Post on 03-Jul-2020
New Ringgold Middle School
Project SlideshowFebruary 4, 2017
Aerial Photo Approaching from North
Provided by Hudson Group – Taken 2.4.2017
Aerial Photo from Northeast
Provided by Hudson Group – Taken 2.4.2017
Aerial Photo from East
Provided by Hudson Group – Taken 2.4.2017
Aerial Photo from West
Provided by Hudson Group – Taken 2.4.2017
Aerial Photo from Northwest
Provided by Hudson Group – Taken 2.4.2017
Masonry Installation – Kitchen - Area A
Brick Installation – Area A
Brick Installation – Area A
Storefront Framing between Kitchen & Cafeteria – Area A
Bulkhead Framing - Kitchen – Area A
Work Progress – 1st Floor - Area A
Stud Wall Framing - 2nd Floor – Area A
Stud Wall Framing - 2nd Floor – Area A
Stud Wall Framing - 2nd Floor – Area A
Stud Wall Framing - 2nd Floor – Area A
Brick Installation – 2nd Floor – Area A
Stair 4 Installation – Area A
Stair 4 Installation – Area A
Work Progress – 2nd Floor – Area A
Masonry Installation – 2nd Floor- Area B
Masonry Installation – 2nd Floor- Area B
Brick Installation – 2nd Floor- Area B
Work Progress – 2nd Floor - Area B
Masonry Installation – 2nd Floor – Area C
Grouting Masonry Walls – 2nd Floor – Area C
Work Progress – 2nd Floor - Area C
Masonry Installation - Area D
Steel Erection – Auditorium - Area D
Steel Erection – Auditorium - Area D
Provided by Hudson Group – Taken 2.4.2017
Work Progress – Area D
Steel Detailing – Cafeteria - Area A
Steel Detailing – Gym - Area D
Roof Decking – Area A
Bar Joist Installation – Area A
Roof Installation – Above Mech. Room – Area A
Roof Progress
Brick Installation – Fitness Center
Roof Decking – Fitness Center
Additional Storm Water Control Measures
Electrical Rough In – Metal Framing – Area A
Electrical Rough In – Masonry Walls – Area B
Pulling Wire – 1st Floor - Area B
Plumbing Rough In – Area A
Area Drain Installation - Courtyard
HVAC Piping Installation – Area A
HVAC Piping Installation – Area A
HVAC Piping Installation – Areas B & C
HVAC Piping Installation – Areas B & C
Sprinkler Piping Installation – Area A
• Finish Masonry Installation – Areas A• Continue Masonry Installation – 2nd Floor – Areas B & C• Continue Masonry Installation – Area D• Continue Brick Installation – Area B• Continue Plumbing & Electrical Wall Rough In• Roof Decking – Cafeteria – Area A, Gym – Area D & Fitness Center• Continue Steel Erection – Area D• Long Span Joist Installation – Auditorium – Area D• Roofing – Area A & Fitness Center• Continue Stud Wall Installation• Continue Door Frame Installation• Set Transformer & Installation of Permanent Power• HVAC Piping Installation – 1st Floor - Areas A, B, & C• Start HVAC Ductwork Installation• Sprinkler Piping Installation – Area A
Scheduled Work for Next Few Weeks
The End