat Defence Marketing & Sales Manager

Introduction to Tellumat Defence

• Electronics & Precision Mechanical Company• Private, 100% South African• Based in Cape Town, Offices in Pta and Jnb• Design, Manufacture, Supply, Support• Wide and High Technology Base• Broad and Deep Industrial Base• Independent from Multi-Nationals• Develop Alliances and Partnerships

Tellumat Business Activities

• Telecoms• Wireless Radio Solutions• Contract Manufacturing• Defence – Radar• Defence – Navigation Systems• Defence – Communication Systems• Defence – Identification and Data Link Systems• Defence – Mechanical Artillery Fuzes

& Safe-and-Arm Devices

• Develop technologies, systems and products• Develop re-usable building blocks and

technology elements to form the basis of families of systems and products

• Joint development programmes between Tellumat and development partners

• Minimise time to market for the systems and products

• Minimise technical and schedule risk by following an iterative development approach

Technology Development Objectives

M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36YEAR 1 YEAR 2 YEAR 3

TECHNOLOGY DEVELOPMENT

PRODUCTDEVELOPMENT

TEST SYSTEMS DEVELOPMENT

VERIFICATION AND

VALIDATION

MANAGEMENT, SUPPORT AND

SERVICE ACTIVITIES

PROGRAM AND PROJECT MANAGEMENT

R&

D

PL

AN

NIN

G LONG-TERM R&D

USER REQ.

STUDY

PRODUCT SPECIFICATION

AND ARCHITECTURE

DEFINITION

PRODUCTDEVELOPMENT

ITERATION 1

PRODUCTQUALIFICATION

TEST SYSTEMS SPECIFICATION

AND ARCHITECTURE

DEFINITION

PRODUCTDEVELOPMENT

ITERATION 2

PRODUCTDEVELOPMENT

ITERATION 3

TEST SYSTEMSDEVELOPMENT

ITERATION 1

TEST SYSTEMSDEVELOPMENT

ITERATION 2

TEST SYSTEMSDEVELOPMENT

ITERATION 3

VERIFICATION AND VALIDATION

PLANS AND PROCEDURES

PRODUCTQUALIFICATION

TEST SYSTEMSQUALIFICATION

SYSTEMS ENGINEERING

CONFIGURATION MANAGEMENT

MEDIUM-TERM R&D

PLATFORMS

SHORT TERM R&D

MILESTONES PDRCDR

1CDR

2CDR

3ENDSTART

PROCUREMENT AND LOW-VOLUME MANUFACTURING

QUALITY ASSURANCE

VERIFICATION AND VALIDATION FOR

ITERATION 1

VERIFICATION AND VALIDATION FOR

ITERATION 2

VERIFICATION AND VALIDATION FOR

ITERATION 3

Technology Development Process

Technologies in Tellumat

• DSP Processing from IF (Sub Nyquist Sampling)• Simulation with “Hardware-in-the-Loop”• Selected elements of SDR (Software Defined Radio)• UML for software design / documentation• SysML for system engineering• RTOS Real Time Operating System (VXWorks)• Software designed to international certification

requirements (RTCA DO-178B, 278 etc)• Combination of proprietary and OEM (Open

Standard) hardware

Technologies in Tellumat

• 3-D modelling of mechanical elements• Thermal analysis / cooling design using finite

element analysis• Electronically steerable antenna arrays• Micro-strip / micro-wave design using simulation

tools (ADS - Advanced Design System)• High powered solid state pulsed amplifiers• Monopulse processing / tracking• Cryptographic software and hardware

Primary Radar Activities

• AR3D Long Range Air Defence Radars

– Support and Upgrade• AFRAS Airfield and Precision Approach Radars

– Support

• Antenna– Total refurbishment and overhaul– Automatic temperature / pressure sensing

• Transmitter– Complete refurbishment and overhaul– New digital sweeper– New technology oscillating circuitry– Enhancements to power generation system– Stability improvements – New secure pulse pattern (ECCM)

AR3D Upgrade Details

• Signal Processing– New receivers– New MTI (moving target indicator)– Clutter map

• Radar Control– New radar processor– Improved HMI (human machine interface)

• BITE (Built-In Test Equipment)– New improved BITE

• Processor and Displays– New generation COTS technology– New generation scan conversion technology

AR3D Upgrade Details

• Operational Software– Proven flexible Windows based system – Latest air space control functions– Plot integration flexibility– Software is adaptable (easy to change) – On-line diagnostics

• Tech Mon Upgrade

AR3D Upgrade Details

• Sweeper - 62• Transmitter amplitude - 54• Phase correction - 55• Antenna scanning - 72• Clutter motion - 84• STALO stability - 55• COHO stability - 53• PSD / ADC (incl. timing jitter)- 55• Quantisation - 59

Total - 46.9 db

AR3D MTI Improvement Factor Budget

Secondary Radar Activities

• Transponders• Interrogators• Cryptographic Computers• Crypto Data Management• Secure IFF Systems

Challenge (1030 MHz)Challenge (1030 MHz)

Reply (1090 MHz)Reply (1090 MHz)

IFFInterrogator

IFFInterrogator

IFFTransponder

IFFTransponder

CryptoData

Management

CryptoData

Management

InterrogatorCrypto

Computer

InterrogatorCrypto

Computer

TransponderCrypto

Computer

TransponderCrypto

Computer

TracksTracksTo

DecisionNodes

PrimarySensor

PrimarySensor

Plots

IFF - Generic Configuration

The world’s only Mk XII-based IFF system outside of NATO

• Secure mode better than Mode 4, similar to Mode 5 – Time comparison– Aircraft data transfer capability (Height and ID)

• Algorithms• Key generation• Key distribution, programming and loading• Crypto computers

Secure Mode IFF System

Secure Mode IFF System

Maritime Patrol and AEW

FPS

FG

FG TCC's

ICC's

Air Defence Installations

FPS

FG ICC

Air Space Control Sensors

FPS

FG ICC

Naval Bases, Vessels in Port

FPS

FG

FG TCC's

ICC

Naval Vessels

FPS

FG

FG TCC's

ICC

Other Air Force Squadrons

FPS

FG

FG TCC's

CITCC'sJointKey

Generation

Secure Mode IFF System Elements

CT-2000Transponder CC CR-1015

Interrogator CC

CTR-2520CIT CC

FG-2000Fill-gun

• Sensor interrogator upgrades• Target transponder upgrades• Cryptographic data management

systems

National Identification Systems

Thank you

Questions?