Proposal of RP Control Area adapted to the evacuation campaign of radioactive waste from CERN...

Post on 27-Dec-2015

212 views 0 download

Tags:

Transcript of Proposal of RP Control Area adapted to the evacuation campaign of radioactive waste from CERN...

Proposal of RP Control Area adapted to the evacuation campaign of radioactive waste from CERN radioactive storageYann PIRA, Chris THEIS, Kurt WEISS

19/05/15, ATS-RC-WG

Requirements

• Proximity of the radioactive storages : ALARA, Minimize distances and time spent for transport,

• Proximity of the daily actors : GS, RP,

• A place with the lowest radioactive background,

• A closed, safe area, and sheltered from bad weather conditions,

• Wifi or internet access for TREC registeration,

Proposal : Shelter 951

Proposal : Shelter 951

• Sheltered place.

• Closed area.

• Concrete slab : easy to develop (steel plate on groundfloor, concrete shielding blocks).

Proposal : Shelter 951

• Available space of about 100m2 by removing 10 electrical transformers.

Proposal : Shelter 951

• Low and relatively stable radiation background measured on the groundfloor : 13/05/15 : between 20 to 30 c/s with BGO probe (sunny weather

condition + MD : no beams in north arera). 18/05/15 : between 25 to 35 c/s with BGO probe (sunny weather

condition + Proton beam in north area).

• Good measurement conditions for RP.

20

30

40

50

60

70

80

90

100

110

20 30 40 50 60 70 80 90 100 110

Com

ptag

e br

ut B

GO

en

[c/s

]

Comptage du Bdf BGO en [c/s]

Seuil de décision et Limite de détection BGO : tmes = tBdf = 20 sec

Seuil de décision [c/s]

Limite de détection [c/s]

Proposal Shelter 951 : conclusion

Pros :

• Proximity of the radioactive storages : ALARA, Minimize distances and time spent for transport,

• Proximity of the daily actors : GS, RP,

• Low and relatively stable radioactive background,

• Partially sheltered and close area.

Cons :

• Removal of a certain number of items stored at this place.

To be improved :

• Improve the sheltering of the area (protective wall, additionnal tent?),

• Improve RP measuring conditions (additional shielding : shielding blocks, steel plates on the floor)

• Wifi/Internet for TREC works