PROPOSED CONSTRUCTION
PHASING
ABUTMENT
BUILD UP TO FUTURE
DETOUR
INTERCHANGE
TO MISSILE
LINCOLNWAY
TO FUTURE BRIDGE
ABUTMENT TO CONNECT
BUILD UP TO PROPOSED
MOVEMENT
TO MAINTAIN SB TO WB
TEMPORARY PAVEMENT
RAMP
NB TO EB DIRECTIONAL
TO NB LOOP RAMP AND
BETWEEN EXISTING EB
BUILD FLYOVER BRIDGE
Lincolnway Service Interchange
Project A: EB to NB Connector with
I-80
I-25
US-30/LIN
COLN W
AY
I-25
UPRR
UPRR
BNSF
BN
SF
0' 2000'500' 1000'
I-80
Printed on 8/13/2019
REMOVAL
STAGE 1
STAGE 2
BRIDGE
TEMPORARY TIE-IN
LEGEND
PROPOSED CONSTRUCTION
PHASING
PERMANENT TIE-IN
PERMANENT TIE-IN
PERMANENT TIE-IN
PERMANENT TIE-IN
PERMANENT TIE-IN
NEW NB BRIDGE
SB BRIDGE TO BUILD
DEMOLISH EXISTING
THIS PROJECT
RAMPS DURING FIRST YEAR OF
CONSTRUCTION FOR EXISTING
LEAVE GAP IN ROADWAY
DIRECTIONAL RAMP
PRIOR TO SB TO WB
RAMP NEEDS TO BE BUILT
WB TO SB CONNECTOR
NEW NB BRIDGE
SB BRIDGE TO BUILD
DEMOLISH EXISTING
AREA
THROUGH FUTURE GORE
BUILD PERMANENT TIE-IN
AREA
THROUGH FUTURE GORE
BUILD PERMANENT TIE-IN
Connector
Project B: I-25 Shift and WB to SB
I-80
I-25
US-30/LIN
COLN W
AY
I-25
UPRR
UPRR
BNSF
BN
SF
0' 2000'500' 1000'
I-80
Printed on 8/13/2019
BRIDGE
STAGE 3
STAGE 2
STAGE 1
REMOVAL
PRIOR PHASES
LEGEND
TEMPORARY TIE-IN
PROPOSED CONSTRUCTION
PHASING
PERMANENT TIE-IN
PERMANENT TIE-IN
PERMANENT TIE-IN
WB BRIDGE
WB BRIDGE TO BUILD PROPOSED
DEMOLISH PORTION OF EXISTING
PERMANENT TIE-IN
PERMANENT TIE-IN
AUXILIARY LANE
SECTION WITH
ULTIMATE MAINLINE
PERMANENT TIE-IN
MAINLINE ROADWAY
UNDERCROSSING WITH
INSTALL CULVERT
Project C: I-80 Realignment
I-80
I-25
US-30/LIN
COLN W
AY
I-25
UPRR
UPRR
BNSF
BN
SF
0' 2000'500' 1000'
I-80
Printed on 8/13/2019
TEMPORARY TIE-IN
BRIDGE
STAGE 2
STAGE 1
REMOVAL
PRIOR PHASES
LEGEND