qbModConTiwi Islands Construction Crew

Tiwi Islands 2009 qbModCon Modular House

Tiwi IslandsDay One Site Preparation for footings

Floor Frame Complete

Modular Floor Frame Set Out The Concrete Footings

Day two Floor Frame Completed with Concrete Footings

Installing The Flooring and Structural Extrusions

Day 3 Install Viva Board Flooring and qbModCon Structural Extrusions

The Exterior Walls and WindowsDay 4 Set-out External Walls with qbModCon Structural Extrusions

The Local Fella’s Working Hard

Installing the Ring Beam & TrussesDay 5 Complete External Walls and Tighten Down Ring Beam for Truss Installation

Installing the Trusses , Ridge and Hip beams

Day 6 Continue Truss Installation -with Ridge and Hip Beam Extrusions

Installing Internal Walls prior to roof panels

Hip Beam Installation

Up Go the Roof Panels

Day Seven-With the Truss Sections and qbModCon Ridge Beams in Place Install the Roof Panels

Internal Walls

Day 8 Finishing of Internal Walls

•Trim-Deck Roof Sheets •Available in Various colours•Powder coated Aluminium rails •Composite Decking•Heat Insulated Walls•R-Value 3.78•Cool in Summer•Warm in Winter•Eco Friendly•Cyclone Proof•Virtually Maintenance free

Day Nine Install the Roof Sheets and all Flashings.Continue with the finishing touches on the exterior

The Internal Fit Out

The Internal Fit Out•Acrylic rendered walls•Tiled Floors•Melamine Kitchen•Combination Upright stove•Double Stainless Sink•Cathedral Ceilings•Large Open plan•Kitchen Lounge and Dinning

110 sqm 3 Bedroom Modular House

Sustainable Housing By qbModCon

Exposed Trusses Cool and Spacious

The Finished Product

Tiled Bathroom Full Kitchen

The Local Construction Crew

Tiwi IslandsLocal Construction Crew

•Guiseppe Tipiloura

•Russell Yunupingu

•Stephen O Keeffe

•Ben Bokkerink

•Zachary Bloor

•Rodney Coleman

•Malcolm Blair

qbModCon3 Bedroom 110 sqm House with 18 sqm deckNguiu 2009

Tiwi Islands 2009

We would like to personally thank Leah Kerinauia all of the Friendly local Indigenous workers from Nguiu and Melville Island the locals at Tiwi Barge ,Brian Clancy from Tiwi Island Land Council, Bernard & Lynette(TLO) ,The Tiwi Collage ,The Licensed Contractors from MiBT and all the people who made this project successful

RegardsDavid Holmes