Public Participation Documentation - ERM · PDF fileAnnex C Public Participation Documentation...

Post on 08-Feb-2018

369 views 14 download

Transcript of Public Participation Documentation - ERM · PDF fileAnnex C Public Participation Documentation...

Annex C

Public Participation Documentation

Site Notices Background Information Document Adverts Notification to Stakeholders Attendance Registers Minutes of Meetings Comments and Responses Report

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C1

C1 SITE NOTICES

Site Notices were erected at the Mamathwane Compilation Yard site on the 18 October 2012.

Figure 1.1 Site Notice (English)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C2

Figure 1.2 Site Notice (Afrikaans)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C3

Figure 1.3 Site Notice (Setswana)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C4

Figure 1.4 Site Notice (Xhosa)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C5

Figure 1.5 Proof of Site Notices

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C6

C2 BACKGROUND INFORMATION DOCUMENTS (BIDS)

Figure 2.1 Background Information Document (BID) (English)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C7

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C8

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C9

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C10

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C11

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C12

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C13

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C14

Figure 2.2 Background Information Document (BID) (Afrikaans)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C15

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C16

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C17

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C18

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C19

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C20

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C21

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C22

Figure 2.3 Background Information Document (BID) (Setswana)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C23

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C24

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C25

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C26

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C27

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C28

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C29

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C30

Figure 2.4 Background Information Document (BID) (Xhosa)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C31

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C32

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C33

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C34

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C35

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C36

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C37

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C38

C3 ADVERTS

Figure 3.1 Advert (English)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C39

Figure 3.2 Advert (Afrikaans)

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C40

Figure 3.3 Proof of Advert in Die Burger Oos 15 October 2012

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C41

Figure 3.4 Proof of Advert Die Burger Wes 15 October 2012

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C42

Figure 3.5 Proof of Advert Kathu Gazette 6 October 2012

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C43

Figure 3.6 Proof of Advert Somerset Budget 4 October 2012

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C44

Figure 3.7 Proof of Advert Volksblad 4 October 2012

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C45

C4 NOTIFICATION TO STAKEHOLDERS

Figure 4.1 Notification Letter to Stakeholders (English) 2 October 2012

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C46

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C47

Figure 4.2 Notification Letter to Stakeholders (Afrikaans) 2 October 2012

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C48

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C49

C4.1 PROOF OF EMAIL

From: Tougheeda Aspeling on behalf of ERM Southern Africa Project TransnetTo: Tougheeda Aspeling; Nestus BredenhannBcc: "NZalk@thedti.gov.za"; "nnkosi@environment.gov.za"; "Mahlalela@dot.gov.za"; "phenyam@dot.gov.za";

"MGALIMBERTI@sahra.org.za"; "KSMUTS@sahra.org.za"; "ratha.timothy@gmail.com";"smokhanya@ecphra.org.za"; "Eurika.sekhu@dpw.gov.za"; "mabokoi@dwa.gov.za"; "dg@daff.gov.za";"dodg@daff.gov.za"; "schristians@ncpg.gov.za"; "nmaxongo@ecphra.org.za";"dvanheerden@ncpg.gov.za"; "judischoltz@ncpg.gov.za"; "dmoleko@half.ncape.gov.za";"tperkins@grand.ncape.gov.za"; "pmanankong@ncpg.gov.za"; "tperkins@grand.ncape.gov.za";"abrahamsa@dwa.gov.za"; "lefleurd@dwa.gov.za"; "streudersk@dwa.gov.za";"amdonald@environment.gov.za"; "northerncapeprovince@nda.org.za"; "pieter.swart@dmr.gov.za";"jwilson@ncpg.gov.za"; "dposthumus@ncpg.gov.za"; "ammoiemang@ncpg.gov.za";"nfourie@ds.ncape.gov.za"; "ncorns@ncpg.gov.za"; "lawrence.musisi@agr.ecprov.gov.za";"Alistair.McMaster@deaet.ecape.gov.za"; "mlzote@ecphra.org.za"; "Bulumko.nelana@deaet.ecape.gov.za";"glen.thomas@agr.ecprov.gov.za"; "Yvonne.Matsheketwa@agr.ecprov.gov.za";"angie.majongile@dot.ecprov.gov.za"; "Albert.mfenyana@deaet.ecape.gov.za";"dayalan.govender@deaet.ecape.gov.za"; "andries.struwig@deaet.ecape.gov.za"; "starkeya@dwa.gov.za";"malamlela.ndabankulu@agr.ecprov.gov.za"; "mm@mandelametro.gov.za"; "aarth@mandelametro.gov.za";"mayan.mangia@dpw.gov.za"; "Macjack@vodamail.co.za"; "simphiwe.nundze@lgnet.org.za";"segametsi.mocumi@fbdm.co.za"; "lucas.kenneth@fbdm.co.za"; "d.ngxanga@vodamail.com";"myawa@siyanda.gov.za"; "Bokgwathile@taologaetsewe.gov.za"; "swartj@taologaetsewe.gov.za";"tpillay@cacadu.co.za"; "hsikweza@cacadu.co.za"; "nnqwazi@chrishanidm.gov.za";"fnel@chrishanidm.gov.za"; "reneeb@srvm.gov.za"; "amberb@srvm.gov.za"; "laydz@cwithc.co.za";"suzettem@bcrm.gov.za"; "nomsa.ngcipe@lgnet.org.za"; "mncedim@webmail.co.za";"tantsi@mtnloaded.co.za"; "Lucille@iym.gov.za"; "noxonolonontyi@iym.gov.za";"visser@emthanjeni.co.za"; "tallies@emthanjeni.co.za"; "jjood@emthanjeni.co.za";"tmseengana@emthanjeni.co.za"; "lin@solplaatje.org.za"; "kwilliams@solplaatje.org.za";"vsettley@ncpg.gov.za"; "eilerd@dikgatlong.co.za"; "lucas.kenneth@fbdm.co.za";"jigazzz@dikgatlong.co.za"; "eddiemanuel@dikgatlong.co.za"; "mseele@dikgatlong.co.za";"Obakengjisaacs@webmail.co.za"; "Julies.theys@gmail.com"; "swami5353@gmail.com";"Leburudiemiso179@gmail.com"; "clementi@gamagara.co.za"; "pierreb@gamagara.co.za";"virginiam@gamagara.co.za"; "virginiam@gamagara.co.za"; "virginiam@gamagara.co.za";"srapelang15@gmail.com"; "bloomt@joemorolong.gov.za"; "fseleka@webmail.co.za";"lish.chimarenga@gmail.com"; "Mbela@umsobomvumun.co.za"; "manne@umsobomvumun.co.za";"mashilof@gmail.com"; "gladwin.nieuwenhuizen@lgnet.org.za"; "tanya@lgnet.org.za";"ntombi.baart@makana.gov.za"; "nongwe@makana.gov.za"; "mduplessis@wwf.org.za";"scharlton@wwf.org.za"; "wessanc@yahoo.com"; "mmkarchaeology@yahoo.co.uk";"mothago.letsoalo@sanparks.org"; "dekockr@nra.co.za"; "spothil@gmail.com"; "wessanc@yahoo.co.za";"christyb@ewt.org.za"; "ncagric@worldonline.co.za"; "J-Gon@intekom.co.za"; "mduplessis@wwf.org.za";"scharlton@wwf.org.za"; "gouwsj@nra.co.za"; "Sharlene.Matthews@agriec.co.za"; "dnaj@intekom.co.za";"joostecg@eskom.co.za"; "henk.landman@eskom.co.za"; "segomoco.scheppers@eskom.co.za";"vGenseAL@eskom.co.za"; "livhuwani.ndou@transnet.net"; "Frans.Strydom@transnet.net";"Cobus.Cloete@transnet.net"; "pumelela.mabeka@transnet.net"; "Mavin.Bana@transnet.net";"ronelvr@assmang.co.za"; "willemg@assmang.co.za"; "Andre.laurensford@gmail.com";"ronelvr@assmang.co.za"; "willemg@assmang.co.za"; "aprilbloom@gmail.com"; "aprilbloom@gmail.com";"heidi@helcon.co.za"; "katiedutoit@gmail.com"; "wretief@webmail.com"; "snaude@isat.com";"leon@r63.co.za"; "plscheepers@gmail.com"; "waterval@r63.co.za"; "info@kkhc.co.za"; "info@kkhc.co.za";"gerdie@koeihotel.co.za"; "gerdie@koeihotel.co.za"; "porker@telkomsa.net"; "porker@telkomsa.net";"jimmytruter@isat.co.za"; "Buckingham@absamail.co.za"; "engelbrechtfj@gmail.com";"Valentyn.maritz@gmail.com"; "hofmeyr@ovk.co.za"; "searest@vodamail.co.za"; "hilcol@intekom.co.za";"comleyfarm@telkomsa.net"; "nicoe@humkoop.co.za"; "malan@douglas.co.za"; "malan@douglas.co.za";"fairfield@hotmail.co.za"; "admin@grasslands.co.za"; "middlecote@xsinet.co.za";"wolwekop@adsactive.com"; "marlow@isat.co.za"; "Ane.Oosthuizen@nmmu.ac.za";"diosecpe@mweb.co.za"; "rhinosterhoek@agnet.co.za"; "southey@mweb.co.za";"stegmannpv@intekom.co.za"; "hlake@srcc.co.za"; "christt@vodamail.co.za"; "jimmytruter@isat.co.za";"conwwayclan@eik.co.za"; "jan@awardphoto.co.za"; "reubenvanheerden@mtnloaded.co.za";"Melster@telkomsa.net"; "Melster@telkomsa.net"; "gary.kirk@shell.com"; "jan@ngkok.co.za";"bsjkerk@srvalley.co.za"; "mortimer@ovk.co.za"; "slagboom@mweb.co.za"; "gers@netralink.com";"gers@netralink.com"; "nooigedachtfarm@gmail.com"; "charl@freshgrow.com";"nooitgedachtfarm@gmail.com"; "charl@freshgrow.com"; "hotazelsi@telkomsa.net"; "rnell@r63.co.za";"rilette.avenant-buys@arm.co.za"; "n1truck@yahoo.com"; "johann.brink@coega.co.za";"maloti@mtnloaded.co.za"; "rolandsiebrits@yahoo.com"; "pieter.dutoit@exaro.com";"easycopy@gmail.com"; "sifiso@coreinfratechnologies.co.za"; "eastlwhs@iafrica.com";"742@ancpco.org.za"; "e.schoeman@gwk.co.za"; "mirinda@telkomsa.net"; "vicsmba@xsinet.co.za";"kaldc@mweb.co.za"; "info@taologaetsewe.gov.za"; "louisvdm@telkomsa.net"; "watson@r63.co.za";"Handel.goldenvalley@bkb.co.za"; "Gunther.strauss@shamwari.com"; "bonolol@brmo.co.za";"sekretaris@agrikur.co.za"; "fufe.makatong@gmail.com"; "johannb@gamagara.co.za";"elmal@gamagara.co.za"; "mdzivhani@ppc.co.za"; "fakeerr@dwa.gov.za"; "obakeny.kepron@yahoo.com";"gert.klopper@debeersgroup.com"; "pmongwato@ppc.co.za"

Subject: 0172056 / Proposed expansion of Transnet’s existing manganese ore railway line and associatedinfrastructure

Date: 09 November 2012 11:43:00 AMAttachments: 0172056 Transnet_comment and reply sheet.pdf

0172056 Transnet_DSR Letter Afr_FINAL.pdf0172056 Transnet_ DSR Letter Eng_FINAL.pdf

Dear Sir/Madam

PROPONENT: Transnet Kindly find attached announcement letter for the Draft Scoping, Basic Assessment andAmendment Reports for the proposed expansion of Transnet’s existing manganese ore railwayline and associated infrastructure.This letter includes information about availability of the before mention ed reports andupcoming public meetings. Please do not hesitate to contact us should you require moreinformation. Best regards, Nestus Bredenhann Geagte Meneer/Mevrou Voorsteller: Transnet Let asseblief aangeheg die aankondiging brief vir die Konsep Omvangbepalings, Konsep BasieseInvloedbepalings -en Wysigingsverslae vir die voorgestelde uitbreiding van Transnet sebestaande spoorlyn vir die uitvoer van mangaanerts en verwante infrastruktuur. Hierdie briefbevat inligting oor beskikbaarheid van die voorafgenoemde verslae en opkomende openbarevergaderings. Moet asb. nie huiwer om ons te skakel sou u enige verdere inligting benodig. Beste groete, Nestus Bredenhann ThanksNestus

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C50

C4.2 PROOF OF POSTAGE

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C51

Figure 4.3 Registration and Comment Sheet

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C52

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C53

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C54

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C55

C5 ATTENDANCE REGISTERS

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C56

C6 MINUTES OF MEETINGS

Meeting minutes

Subject/Ref

Transnet Railway Expansion Project- Mamatwane Compilation Yard

Venue

Kalahari Country Club– Public Meeting

Date of Meeting

05 December 2012

Present

See attendance register attached

Issues Raised Responses Is the construction phase water driven? Water is required for the construction phase as well as for dust

management. Transnet is currently sourcing options for water abstraction including sourcing water from surrounding mines, municipality and private water use rights.

Why would an oil water separator be necessary? An oil water separator will be installed within the truck workshop and refuelling area. The oil water separator is expected to be approximately four m3. This area will be bunded and waste collected by the oil water separator will be removed by a licenced hazardous waste removal company.

How many people will be employed during the construction and operational phase?

220km of rail will need to be built and this will take approximately 2 years. Approximately 200 people will be employed during this time. During the operational phase, there will be 60 people employed during a 24 hour cycle i.e. 30 people in the day and 30 people at night.

Where will the workers live? As this moment there is uncertainty regarding the exact location of the operational phase employees. However, Transnet is leaning towards constructing houses within the existing surrounding towns but this will be confirmed at a later stage and requires a different process.

What type of noise impacts can be expected? A noise specialist study will be conducted during the EIA phase and these results will be included in the Draft EIA.

Some of the positive impacts of the project includes decreased number of trucks on the road, positive impact on the local economy, job creation as well as further access and opportunities to small miners. Additionally, the rail acts as an important strategic link mines and the harbour.

Noted. These positive impacts have been included in the BAR.

What happens at the balloon loop? The balloon loop will be used as a stock pile area for smaller mines. Will there be any dust impact associated with the project?

Yes, the dust impact will be further investigated in the EIA phase, however, the Mangenese Ore will be sprayed before transport.

Will construction camps be built? No construction/ worker camps will be built. Local workers will be used.

Will the on-site substation be used? Yes, Transnet currently has an agreement with Eskom to ensure dedicated supply.

When will construction begin? Construction is expected to start in 2014 and end in 2016.

Meeting minutes

Subject/Ref

Transnet Railway Expansion Project

Venue

Kalahari Country Club– Landowner Focus Group Meeting

Date of Meeting

05 December 2012

Present

See attendance register attached

Issues Raised Responses Is another line going to be built? Another line will not be built. Loops will be constructed at certain

sections along the line, to increase the overall capacity of the line. Where exactly will the loops be placed? Maps were shown to the landowner indicating the exact positioning

of the loop (These maps are included as Annex xxx ) With the current loop positioning, there is a piece of land that is cornered in, in which I am unable to do anything with.

Currently, Transnet and the landowner are negotiating the purchase of that cornered piece of land.

As part of the project, will any depots/ houses be constructed as I am concerned that the Transnet workers will fraternize with my workers and that their will an increase in crime?

There will not be any worker camps during the construction phase, as local workers will be employed and they will go home at the end of each day. However, there is currently an option of building a depot at Wincaton for the operational phase.

What about the veld fires? During the construction phase, there will be shields and fire extinguishers present on site in the case of a fire. Additionally, certain potentially fire causing machinery will not be operated if the wind is too strong to help prevent veld fires. It is also highly unlikely that veld fires will occur during normal operations, but they could occur during maintenance periods. If a veld fire does occur, this will be dealt with on a case by case basis.

I am concerned that gates will not be locked during the construction phase.

The locking of farm gates will be written in the construction phase EMP. Additionally, a grievance procedure will be in place during the construction phase.

ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED

C57

C7 COMMENTS AND RESPONSES REPORT

Com

men

ts/Is

sues

and

Sug

gest

ions

R

aise

dC

omm

enta

tor

Org

anis

atio

nD

ate

Sour

ceR

espo

nse

Cat

egor

y

1 2 3 4 5 6 7

Com

men

t and

Res

pons

e R

epor

t - C

ompi

latio

n Ya

rd, N

orth

ern

Cap

e

8 9 10 11 12 13 14