Project Seventh of Portfolio

Post on 16-Mar-2016

213 views 0 download

Tags:

description

Project Seventh of Portfolio

Transcript of Project Seventh of Portfolio

p r e - f a b. s c h oo l;

interior view

interior view

site plansketch of site plan

northwest perspective

project descriptionThe pre-fab. school is the second stage of the tent school at Jordan. This school is made of more durable material to o�er more protection tochildren attending to this school. This project is composed with everything that is needed in case of any emergency.

l; j o r d a n

interior viewinterior view

northwest perspective northeast perspective

sketch of items include in the school

interior view

interior view southeast perspective

east elevation

west elevationt