PWSAC Wastewater Treatment Upgrades RFP.pdfREQUEST FOR PROPOSALS
PWSAC WASTEWATER UPGRADES Page 1 of 7
PRINCE WILLIAM SOUND AQUACULTURE CORPORATION
REQUEST FOR PROPOSALS
SCOPE OF SERVICES: The Prince William Sound Aquaculture Corporation
(“PWSAC”) hereby invites qualified general contractors
(“Contractor”) to submit proposals for wastewater treatment
collection, treatment, and disposal.
The scope of work includes all materials, labor, and equipment to
refurbish domestic wastewater collection and treatment systems in
three locations in Prince William Sound; Main Bay Hatchery, Armin
F. Koernig Hatchery and Wally Noerenberg Hatchery.
The successful contractor will be required to submit proof of
business licensure, insurances, and tax certification as noted in
the RFP.
The RFP does not commit the PWSAC to award a contract, nor to pay
any of the costs incurred in the preparation and submission of
Proposals in anticipation of a contract. The PWSAC reserves the
right to waive irregularities and accept or reject any or all
Proposals.
PRE-PROPOSAL CONFERENCE: A non-mandatory pre-Proposal Q&A
meeting will be held via Teams on March 26th, 2021. Detailed
connection information will be distributed the day prior. To
attend, please submit interest via email to Geoff Clark,
geoff.clark@pwsac.com.
DEADLINE FOR PROPOSALS: Proposals must be received by PWSAC no
later than 5:00 PM April 2nd, 2021. Proposals shall be clearly
marked REQUEST FOR PROPOSALS, PWSAC WASTEWATER TREATMENT SYSTEM
UPGRADES. If presented in hard-copy, proposals must be sealed and
delivered in person, by courier, or by U.S. Mail postage paid, to
PWSAC at the address below.
If by Courier or In-Person Delivery: If by U.S. Postal
Service:
6148 Nielsen Way, Anchorage, AK 99518 P.O. Box 1110, Cordova, AK
99574
Alternatively, proposal documents if delivered via email shall be
submitted to Geoff Clark, geoff.clark@pwsac.com Acknowledgement of
addenda may be delivered by email, and confirmation of receipt of
any submitted documents is the sole responsibility of the
Proposer.
1.0 GENERAL TERMS AND CONDITIONS
1.1 Pre-Proposal
Proposers should carefully examine this entire RFP, its addenda,
and all related materials and data referenced herein. Proposers
shall be fully aware of the nature of the work and the conditions
likely to be encountered in performing the work. This duty of full
preparation
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 2 of 7
falls to each Proposer. By submitting a bid each proposer
represents and warrants that it has fulfilled this duty.
1.2 Proposal Format
Proposals are to be prepared in such a way as to provide a
straightforward and concise delineation of the Proposer’s
capability to satisfy the requirements of this RFP.
1.3 Proposal Development and Submittal
Emphasis should be concentrated on conformance to the RFP
instructions, responsiveness to the RFP requirements, and on
completeness and clarity of content.
This solicitation does not commit the PWSAC to select any
Contractor for the requested services. All costs associated with
the respondents’ preparations, submission and oral presentations
shall be the responsibility of the Proposer.
1.4 Signature Requirement
Proposals must be signed by an employee, officer or other agent of
the proposer authorized to sign contracts on its behalf. Submission
of such an acceptable signature shall be construed as binding the
submitting party to the Proposal.
1.5 Questions
Questions must be submitted via email to Geoff Clark,
geoff.clark@pwsac.com.
1.6 Late Submissions
Proposals not received prior to the date and time specified in the
RFP, or otherwise modified by Addendum, shall not be considered,
and will be returned unopened after recommendation of award.
1.7 Withdrawal of Proposals
At any time prior to the scheduled closing time for receipt of RFP
submittals, any responding firm may withdraw its submittal via
email to Geoff Clark, geoff.clark@pwsac.com. However, a Proposal
shall not be withdrawn after opening without the written consent of
PWSAC.
1.8 Proposal Acceptance Period
It is anticipated that award will be announced within 30 calendar
days of the proposal submittal date; however, all offers must be
irrevocable for 60 days following the proposal submission
date.
1.9 Right to Reject / Award
The PWSAC may reject any or all Proposals, if the PWSAC Manager
determines that it is in the best interest of the PWSAC, and may
waive irregularities, other than the requirements for timeliness
and manual signature, if the irregularities do not affect the
competitive advantage of any Proposer.
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 3 of 7
Award will be made to the most qualified Proposer, whose offer is
deemed most advantageous to the PWSAC, all evaluation criteria
considered. The PWSAC may choose to interview only the top-ranking
firms as based on proposal review and scores. Unsuccessful offerors
will be notified.
1.10 Licenses and Certification
Proposers shall include with their Proposals copies of all
licenses, certificates, registrations, and other credentials
required for performance under the contract. Documentation of the
same must be current and must have been issued by or under
authority of the State of Alaska or, if documentation is from an
outside jurisdiction, such documentation submitted must be of a
form accepted as valid by the State of Alaska for performance in
Alaska. Such documentation shall include, but is not limited to, a
current Alaska business license for the business to be conducted,
applicable professional licenses, registrations, and all necessary
certificates.
2.0 SCOPE OF WORK
The following is presented for assessment purposes only. The final
scope of work will be that agreed to as part of the final signed
contract between PWSAC and the prevailing bidder. In the event
there is any alleged conflict or inconsistency between the scope of
work discussed in these bid documents (including the attached
plans), and the scope of work in the parties’ contract, the latter
will prevail.
If the Proposer has any questions regarding the scope of work and
attached plans, including a belief that the bid documents are
insufficiently specific, the Proposer must raise these issues prior
to submitting their Proposal, otherwise they are waived. All work
will require consultation with PWSAC. PWSAC will purchase the tanks
and stage them in Anchorage. The Contractor shall acquire and/or
furnish all other necessary materials as specified in the attached
plans including but not limited to piping, fittings, lift stations,
tools, and fill materials/aggregate. The Contractor shall mobilize
all materials in Anchorage for PWSAC to transport to Whittier then
to each site. The Contractor shall provide details as to the
mobilization of all materials and aggregate to the construction
site, including any needs or requests for PWSAC support, via the
Anchorage Distribution Center and/or the Alaskan Challenger. A
loader shall be made available for use at site upon Contractor
request and all detail of its use will be formalized at the time of
contract approval.
Transport to each site will require close coordination and planning
with PWSAC. PWSAC has only one landing craft to service all its
remote facilities. It is not available “as needed.” Further,
certain sites have very specific tide restrictions for materials
delivery. Finally, weather is always a factor in accessing and
leaving these sites. The Contractor shall coordinate with PWSAC
regarding landing craft limitations and schedule. Housing at each
site shall be provided to Contractor by PWSAC, and Contractor will
abide by all PWSAC policies and restrictions while at PWSAC sites.
Armin F. Koernig Hatchery, Prince William Sound: See attached
plans. (Final plans will be provided prior to construction.) Time
if of the essence and all work MUST be completed by September 30,
2021.
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 4 of 7
Wally Noerenberg Hatchery, Prince William Sound: See attached
plans. (Final plans will be provided prior to construction.) Time
if of the essence and all work MUST be completed by September 30,
2021. Main Bay Hatchery, Prince William Sound: See attached plans.
(Final plans will be provided prior to construction.) Time if of
the essence and all work MUST be completed by September 30,
2022.
3.0 PROPOSAL AND SUBMISSION REQUIREMENTS
To achieve a uniform review process and obtain the maximum degree
of comparability, it is required that the Proposals be organized in
the manner specified below. There is a 20-page limit for the
Proposal, including resumes, licenses, and addenda.
3.1 Capability to Perform
• Provide a history of the firm, technical qualifications and areas
of expertise, address
of office that will manage project, length of time in business,
firm’s legal structure, firm’s commitment to provide necessary
resources to perform and complete project in a timely manner.
• List names of the persons who are authorized to make
representations for your firm, their titles, address, and telephone
numbers.
• The letter must be signed by a corporate officer or other
individual who has the authority to bind the firm.
3.2 Qualifications and Experience of the Firm
• Detail the firm's expertise and experience in the same or similar
projects and scale
executed by the firm that demonstrate relevant experience. •
Provide a list of public sector clients with an emphasis on remote
projects and fish
hatchery related projects for whom you have performed similar work
in the past five years. Include name, address, and a phone number
of a person who can be contacted regarding the firm’s performance
on each project.
3.3 Key Project Staff and Consultants
• Identify key project staff with their roles within the project
clearly identified, as well as
those key staff for subconsultants expected to provide services on
behalf of the firm. • Identify the project manager who will be
responsible for the day-to-day management
of project tasks and will be the Owner’s primary point of contact.
• Provide a qualification synopsis or resumes for each of the
individuals referenced. • Be specific about the proposed staff
regarding experience and qualifications on
projects of similar size and scope. • The Proposal should discuss
the current workload of proposed staff and the
organization’s ability to perform the services within the
established timeline.
3.4 Methodologies, Approach, Timeline
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 5 of 7
• Provide detailed information on the firm's methodology in meeting
the scope of work requirements in this RFP, which provides interest
and insight to the specific details of the project. This should
consist of a detailed work plan indicating the tasks to be
accomplished, the resources that will be utilized and the timeline
for completion.
• Describe overall approach to executing the project, to include
any unique aspects
envisioned or alternative approaches, including budget sensitivity,
efficiency, completeness, pertinence of the tasks, and logic of the
overall approach.
3.5 Fixed Cost
Provide a fixed cost Proposal, with a detailed breakdown by
discipline and by man hours, in spreadsheet form, including
estimated reimbursables.
Cost will be evaluated using a ratio method after all qualitative
scoring is completed. The Proposal with the lowest cost receives
the maximum points allowed. All other Proposals receive a
percentage of the points available based on their cost relationship
to the lowest cost Proposal. The following formula will be
used:
• lowest cost Proposal/cost Proposal being evaluated (x) maximum
points available =
awarded points for Cost criteria.
4.0 PROPOSAL EVALUATION PROCESS
Evaluation Process
An evaluation committee, of not less than three people,
representing the PWSAC will review, evaluate, score and rank
Proposals, in accordance with criteria identified in this
RFP.
PWSAC also reserves the right to request oral interviews with the
highest ranked individuals or firms (short list). The purpose of
the interviews with the highest ranked firms is to allow for
clarification to, expansion upon, and possible refinement of, the
written responses. If interviews are conducted, a maximum of three
firms will be short-listed. A second score sheet, with the same
categories and score points used for the first evaluation, will be
used to score those firms interviewed as a second evaluation. The
final recommendation for selection will be based on the total of
all evaluators scores achieved on the second rating.
The evaluation committee will forward a recommendation for contract
award based on points awarded. The General Manager will review the
results of the selection committee. The company, whose Proposal is
ranked highest, subject to approval by the PWSAC General Manager,
may be invited to enter final negotiations with the PWSAC for the
purposes of contract award. The criteria to be considered during
evaluations, and the associated point values, are as follows:
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 6 of 7
Capability to Perform 10 Points
Qualifications and Experience of the firm 10 Points
Key Project Staff and Subconsultants 10 Points
Methodology, Approach, Timeline 20 Points
Cost 50 Points
Total Points 100 Points
5.0 Qualitative Rating Factor
Firms will be ranked using the following qualitative rating
factors, excluding cost, for each RFP criteria:
1.0 = Outstanding .8 = Excellent .6 = Good .4 = Fair .2 = Poor 0.0
= Unsatisfactory
The rating factor for each criteria category, except for cost, will
be multiplied against the points available to determine the total
points for that category.
6.0 SELECTION PROCESS
The Proposer with the highest total evaluation points will be
invited to enter contract negotiations with PWSAC. If an agreement
cannot be reached with the highest ranked Proposer, the PWSAC shall
notify the Proposer and terminate the negotiations. If Proposals
are submitted by one or more other proposers determined to be
qualified, negotiations may then be conducted with such other
Proposers in the order of their respective rankings. This process
may continue until successful negotiations are achieved. PWSAC
reserves the right to reject any and all Proposals submitted.
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 7 of 7
7.0 FIXED COST PROPOSAL FORM
Payments to Contractor shall be made based upon the phased progress
of the project as measured by reference to Contractor's Cost
Proposal. Additional Services requested outside the scope of work
will be compensated in accordance with the Contractor’s Fee
Schedule. Contractor’s Fixed cost shall include all labor,
expenses, overhead and profit associated with performing the scope
of work. Detailed estimates of each task shall be provided as
attachments to this proposal but are for reference purposes
only.
Construction Services By Phase 2021 Mobilization ________________
Armin F. Koernig Hatchery Sewer Installation _________________
Wally Noerenberg Hatchery Sewer Installation _________________ 2022
Mobilization _________________ Main Bay Hatchery Sewer Installation
_________________ Proposed Fixed Cost Budget
_________________
Consultant acknowledges receipt of Addenda No(s).1, 2, and 3, and
hereby represents that if awarded a contract they will enter into
and execute a contract with PWSAC for construction services
referenced in this Request for Proposal at the Fixed Cost
compensation stated above.
By executing this Proposal, I certify that I have the authority to
bind the Contractor or other business entity, who is submitting
this Proposal.
Contractor’s Signature:
PWSAC - AFK WWTS Upgrades 65% Plan Review Materials Estimate
3/18/2021
No. Pay Item Pay Unit Plan Quantity 1 Mobilization / Bonding /
Insurance / Demob. / PM LS 1
2 Xerxes Recirc/Primary Tank and Comp. (FOB Anch) EA 1 3 Anua Tanks
and Comp. (FOB Anch) EA 3 4 Other WWTP Components (FOB Anch) EA 1 5
Common Excavation Tank Sites (deposit on site) EA 2 6 Remove and
Dispose Exist. Septic Tank EA 2 7 D-1 Fill & Compact
(Recirc/Primary) CY 30 8 D-1 Fill & Compact (Pods) CY 30 9
Stackable Blocks EA 30 10 WWTP Piping (1.5") LF 150 11 WWTP Piping
(4") LF 150 12 Pre-cast Concrete Vault EA 0 13 Salcor UV Units EA 4
14 Sampling Port EA 2 15 Flow Meter EA 1 16 Electrical system LS 1
17 Rock Trenching Blasting or Chipping LF 0
18 Hatchery Drain Re-route EA 2 19 4" PVC LF 345 20 6" PVC LF 230
21 Rock Trenching Blasting or Chipping LF 0 22 Sewer Manhole EA 2
23 Misc. Piping Materials EA 1
24 6" HDPE (Uplands) LF 160 25 6" HDPE (Marine) LF 315 26 Pipe
Anchors EA 20
Marine Outfall Insallation
Collection System Installation
WasteWater Treatment Plant Installation
Assumptions: 1) This materials estimate is based on 65% review
plans. ADEC review is active 2) These values to not account for
redline revisions. 3) Housing and meals shall be provided while
on-site (4 weeks)
Addenda No.1 Material Estimates for WWTS - AFK, WNH, MBH
PWSAC - WNH WWTS Upgrades 65% Plan Review Materials Estimate
3/18/2020
No. Pay Item Pay Unit Plan Quantity 1 Mobilization / Bonding /
Insurance / Demob. LS 1
2 Xerxes Recirc/Primary Tank and Comp. (FOB Anch) EA 1 3 Anua Tanks
and Comp. (FOB Anch) EA 6 4 Other WWTP Components (FOB Anch) EA 1 5
Common Excavation Tank Sites (deposit on site) EA 2 6 Remove and
Dispose Exist. Septic Tank EA 1 7 D-1 Fill & Compact
(Recirc/Primary) CY 30 8 D-1 Fill & Compact (Pods) CY 60 9
Stackable Blocks EA 60
10 WWTP Piping (1.5") LF 150 11 WWTP Piping (4") LF 150 12 Pre-cast
Concrete Vault EA 0 13 Salcor UV Units EA 4 14 Sampling Port EA 2
15 Flow Meter EA 1 16 Electrical system LS 1 17 Rock Trenching
Blasting or Chipping LF 0
18 Hatchery Drain Re-route EA 2 19 Liberty Pump Lift Station EA 2
20 Sand (Lift Station Decomission ) CY 5 21 2" HDPE Force Main LF
650 22 2" HDPE Force Main Connection EA 3 23 Flush Station EA 1 24
4" PVC LF 325 25 6" PVC LF 60 26 Rock Trenching Blasting or
Chipping LF 0 27 Misc. Piping Materials EA 1
28 6" C900 (Uplands) LF 150 29 6" C900 (Marine) LF 150 30 Pipe
Anchors EA 10
Marine Outfall Insallation
Collection System Installation
WasteWater Treatment Plant Installation
Assumptions: 1) This materials estimate is based on 65% review
plans. ADEC review is active 2) These values to not account for
redline revisions. 3) Housing and meals shall be provided while
on-site (4 weeks)
Addenda No.1 Material Estimates for WWTS - AFK, WNH, MBH
PWSAC - MBH WWTS Upgrades 65% Plan Review Materials Estimate
3/18/2020
No. Pay Item Pay Unit Plan Quantity 1 Mobilization / Bonding /
Insurance / Demob. LS 1
2 Xerxes Recirc/Primary Tank and Comp. (FOB Anch) EA 1 3 Anua Tanks
and Comp. (FOB Anch) EA 3 4 Other WWTP Components (FOB Anch) EA 1 5
Common Excavation Tank Sites (deposit on site) EA 2 6 Abandon
Exist. Septic Tank in place EA 1 7 D-1 Fill & Compact
(Recirc/Primary) CY 30 8 D-1 Fill & Compact (Pods) CY 60 9
Stackable Blocks EA 60
10 WWTP Piping (1.5") LF 150 11 WWTP Piping (4") LF 150 12 Pre-cast
Concrete Vault EA 0 13 Salcor UV Units EA 4 14 Sampling Port EA 2
15 Flow Meter EA 1 16 Electrical system LS 1 17 Rock Trenching
Blasting or Chipping LF 0
18 Hatchery Drain Re-route EA 1 19 Liberty Pump Lift Station EA 2
20 2" HDPE Force Main LF 360 21 2" HDPE Force Main Connection EA 1
22 Flush Station EA 1 23 4" PVC LF 150 24 6" PVC LF 350 25 Rock
Trenching Blasting or Chipping LF 0 26 Misc. Piping Materials EA 1
27 Storm Water Grading, LS 1
28 6" HDPE (Uplands) LF 100 29 6" HDPE (Marine) LF 600 30 Pipe
Anchors EA 30
Marine Outfall Insallation
Collection System Installation
WasteWater Treatment Plant Installation
Assumptions: 1) This materials estimate is based on 65% review
plans. ADEC review is active 2) These values to not account for
redline revisions. 3) Housing and meals shall be provided while
on-site (4 weeks)
Addenda No.1 Material Estimates for WWTS - AFK, WNH, MBH
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
PROJECT VICINITY MAP NOT TO SCALE
WASTEWATER TREATMENT SYSTEM UPGRADES
Addenda No.2 2021 Design Plans for AFK and WNH WWTS
AutoCAD SHX Text
AutoCAD SHX Text
C200 SITE PLAN
AutoCAD SHX Text
THIS PROJECT CONSISTS OF WASTEWATER TREATMENT UPGRADES FOR THE
ARMIN F. KOERNIG HATCHERY OWNED AND OPERATED BY THE PRINCE WILLIAM
SOUND AQUACULTURE CORPORATION. THE UPGRADES SHALL INCLUDE A NEW
WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED COLLECTION AND PIPING
SYSTEMS AND A MARINE OUTFALL.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
1) THE EXISTING UNDERGROUND UTILITIES WERE DRAWN USING THE BEST
AVAILABLE INFORMATION INCLUDING SURFACE EVIDENCES MEASURED DURING
THE SITE SURVEY, OWNER SUPPLIED ASBUILT/RECORD DRAWINGS, AND
INTERVIEWS WITH PLANT MANAGERS AND STAFF. THE UNDERGROUND UTILITIES
SHOWN HEREON ARE SYMBOLIC ONLY AND MAY NOT REFLECT THE ACTUAL
LOCATION. 2) THESE PLANS WERE PREPARED USING INFORMATION FROM A
SITE INSPECTION BY AN R&M ENGINEERING-KETCHIKAN REPRESENTATIVE
CONDUCTED ON 9/21-23/2020. THIS SITE INSPECTION INCLUDED A SITE
SURVEY USING HIGH-PRECISION, TRIMBLE R8/R10 GPS HIGH-PRECISION,
TRIMBLE R8/R10 GPS RECEIVERS DIFFERENTIALLY CORRECTED AND PROCESSED
USING TRIMBLE BUSINESS CENTER V 5.10 SOFTWARE 3) THESE PLANS DEPICT
STRUCTURES AND FEATURES PERTINENT TO THE WASTEWATER TREATMENT
SYSTEM DESIGN ONLY. NOT ALL DECKS, AWNINGS, ETC. ARE SHOWN.
ADDITIONALLY, ANY UNDERGROUND UTILITIES OR FEATURES NOT MADE
APPARENT BY EVIDENCES DESCRIBED IN NOTE 1) ARE NOT SHOWN. 4) THE
VERTICAL DATUM FOR THIS PROJECT IS MEAN LOWER LOW WATER 5) NO
PROPERTY INFORMATION IS SHOWN ON THESE DRAWINGS. IT IS THE
RESPONSIBILITY OF PWSAC TO COORDINATE ALL LEASES WITH THE STATE OF
ALASKA AND THE U.S. FOREST SERVICE AS NEEDED FOR CONSTRUCTION
AND/OR ENSURE THAT ALL PROPOSED UPGRADES SHOWN ON THESE PLANS DO
NOT CONFLICT WITH EXISTING LEASES AND LAND USE PERMITS. 6) CLIENT
OR CONTRACTOR SHALL USE TRACER DYE TO VERIFY ALL HATCHERY WATER
DISCHARGES (FLOOR DRAINS, ETC.) HAVE BEEN REMOVED FROM THE DOMESTIC
WASTEWATER COLLECTION, TREATMENT, AND OUTFALL SYSTEMS.
ADDITIONALLY, ANY OTHER NON-DOMESTIC WASTEWATER IS NOT PERMITTED TO
DISCHARGE TO SAID SYSTEMS. 7) GREASE TRAPS SHALL BE INSTALLED ON
ALL KITCHENS. 8) THESE PLANS SHALL BE SENT TO THE LIFT STATION
MANUFACTURER OR AREA DISTRIBUTOR FOR COMMENT PRIOR TO ORDERING LIFT
STATIONS OR PUMPS. 9) THE WWTP MUST BE INSTALLED BELOW THE GROUND
SURFACE OR IN AN ENCLOSURE INSULATED AND HEATED TO A MINIMUM OF
50°F.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
4" HDPE OUTFALL REPORTED BROKEN AND NOT SECURED IN THIS AREA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" PVC CLEANOUT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
12" HDPE FISH TENDER LINE SECURED TO EDGE OF DOCK
AutoCAD SHX Text
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
REMOVE OR ABANDON EXISTING TANK IN PLACE. FILL WITH SAND
AutoCAD SHX Text
REPLACE ALL ABOVE GROUND HDPE WATER LINES WITH SIMILAR TYPE AND
SIZE ARCTIC PIPE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SECURE 6" HDPE OUTFALL TO PILINGS OF TIMBER DOCK WITH GALVANIZED
PIPE CLAMPS AND LAG BOLTS EVERY 10'
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: PROVIDE LAT/LONG LOCATION OF PROVIDE LAT/LONG LOCATION OF
OUTFALL TERMINUS TO DESIGN ENGINEER IMMEDIATELY AFTER COMPLETION OF
CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRADE, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING 4" PVC
AutoCAD SHX Text
INSTALL 6" HDPE GRAVITY EFFLUENT LINE FROM WASTEWATER TREATMENT
PLANT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL 6" HDPE GRAVITY EFFLUENT LINE FROM WASTEWATER TREATMENT
PLANT
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING 12" HDPE FISH TENDER LINE SECURED TO EDGE OF DOCK
AutoCAD SHX Text
AutoCAD SHX Text
SECURE 6" HDPE OUTFALL TO PILINGS OF TIMBER DOCK WITH GALVANIZED
PIPE CLAMPS AND LAG BOLTS EVERY 10'
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
1) THIS WASTEWATER TREATMENT PLANT PLAN DEPICTS THE TREATMENT ORDER
OF THE PROPOSED SYSTEM. TANK LAYOUT/LOCATION IS PERMITTED TO VARY
BASED ON SITE CONDITIONS. FURTHERMORE, THE PRIMARY TREATMENT AND
RECIRCULATION/PUMP TANK MAY BE SPLIT INTO MULTIPLE, SEPARATE TANKS;
CHAMBER VOLUMES SHOWN ON THIS WWTP MUST BE MAINTAINED. ALL
MODIFICATIONS MUST BE APPROVED BY THE DESIGN ENGINEER BEFORE
IMPLEMENTATION. 2) THE SYSTEM SHALL BE INSTALLED COMPLETELY BELOW
GRADE, ABOVE GRADE IN A HEATED ENCLOSURE, OR A COMBINATION OF BOTH.
3) INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT
ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR
HOUSING. 4) EACH STA-RITE PUMP SHALL SUPPLY PRIMARY TREATED WASTE
WATER TO THE AEROCELL PODS ON AN ALTERNATING TIME BASIS. AFTER THE
WATER PASSES THROUGH THE PODS, 80% SHALL FLOW BACK TO THE
RECIRCULATION/PUMP CHAMBER, AND 20% SHALL CONTINUE ALONG THE
TREATMENT AND EFFLUENT DISPOSAL PATH. 5) TANKS THAT ARE BURIED MUST
BE ANCHORED PER MANUFACTURER TANKS THAT ARE BURIED MUST BE ANCHORED
PER MANUFACTURER RECOMMENDATIONS.
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
AutoCAD SHX Text
10,OOO GALLON (~9,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK
WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY
TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER
WITH DUPLEX PUMP SYSTEM.
AutoCAD SHX Text
AutoCAD SHX Text
THIRD CHAMBER SHALL ACT AS A RECIRCULATION/PUMP CHAMBER WITH THE
FOLLOWING COMPONENTS: 1) (2) STA-RITE STEP PLUS SERIES STEP
50-05121 TURBINE PUMP IN SIM/TECH NO VAULT PUMP FILTER. INSTALL
CHECK VALVES AND WEEP HOLE ABOVE EACH PUMP. INSTALL PUMP ON
36"x36"x12" TALL PLATFORMS (MANUFACTURER INSTALLED) 2) DRYDEN AQUA
FINE BUBBLE AI DIFFUSER POWERED BY A HIBLOW HP-200 LINEAR AIR
COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING. 3)
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
AutoCAD SHX Text
1-1/2" SCH 40 PVC FEED LINES. INSTALL TO DRAIN BACK TO XERXES TANK
AFTER EACH PUMP CYCLE VIA WEEP HOLE.
AutoCAD SHX Text
QUANICS AEROCELL NS-1000-AC TREATMENT UNIT WITH INSULATION AND
TOPCOAT, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW BACK TO THIRD CHAMBER OF XERXES TANK
AT 2% MIN. SLOPE (80% RETURN LINES)
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW AT 2% MIN. SLOPE (20% DISCHARGE
LINES)
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCUALTION
LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
80% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCULATION
LINE)
AutoCAD SHX Text
20% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER
PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT
ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR
HOUSING.
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
4" CROSSOVER TEES
AutoCAD SHX Text
AutoCAD SHX Text
36" BY 36" BY 12" TALL PUMP PLATFORMS. (MANUFACTURER
INSTALLED)
AutoCAD SHX Text
(2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMPS IN
SIM/TECH IN SIM/TECH NO VAULT PUMP FILTER
AutoCAD SHX Text
INSTALL CHECK VALVES ABOVE EACH PUMP AND INSTALL WEEP HOLE ABOVE
EACH CHECK VALVE
AutoCAD SHX Text
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
10,OOO GALLON (~9,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK
WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY
TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER
WITH DUPLEX PUMP SYSTEM.
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE
TREATMENT TANK AND UP STREAM OF THE SAMPLING PORT
AutoCAD SHX Text
EFFLUENT FORM TANK
AutoCAD SHX Text
TO MARINE OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DOWN STREAM OF THE SAMPLING
PORTS. INSTALL SO FLOW METER HEADER IS ALWAYS FILLED WITH
WATER.
AutoCAD SHX Text
FLOW METER DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAMPLING PORT DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE
DISINFECTION UNITS
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: RIGID BOARD INSULATION JOINTS SHALL BE RIGID BOARD INSULATION
JOINTS SHALL BE LAPPED *H: ALSO REFERS TO CLEAR SPACING BETWEEN THE
PIPE AND OTHER DRAINAGE STRUCTURES OR THE WATER LINE.
AutoCAD SHX Text
4'0" OR GREATER NONE REQUIRED NONE REQUIRED 3'6" 1 INCH 1 INCH 3' 2
INCHES 2 INCHES 2'6"(MINIMUM) 4 INCHES 4 INCHES
AutoCAD SHX Text
AutoCAD SHX Text
PLACE CONCRETE OR STACK BALLAST ROCKS OVER PIPE. BALLAST SECTION TO
BE A MINIMUM 1'x1'X2' LONG AND PLACED 10' O/C AND AT EVERY PIPE
JOINT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL TRENCH DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS.
BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. 2. TRENCH
EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA
REGULATIONS AND TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH
LOCAL, STATE, AND OSHA REGULATIONS AND REQUIREMENTS. 3. INDICATED
SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL
GRAVEL AND INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY
FOR IMPORTED BACKFILL GRAVEL AND RESURFACING REQUIREMENTS. 4. IF
UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING
EXCAVATION, ENGINEER MAY DIRECT IF UNSUITABLE PIPE FOUNDATION
MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT THE
CONTRACTOR TO OVER-EXCAVATE AND BACKFILL WITH SUITABLE MATERIAL. 5.
THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER
TO ALLOW POSITIVE THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED
IN SUCH A MANNER TO ALLOW POSITIVE DRAINAGE TO MATCH
PRE-CONSTRUCTION CONDITIONS.
AutoCAD SHX Text
6" DEPTH OF 3/4" MINUS GRAVEL SURFACE COARSE COMPACTED TO 95% OF
MAX. DENSITY
AutoCAD SHX Text
BACKFILL MATERIAL SHALL CONTAIN NO ORGANIC MATTER AND SHALL BE 6"
DIAMETER OR LESS IN SIZE COMPACTED TO 95% WITHIN TRAFFIC AREAS AND
90% OUTSIDE OF TRAFFIC AREAS. EXCAVATED MATERIAL MAY BE USED AS
BACKFILL IF APPROVED BY THE ENGINEER.
AutoCAD SHX Text
PIPE BEDDING MATERIAL PLACED IN 6" LIFTS AND COMPACTED TO 95% OF
MAXIMUM DENSITY.
AutoCAD SHX Text
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
PROJECT LOCATION MAP NOT TO SCALE
PROJECT VICINITY MAP NOT TO SCALE
Addenda No.2 2021 Design Plans for AFK and WNH WWTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
THIS PROJECT CONSISTS OF WASTEWATER TREATMENT UPGRADES FOR THE
WALLY NOERENBERG HATCHERY OWNED AND OPERATED BY THE PRINCE WILLIAM
SOUND AQUACULTURE CORPORATION. THE UPGRADES SHALL INCLUDE A NEW
WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED COLLECTION AND PIPING
SYSTEMS AND A MARINE OUTFALL.
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
1) THE EXISTING UNDERGROUND UTILITIES WERE DRAWN USING THE BEST
AVAILABLE INFORMATION INCLUDING SURFACE EVIDENCES MEASURED DURING
THE SITE SURVEY, OWNER SUPPLIED ASBUILT/RECORD DRAWINGS, AND
INTERVIEWS WITH PLANT MANAGERS AND STAFF. THE UNDERGROUND UTILITIES
SHOWN HEREON ARE SYMBOLIC ONLY AND MAY NOT REFLECT THE ACTUAL
LOCATION. 2) THESE PLANS WERE PREPARED USING INFORMATION FROM A
SITE INSPECTION BY AN R&M ENGINEERING-KETCHIKAN REPRESENTATIVE
CONDUCTED ON 9/21-23/2020. THIS SITE INSPECTION INCLUDED A SITE
SURVEY USING HIGH-PRECISION, TRIMBLE R8/R10 GPS HIGH-PRECISION,
TRIMBLE R8/R10 GPS RECEIVERS DIFFERENTIALLY CORRECTED AND PROCESSED
USING TRIMBLE BUSINESS CENTER V 5.10 SOFTWARE 3) THESE PLANS DEPICT
STRUCTURES AND FEATURES PERTINENT TO THE WASTEWATER TREATMENT
SYSTEM DESIGN ONLY. NOT ALL DECKS, AWNINGS, ETC. ARE SHOWN.
ADDITIONALLY, ANY UNDERGROUND UTILITIES OR FEATURES NOT MADE
APPARENT BY EVIDENCES DESCRIBED IN NOTES 1 AND 5 ARE NOT SHOWN. 4)
THE VERTICAL DATUM FOR THIS PROJECT IS MEAN LOWER LOW WATER 5) A
PIPE CAMERA VIDEO PERFORMED ON MAY, 19, 2017 WAS PROVIDED BY THE
CLIENT TO ASSIST IN RE-CREATION OF THE EXISTING SEWER LINE
LOCATIONS, TYPES, AND SIZES. ADDITIONALLY, NO BREAKS OR MAJOR FLAWS
WERE FOUND IN THE SEWER MAIN FROM THE MAIN HATCHERY BUILDING
SERVICE LINES TO THE EXISTING SEPTIC TANK AT THAT TIME. 6) NO
PROPERTY INFORMATION IS SHOWN ON THESE DRAWINGS. IT IS THE
RESPONSIBILITY OF PWSAC TO COORDINATE ALL LEASES WITH THE STATE OF
ALASKA AND THE U.S. FOREST SERVICE AS NEEDED FOR CONSTRUCTION
AND/OR ENSURE THAT ALL PROPOSED UPGRADES SHOWN ON THESE PLANS DO
NOT CONFLICT WITH EXISTING LEASES AND LAND USE PERMITS. 7) IF THE
EXISTING MARINE OUTFALL IS FOUND TO BE BROKEN, UNSECURED, OR
DISCHARGING TO A DEPTH SHALLOWER THAN SHOWN ON THESE PLANS; CONSULT
THE DESIGN ENGINEER. THE LINE MUST BE REPAIRED, EXTENDED AND
SECURED, OR REPLACED AS NECESSARY. 8) CLIENT OR CONTRACTOR SHALL
USE TRACER DYE TO VERIFY ALL HATCHERY WATER DISCHARGES (FLOOR
DRAINS, ETC.) HAVE BEEN REMOVED FROM THE DOMESTIC WASTEWATER
COLLECTION, TREATMENT, AND OUTFALL SYSTEMS. ADDITIONALLY, ANY OTHER
NON-DOMESTIC WASTEWATER IS NOT PERMITTED TO DISCHARGE TO SAID
SYSTEMS. 9) GREASE TRAPS SHALL BE INSTALLED ON ALL KITCHENS. 10)
THESE PLANS SHALL BE SUBMITTED TO THE LIFT STATION MANUFACTURER OR
AREA DISTRIBUTOR FOR COMMENT PRIOR TO ORDERING LIFT STATIONS OR
PUMPS. 11) THE WWTP MUST BE INSTALLED BELOW THE GROUND SURFACE OR
IN AN ENCLOSURE INSULATED AND HEATED TO A MINIMUM OF 50°F.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=40'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
20
10
40
20
80
30
AutoCAD SHX Text
LIFT STATION MANHOLE SUMP I.E. = 9.0' 4" PVC IN (EAST) I.E. = 13.3'
4" PVC IN (NW) I.E. = 15.2' PLUGGED 4" PVC (WEST) I.E. = 13.4' 2"
PVC OUT (SOUTH) I.E. = 13.4'
AutoCAD SHX Text
4" SALTWATER INTAKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RECORD LOCATION OF (2) 18" SUPPLY LINES TO INCUBATION ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" PVC LATERAL
AutoCAD SHX Text
EXISTING MARINE OUTFALL
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
THIS DRAWING MAY BE REDUCED, VERIFY SCALE BEFORE USING
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
MAGNETIC 18° 34'
AutoCAD SHX Text
INSTALL LIBERTY D3696 BASIN W/LSG200 2HP SINGLE-STAGE DUPLEX
GRINDER PUMP SYSTEM W/RISERS N: 100155.33 E: 500259.36
AutoCAD SHX Text
INSTALL 4" PVC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL LIBERTY D3696 BASIN W/LSG200 2HP SINGLE-STAGE DUPLEX
GRINDER PUMP SYSTEM W/RISERS RIM ELEV = 19.1' +/- LOWEST INLET IE =
13.3' +/-
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING 2" PVC
AutoCAD SHX Text
EXISTING 8" PVC
AutoCAD SHX Text
EXISTING GRADE, TYP.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: PROVIDE LAT/LONG LOCATION OF PROVIDE LAT/LONG LOCATION OF
OUTFALL TERMINUS TO DESIGN ENGINEER IMMEDIATELY AFTER COMPLETION OF
CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
1) THIS WASTEWATER TREATMENT PLANT PLAN DEPICTS THE TREATMENT ORDER
OF THE PROPOSED SYSTEM. TANK LAYOUT/LOCATION IS PERMITTED TO VARY
BASED ON SITE CONDITIONS. FURTHERMORE, THE PRIMARY TREATMENT AND
RECIRCULATION/PUMP TANK MAY BE SPLIT INTO MULTIPLE, SEPARATE TANKS;
CHAMBER VOLUMES SHOWN ON THIS WWTP MUST BE MAINTAINED. ALL
MODIFICATIONS MUST BE APPROVED BY THE DESIGN ENGINEER BEFORE
IMPLEMENTATION. 2) THE SYSTEM SHALL BE INSTALLED COMPLETELY BELOW
GRADE, ABOVE GRADE IN A HEATED ENCLOSURE, OR A COMBINATION OF BOTH.
3) INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT
ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR
HOUSING. 4) EACH STA-RITE PUMP SHALL SUPPLY PRIMARY TREATED WASTE
WATER TO THE AEROCELL PODS ON AN ALTERNATING TIME BASIS. AFTER THE
WATER PASSES THROUGH THE PODS, 80% SHALL FLOW BACK TO THE
RECIRCULATION/PUMP CHAMBER, AND 20% SHALL CONTINUE ALONG THE
TREATMENT AND EFFLUENT DISPOSAL PATH. 5) TANKS THAT ARE BURIED MUST
BE ANCHORED PER MANUFACTURER TANKS THAT ARE BURIED MUST BE ANCHORED
PER MANUFACTURER RECOMMENDATIONS.
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
19,OOO GALLON (~18,000 GALLON WORKING VOLUME) XERXES FIBERGLASS
TANK WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY
TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER
WITH DUPLEX PUMP SYSTEM.
AutoCAD SHX Text
AutoCAD SHX Text
THIRD CHAMBER SHALL ACT AS A RECIRCULATION/PUMP CHAMBER WITH THE
FOLLOWING COMPONENTS: 1) (2) STA-RITE STEP PLUS SERIES STEP
50-05121 TURBINE PUMPS IN SIM/TECH NO VAULT PUMP FILTER. INSTALL
CHECK VALVES AND WEEP HOLE ABOVE EACH PUMP. INSTALL PUMP ON
36"x36"x12" TALL PLATFORMS (MANUFACTURER INSTALLED) 2) DRYDEN AQUA
FINE BUBBLE AI DIFFUSER POWERED BY A HIBLOW HP-200 LINEAR AIR
COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING. 3)
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
AutoCAD SHX Text
1-1/2" SCH 40 PVC FEED LINES. INSTALL TO DRAIN BACK TO XERXES TANK
AFTER EACH PUMP CYCLE VIA WEEP HOLE.
AutoCAD SHX Text
QUANICS AEROCELL NS-1000-AC TREATMENT UNIT WITH INSULATION AND
TOPCOAT, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW BACK TO THIRD CHAMBER OF XERXES TANK
AT 2% MIN. SLOPE (80% RETURN LINES)
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW AT 2% MIN. SLOPE (20% DISCHARGE
LINES)
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCUALTION
LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
36" BY 36" BY 12" TALL PUMP PLATFORMS. (MANUFACTURER
INSTALLED)
AutoCAD SHX Text
(2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMPS IN
SIM/TECH IN SIM/TECH NO VAULT PUMP FILTER
AutoCAD SHX Text
INSTALL CHECK VALVES ABOVE EACH PUMP AND INSTALL WEEP HOLE ABOVE
EACH CHECK VALVE
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
4" CROSSOVER TEES
AutoCAD SHX Text
INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT
ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR
HOUSING.
AutoCAD SHX Text
HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER
PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
80% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCULATION
LINE)
AutoCAD SHX Text
20% COLLECTION PIPING
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
19,OOO GALLON (~18,000 GALLON WORKING VOLUME) XERXES FIBERGLASS
TANK WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY
TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER
WITH DUPLEX PUMP SYSTEM.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE
TREATMENT TANK AND UP STREAM OF THE SAMPLING PORT
AutoCAD SHX Text
EFFLUENT FORM TANK
AutoCAD SHX Text
TO MARINE OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAMPLING PORT DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE
DISINFECTION UNITS
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
TYPICAL TRENCH DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS.
BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. 2. TRENCH
EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA
REGULATIONS AND TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH
LOCAL, STATE, AND OSHA REGULATIONS AND REQUIREMENTS. 3. INDICATED
SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL
GRAVEL AND INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY
FOR IMPORTED BACKFILL GRAVEL AND RESURFACING REQUIREMENTS. 4. IF
UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING
EXCAVATION, ENGINEER MAY DIRECT IF UNSUITABLE PIPE FOUNDATION
MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT THE
CONTRACTOR TO OVER-EXCAVATE AND BACKFILL WITH SUITABLE MATERIAL. 5.
THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER
TO ALLOW POSITIVE THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED
IN SUCH A MANNER TO ALLOW POSITIVE DRAINAGE TO MATCH
PRE-CONSTRUCTION CONDITIONS.
AutoCAD SHX Text
6" DEPTH OF 3/4" MINUS GRAVEL SURFACE COARSE COMPACTED TO 95% OF
MAX. DENSITY
AutoCAD SHX Text
BACKFILL MATERIAL SHALL CONTAIN NO ORGANIC MATTER AND SHALL BE 6"
DIAMETER OR LESS IN SIZE COMPACTED TO 95% WITHIN TRAFFIC AREAS AND
90% OUTSIDE OF TRAFFIC AREAS. EXCAVATED MATERIAL MAY BE USED AS
BACKFILL IF APPROVED BY THE ENGINEER.
AutoCAD SHX Text
PIPE BEDDING MATERIAL PLACED IN 6" LIFTS AND COMPACTED TO 95% OF
MAXIMUM DENSITY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: RIGID BOARD INSULATION JOINTS SHALL BE RIGID BOARD INSULATION
JOINTS SHALL BE LAPPED *H: ALSO REFERS TO CLEAR SPACING BETWEEN THE
PIPE AND OTHER DRAINAGE STRUCTURES OR THE WATER LINE.
AutoCAD SHX Text
4'0" OR GREATER NONE REQUIRED NONE REQUIRED 3'6" 1 INCH 1 INCH 3' 2
INCHES 2 INCHES 2'6"(MINIMUM) 4 INCHES 4 INCHES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLACE CONCRETE OR STACK BALLAST ROCKS OVER PIPE. BALLAST SECTION TO
BE A MINIMUM 1'x1'X2' LONG AND PLACED 10' O/C AND AT EVERY PIPE
JOINT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DOWN STREAM OF THE SAMPLING
PORTS. INSTALL SO FLOW METER HEADER IS ALWAYS FILLED WITH
WATER.
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT VICINITY MAP NOT TO SCALE
WASTEWATER TREATMENT SYSTEM UPGRADES
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
3
AutoCAD SHX Text
C200 SITE PLAN
AutoCAD SHX Text
C201 SITE PLAN
AutoCAD SHX Text
THIS PROJECT CONSISTS OF WASTEWATER TREATMENT UPGRADES FOR MAIN BAY
HATCHERY OWNED AND OPERATED BY THE PRINCE WILLIAM SOUND AQUACULTURE
CORPORATION. THE UPGRADES SHALL INCLUDE A NEW WASTEWATER TREATMENT
SYSTEM WITH ASSOCIATED COLLECTION AND PIPING SYSTEMS AND A MARINE
OUTFALL.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
1) THE EXISTING UNDERGROUND UTILITIES WERE DRAWN USING THE BEST
AVAILABLE INFORMATION INCLUDING SURFACE EVIDENCES MEASURED DURING
THE SITE SURVEY, OWNER SUPPLIED ASBUILT/RECORD DRAWINGS, AND
INTERVIEWS WITH PLANT MANAGERS AND STAFF. THE UNDERGROUND UTILITIES
SHOWN HEREON ARE SYMBOLIC ONLY AND MAY NOT REFLECT THE ACTUAL
LOCATION. 2) THESE PLANS WERE PREPARED USING INFORMATION FROM A
SITE INSPECTION BY AN R&M ENGINEERING-KETCHIKAN REPRESENTATIVE
CONDUCTED ON 9/21-23/2020. THIS SITE INSPECTION INCLUDED A SITE
SURVEY USING HIGH-PRECISION, TRIMBLE R8/R10 GPS HIGH-PRECISION,
TRIMBLE R8/R10 GPS RECEIVERS DIFFERENTIALLY CORRECTED AND PROCESSED
USING TRIMBLE BUSINESS CENTER V 5.10 SOFTWARE 3) THESE PLANS DEPICT
STRUCTURES AND FEATURES PERTINENT TO THE WASTEWATER TREATMENT
SYSTEM DESIGN ONLY. NOT ALL DECKS, AWNINGS, ETC. ARE SHOWN.
ADDITIONALLY, ANY UNDERGROUND UTILITIES OR FEATURES NOT MADE
APPARENT BY EVIDENCES DESCRIBED IN NOTE 1) ARE NOT SHOWN. 4) THE
VERTICAL DATUM FOR THIS PROJECT IS MEAN LOWER LOW WATER 5) NO
PROPERTY INFORMATION IS SHOWN ON THESE DRAWINGS. IT IS THE
RESPONSIBILITY OF PWSAC TO COORDINATE ALL LEASES WITH THE STATE OF
ALASKA AND THE U.S. FOREST SERVICE AS NEEDED FOR CONSTRUCTION
AND/OR ENSURE THAT ALL PROPOSED UPGRADES SHOWN ON THESE PLANS DO
NOT CONFLICT WITH EXISTING LEASES AND LAND USE PERMITS. 6) CLIENT
OR CONTRACTOR SHALL USE TRACER DYE TO VERIFY ALL HATCHERY WATER
DISCHARGES (FLOOR DRAINS, ETC.) HAVE BEEN REMOVED FROM THE DOMESTIC
WASTEWATER COLLECTION, TREATMENT, AND OUTFALL SYSTEMS.
ADDITIONALLY, ANY OTHER NON-DOMESTIC WASTEWATER IS NOT PERMITTED TO
DISCHARGE TO SAID SYSTEMS. 7) GREASE TRAPS SHALL BE INSTALLED ON
ALL KITCHENS. 8) THESE PLANS SHALL BE SUBMITTED TO THE LIFT STATION
MANUFACTURER OR AREA DISTRIBUTOR FOR COMMENT PRIOR TO ORDERING LIFT
STATIONS OR PUMPS. 9) THE WWTP MUST BE INSTALLED BELOW THE GROUND
SURFACE OR IN AN ENCLOSURE INSULATED AND HEATED TO A MINIMUM OF
50°F.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=40'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
20
10
40
20
80
30
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONCRETE RETAINING WALL
AutoCAD SHX Text
AutoCAD SHX Text
FUEL STORAGE TANK
AutoCAD SHX Text
FUEL STORAGE TANK
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
10
5
20
10
40
15
INSTALL LIBERTY PROVORE 680 W/PRG-SERIES DUPLEX GRINDER PUMP SYSTEM
IN CRAWLSPACE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVITY SEWER MAIN TO BE CONVERTED TO SEWER/STORM
OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL CHECK VALVE
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
10
5
20
10
40
15
INSTALL 4,000 GALLON XERXES 2-CHAMBERED PRIMARY TREATMENT TANK WITH
POLYLOK PL-525 EFFLUENT FILTER ON OUTLET
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVITY SEWER MAIN TO BE CONVERTED TO STORM SYSTEM
AutoCAD SHX Text
AutoCAD SHX Text
S SE
R V
S S ERV
S S ERV
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
INSTALL 2" HDPE
AutoCAD SHX Text
INSTALL 4" PVC
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVITY SEWER MAIN TO BE CONVERTED TO TREATED SEWER/STORM
WATER OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL 6" C900
AutoCAD SHX Text
NOTE: PROVIDE LAT/LONG LOCATION OF PROVIDE LAT/LONG LOCATION OF
OUTFALL TERMINUS TO DESIGN ENGINEER IMMEDIATELY AFTER COMPLETION OF
CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL LIBERTY D3672 W/LSG200 2HP DUPLEX GRINDER PUMP SYSTEM N:
100366.01 E: 500032.44
AutoCAD SHX Text
S SERV
S SERV
S SERV
S SERV
S SERV
S SE
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047
HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
INSTALL 4" PVC
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVITY SEWER MAIN TO BE CONVERTED TO STORM WATER
SYSTEM
AutoCAD SHX Text
INSTALL 6" C900
AutoCAD SHX Text
NOTE: PROVIDE LAT/LONG LOCATION OF PROVIDE LAT/LONG LOCATION OF
OUTFALL TERMINUS TO DESIGN ENGINEER IMMEDIATELY AFTER COMPLETION OF
CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL 4,000 GALLON XERXES 2-CHAMBERED PRIMARY TREATMENT TANK WITH
POLYLOK PL-525 EFFLUENT FILTER ON OUTLET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONNECT STORM WATER SYSTEM TO EXISTING OUTFALL. BY-PASS EXISTING
WWTP
AutoCAD SHX Text
INSTALL LIBERTY 1100-SERIES BASIN W/LE100 1HP DUPLEX PUMP SYSTEM
W/RISERS N: 100417.93 E: 499905.85
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL BACKFLOW PREVENTOR
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
EXISTING GRADE, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL LIBERTY D3672 W/LSG200 2HP SINGLE-STAGE DUPLEX GRINDER PUMP
SYSTEM RIM ELEV = 19.6' +/- SUMP IE = 12.6' +/-
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRADE, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL 6" C900
AutoCAD SHX Text
INSTALL 6" HDPE
AutoCAD SHX Text
EXISTING 8" PVC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL LIBERTY 1100-SERIES BASIN W/LE100 1HP DUPLEX PUMP SYSTEM
W/RISERS RIM ELEV = 17.6' +/- INLET IE = 12.6' +/- +/-+/-
AutoCAD SHX Text
INSTALL 4,000 GALLON XERXES 2-CHAMBERED PRIMARY TREATMENT TANK WITH
POLYLOK PL-525 EFFLUENT FILTER ON OUTLET
AutoCAD SHX Text
EXISTING 8" PVC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
1) THIS WASTEWATER TREATMENT PLANT PLAN DEPICTS THE TREATMENT ORDER
OF THE PROPOSED SYSTEM. TANK LAYOUT/LOCATION IS PERMITTED TO VARY
BASED ON SITE CONDITIONS. FURTHERMORE, THE PRIMARY TREATMENT AND
RECIRCULATION/PUMP TANK MAY BE SPLIT INTO MULTIPLE, SEPARATE TANKS;
CHAMBER VOLUMES SHOWN ON THIS WWTP MUST BE MAINTAINED. ALL
MODIFICATIONS MUST BE APPROVED BY THE DESIGN ENGINEER BEFORE
IMPLEMENTATION. 2) THE SYSTEM SHALL BE INSTALLED COMPLETELY BELOW
GRADE, ABOVE GRADE IN A HEATED ENCLOSURE, OR A COMBINATION OF BOTH.
3) INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT
ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR
HOUSING. 4) EACH STA-RITE PUMP SHALL SUPPLY PRIMARY TREATED WASTE
WATER TO THE AEROCELL PODS ON AN ALTERNATING TIME BASIS. AFTER THE
WATER PASSES THROUGH THE PODS, 80% SHALL FLOW BACK TO THE
RECIRCULATION/PUMP CHAMBER, AND 20% SHALL CONTINUE ALONG THE
TREATMENT AND EFFLUENT DISPOSAL PATH. 5) TANKS THAT ARE BURIED MUST
BE ANCHORED PER MANUFACTURER RECOMMENDATIONS. 6) "ALTERNATE A"
SHALL UTILIZE THE SAME WWTP PLAN SHOWN ON THIS SHEET WITH THE
EXCEPTION OF THE 10,000 GALLON XERXES TANK. IN PLACE OF THIS TANK,
INSTALL (2) XERXES PRIMARY TREATMENT TANKS AT DIFFERENT LOCATIONS
ON THE SITE (PER PLAN) AND A 4,000 GALLON SINGLE CHAMBERED XERXES
RECIRCULATING/PUMP TANK IN THE WWTP. ALL OTHER COMPONENTS AND
TREATMENT ORDERS SHALL REMAIN IDENTICAL.
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
AutoCAD SHX Text
10,OOO GALLON (~9,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK
WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY
TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER
WITH DUPLEX PUMP SYSTEM.
AutoCAD SHX Text
AutoCAD SHX Text
THIRD CHAMBER SHALL ACT AS A RECIRCULATION/PUMP CHAMBER WITH THE
FOLLOWING COMPONENTS: 1) (2) STA-RITE STEP PLUS SERIES STEP
50-05121 TURBINE PUMP IN SIM/TECH NO VAULT PUMP FILTER. INSTALL
CHECK VALVES AND WEEP HOLE ABOVE EACH PUMP. INSTALL PUMP ON
36"x36"x12" TALL PLATFORMS (MANUFACTURER INSTALLED) 2) DRYDEN AQUA
FINE BUBBLE AI DIFFUSER POWERED BY A HIBLOW HP-200 LINEAR AIR
COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING. 3)
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
AutoCAD SHX Text
1-1/2" SCH 40 PVC FEED LINES. INSTALL TO DRAIN BACK TO XERXES TANK
AFTER EACH PUMP CYCLE VIA WEEP HOLE.
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW BACK TO THIRD CHAMBER OF XERXES TANK
AT 2% MIN. SLOPE (80% RETURN LINES)
AutoCAD SHX Text
QUANICS AEROCELL NS-1000-AC TREATMENT UNIT WITH INSULATION AND
TOPCOAT, TYP.
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW AT 2% MIN. SLOPE (20% DISCHARGE
LINES)
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCUALTION
LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
80% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCULATION
LINE)
AutoCAD SHX Text
20% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER
PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT
ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR
HOUSING.
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
4" CROSSOVER TEES
AutoCAD SHX Text
AutoCAD SHX Text
36" BY 36" BY 12" TALL PUMP PLATFORMS. (MANUFACTURER
INSTALLED)
AutoCAD SHX Text
(2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMPS IN
SIM/TECH IN SIM/TECH NO VAULT PUMP FILTER
AutoCAD SHX Text
INSTALL CHECK VALVES ABOVE EACH PUMP AND INSTALL WEEP HOLE ABOVE
EACH CHECK VALVE
AutoCAD SHX Text
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
10,OOO GALLON (~9,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK
WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY
TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER
WITH DUPLEX PUMP SYSTEM.
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE
TREATMENT TANK AND UP STREAM OF THE SAMPLING PORT
AutoCAD SHX Text
EFFLUENT FORM TANK
AutoCAD SHX Text
TO MARINE OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAMPLING PORT DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE
DISINFECTION UNITS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
TYPICAL TRENCH DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS.
BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. 2. TRENCH
EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA
REGULATIONS AND TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH
LOCAL, STATE, AND OSHA REGULATIONS AND REQUIREMENTS. 3. INDICATED
SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL
GRAVEL AND INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY
FOR IMPORTED BACKFILL GRAVEL AND RESURFACING REQUIREMENTS. 4. IF
UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING
EXCAVATION, ENGINEER MAY DIRECT IF UNSUITABLE PIPE FOUNDATION
MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT THE
CONTRACTOR TO OVER-EXCAVATE AND BACKFILL WITH SUITABLE MATERIAL. 5.
THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER
TO ALLOW POSITIVE THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED
IN SUCH A MANNER TO ALLOW POSITIVE DRAINAGE TO MATCH
PRE-CONSTRUCTION CONDITIONS.
AutoCAD SHX Text
6" DEPTH OF 3/4" MINUS GRAVEL SURFACE COARSE COMPACTED TO 95% OF
MAX. DENSITY
AutoCAD SHX Text
BACKFILL MATERIAL SHALL CONTAIN NO ORGANIC MATTER AND SHALL BE 6"
DIAMETER OR LESS IN SIZE COMPACTED TO 95% WITHIN TRAFFIC AREAS AND
90% OUTSIDE OF TRAFFIC AREAS. EXCAVATED MATERIAL MAY BE USED AS
BACKFILL IF APPROVED BY THE ENGINEER.
AutoCAD SHX Text
PIPE BEDDING MATERIAL PLACED IN 6" LIFTS AND COMPACTED TO 95% OF
MAXIMUM DENSITY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: RIGID BOARD INSULATION JOINTS SHALL BE RIGID BOARD INSULATION
JOINTS SHALL BE LAPPED *H: ALSO REFERS TO CLEAR SPACING BETWEEN THE
PIPE AND OTHER DRAINAGE STRUCTURES OR THE WATER LINE.
AutoCAD SHX Text
4'0" OR GREATER NONE REQUIRED NONE REQUIRED 3'6" 1 INCH 1 INCH 3' 2
INCHES 2 INCHES 2'6"(MINIMUM) 4 INCHES 4 INCHES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLACE CONCRETE OR STACK BALLAST ROCKS OVER PIPE. BALLAST SECTION TO
BE A MINIMUM 1'x1'X2' LONG AND PLACED 10' O/C AND AT EVERY PIPE
JOINT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DOWN STREAM OF THE SAMPLING
PORTS. INSTALL SO FLOW METER HEADER IS ALWAYS FILLED WITH
WATER.
AutoCAD SHX Text
AutoCAD SHX Text