PROPOSED STORM SEWER MANHOLES PROPOSED STORM … · proposed storm sewer manholes no. top. el. (m)...

Post on 23-Aug-2020

1 views 0 download

Transcript of PROPOSED STORM SEWER MANHOLES PROPOSED STORM … · proposed storm sewer manholes no. top. el. (m)...

1

2

3

4

5

6

7

8

9

10

1

1

1

2

3

4

5

6

7

8

9

1

0

1

1

LO

AD

IN

G A

RE

A

4.0m

(w

)x 13.0m

(l) x 7.5m

(h)

D

N

D

N

D

N

D

N

PROPOSED

ELECTRICAL

PAD

TRANSFORMER

LAN

DSC

APE

BU

FFER

SECURITYGATE

STORM TANK

SERVICE ROOM

EX.

58.5

m-1

200m

STM

@0.

50%

EX.

28.5

m-1

050m

STM

@0.

50%

EX.

70.5

m-1

050m

STM

@0.

50%

EX.

200m

SA

NEX

. 36

.5M

-200

mm

Ø S

AN

@2.

2%EX

. 71

.5m

-250

mm

Ø S

AN

@1%

EX.

300m

WM

EX.

300m

WM

EX.

300m

WM

EX.

200m

WM

EX. 300mmØ PVC-WM

EX. 48.5m-250mmØ PVC SAN@2.20% EX. 46.3m-250mmØ PVC SAN@1.60% EX.12.8m-250mmØSAN

EX. 2

00m

-STM

EX. 3

00m

-WM

MH137MH136 MH328

MH1

35

PROP. 69.9m-750mmØ CONC.

STM@1.0%

PROP. 108.9m-750mmØ CONC. STM@1.0%

PROP. 300mmØ PVC-WMz

EX. 5

2.0m

-600

mm

Ø S

TM T

O B

E RE

PLA

CED

WITH

750

mm

Ø C

ON

C. @

3.1%

EX. 4

8.0m

-600

mm

Ø S

TM T

O B

ERE

PLA

CED

WITH

900

mm

Ø C

ON

C. @

1.0%

EXTE

RNA

L FL

OW

FRO

M B

ROA

DW

AY

ST. T

O R

AIL

WA

Y D

ITCH

A=2

.83

haC

=0.4

5Q

10=3

51.3

l/s

T C=1

6.33

min

EXTE

RNA

L FL

OW

FRO

MRA

ILLW

AY

DITC

HES

A=0

.435

haC

=0.4

1Q 1

00=6

6.9

l/sT C

=15.

0 m

in

EXTE

RNA

L FL

OW

FRO

M

QUE

EN S

T. &

THO

MA

S ST

.

A=4

.49

haC

=0.6

0Q 1

0=69

9.0

l/sT C

=16.

54 m

in

EX. 4

50m

STM

TAN

NER

Y ST

.

RUTLEDGE RD.

CANADIAN PACIFIC RAILWAY

BROADWAY ST.

EXTENSION OF EMBY DR.

PRO

P. 1

3.2m

-300

mm

ØPV

C S

TM@

1.0%

REGIONAL FLOODLINE

BROADWAY ST.

2.0m WALKWAY2.0m BOULEVARD

2.0m WALKWAY

PROPOSED 150Ø&100Ø V & B

EX. 100MMØWMTO BE REMOVED

PROPOSED CHECK VALVEIN CHAMBER

EX. 1

0M-1

200M

STM

@0.

50%

EX. 6

.8M

-105

0mm

ØST

M@

0.50

%

EX. 825mmØCULVERT

EX. 360mmØ

CULVERT TO BE REMOVED

PROP. 29.8m-250mmØ PVCSAN@1.0%

PROPOSED 150mmØPVC WATER SERVICE

PROPOSED FIREHYDRANT

PROP. 5.0m-150mmØ PVC @2%SAN SERVICE CONNECTION

PROP. 13.0m-375mmØ PVC @1.0%STM SERVICE CONNECTION

PROPOSED FIRE

HYDRANTPROPOSED FIRE

HYDRANT

EX. 5

2.0m

-600

mm

Ø S

TM

TO B

E RE

PLA

CED

PROP. 12.5M-750mmØCONC. STM@1.0%

LIMIT OF

DEVELOPMENT

NEW PROPERTYLINE

EX. OUTFALL TO BEREPLACED(OPSD 804.030)

PROPOSED CONCRETE CRASH WALL(DESIGNED BY OTHERS)

TOE OF BERM

PROP. 10.3m-600mmØCONC. STM@1.5%

EXISTING DITCH

EX. D

CBM

H TO

BE

REPL

AC

ED

EMBY DR.

MULLET CREEK

THO

MA

S ST

.

BUILDING "C"

BUILDING "B"

BUILDING "A"

BUILDING "G"

BUILDING "F"

BUILDING "E"

BUIL

DIN

G "D

"

EXISTING STAIRNO.2

6.0m

FIR

E RO

UTE

FOR

EMER

GEN

CY

AC

CES

S O

NLY

(PER

VIO

US S

TABL

E SU

RFA

CE)

ESTIM

ATE

D 3

m R

OA

DW

IDEN

ING

MET

AL

SID

DED

CO

MER

CIA

L BU

ILDIN

G #

44

TO R

EMA

IN

CO

NC

RETE

BLO

CK

IND

USTR

IAL

BUILD

ING

#10

0

TO R

EMA

IN

CO

NC

RETE

BLO

CK

CO

MER

CIA

L BU

ILDIN

G #

56

TO R

EMA

IN

CB3

CB4

MH3

CBMH1

CB5

MH2A

MH1A

EX. DCBMH1

EX. D

CBM

H2

MH2

PROPOSED 100mmØPVC DOMESTIC WATER

PROPOSED STMCTRL MH

PROP. 7.5m-300mmØPVC. STM@1.0%

PROP. 6.8m-375mmØPVC. STM@1.0%

EX. CB TOBE REMOVED

EX. CB TOBE REMOVED

PROP.OGS

PROP. 7.3m-250mmØPVC. STM@1.0%

DICB1

CB2

CB1

PROP. 7.2m-300mmØPVC. STM@1.0%

PROP. 6.1m-250mmØPVC. STM@2.0%

PROP. 10.7m-300mmØPVC. STM@1.0%

OUTLET OF THE STMPIPING FROM U/G

PARKING TO OGS UNIT

INLET TO THESWM STORAGE

IN U/G PARKING

MH1

DICB2

EX. CULVERT TO BEREMOVED

CV

C M

ULLE

T C

REEK

CRO

SS S

ECTIO

N 6

+210

REG

ION

AL

WA

TER

LEV

EL: 1

54.9

0mCV

C M

ULLE

T C

REEK

CRO

SS S

ECTIO

N 6

+210

REG

ION

AL

WA

TER

LEV

EL: 1

55.6

0m

CV

C M

ULLE

T C

REEK

CRO

SS S

ECTIO

N 6

+210

REG

ION

AL

WA

TER

LEV

EL: 1

56.2

4m

6.0m FIRE ROUTE FOR

EMERGENCY ACCESS ONLY

(PERVIOUS STABLE SURFACE)

PROP. RIP RAPPROTECTION

(OPSD 810.010)

EX. DCBMH TO BEREPLACED

PROP. SWALE

PROPOSED FIRE

HYDRANT

MH4

PROP. DICB WITHRIP-RAP PROTECTION(OPSD 810.020)

PROPOSED GREENTERRAMESH WALL(DESIGNED BY OTHERS)

PROPOSED ENGINEEREDDERAILMENT BERM

(DESIGNED BY OTHERS)(COMPACTED MATERIALS)

EX. BELL CABLE

TO BE REMOVED

FUTUREPROPERTY LINE

EX. PROPERTY LINE

EX. PROPERTY LINE

FUTURE PROPERTY LINE

INV.: 154.51INV.: 154.06

PROPOSED STORM SEWER MANHOLES

NO. TOP. EL. (m) INVERT (m)OPSD NUMBERN E W S

MH1MH2MH3MH4OGS

PROPOSED SANITARY MANHOLES

NO TOP EL. (m) INVERT (m)REGIONAL STANDARDN E W S

MH1AMH2A

PROPOSED STORM CATCHBASIN

NO. TOP. EL. (m) INVERT (m)OPSD NUMBERN E W S

CB1CB2CB3CB4CB5

DICB1DICB2CBMH1

EX. DCBMH1EX. DCBMH2

OUTFALL

LEGENDEXISTING STORM MANHOLE

EXISTING FIRE HYDRANT

EXISTING WATER VALVE

C-101

PRELIMINARY SITE SERVICING PLAN

EXISTING SANITARY MANHOLE

EXISTING CATCHBASIN

EXISTING LIGHT STANDARD

EXISTING STORM SEWER

EXISTING SANITARY SEWER

EXISTING WATER MAIN

PROPERTY LINE

EXISTING TREE

EXISTING GAS METER

EXISTING FENCE

LEA Consulting Ltd.Consulting Engineers

and Planners

www.LEA.ca

625 Cochrane Drive, Suite 900

Markham, Ontario

L3R 9R9, Canada

Tel: (905)470-0015. Fax: (905)470-0030

CITY OF MISSISSAUGA

REGIONAL MUNICIPALITY OF PEEL

51-57 TANNERY STREET DEVELOPMENT

SITE

LOCATION

FILE No.: OZ 18-12

EXISTING HYDROPOLE/LIGHT STANDARD

EXISTING HYDROPOLE

EXISTING BOLLARD

EXISTING CURB STOP

EXISTING MONITORING WELL

EX. OVERHEAD WIRES

EXISTING BELL CABLE

EXISTING SIGN

REGIONAL FLOOD LINE(FROM MULLET CREEK FLOOD RISK MAP)

NEW PROPERTY LINE

PROPOSED STORM SEWER

PROPOSED SANITARY SEWER

PROPOSED WATER MAIN

PROPOSED STORM MANHOLE

PROPOSED SANITARY MANHOLE

PROPOSED CATCHBASIN

1. ELEVATIONS ARE REFERRED TO THE CITY OF MISSISSAUGA BENCHMARK NO. 63-4, LOCATED ONTHE NORTH FACE AT THE CORNER OF THE KENDELLHURST ACADEMY ON THE NORTHEAST SIDEOF QUEEN STREET, OPPOSITE TANNERY STREET AND 28M NORTH OF MAIDEN LANE, HAVING APUBLISHED ELEVATION OF 163.543 METRES.

2. ALL EXISTING UTILITIES WITHIN THE MAIN PROPERTY LINE INCLUDING CATCH BASINS, LIGHTSTANDARDS, HYDRO POLES, OVERHEAD WIRES, GAS METERS AND FENCES TO BE REMOVED.

3. REFER TO DRAWING C-103 TO C-106 FOR SITE CROSS SECTIONS.

4. REFER TO DWG. C-107 FOR GENERAL NOTES.

NOTES:

PROPOSED FIRE HYDRANT

ISSUED FOR ZBA1 2018/06/08

PROPOSED AREA DRAIN

ISSUED FOR ZBA RESUBMISSION2 2019/06/27

EXISTING GAS MAIN

PROP. TREE