Project: MIA - Supply and Installation of IP CCTV System (RFQ-222)
Subject: Tender Clarification No.1
Q1. If it is possible to provide the layout drawing of existing cameras and its schematic, as it will facilitate for
design and work-out the appropriated solution.
A1. Due to security reason, we will not provide the floor plans/layout drawing of existing cameras during the
tendering stage.
Q2. Requesting all the floor plans with IDF room, closet room, server room and operation room location?
A2: Please refer to the enclosed drawings (attachment 1) for reference.
Q3. If camera end require additional power socket, then power is provided by which parties?
A3. The power of the IP Cameras shall be provided by Power Over Ethernet (POE). If the camera end require
additional power, the power should be provided by the existing camera power source or new power
source created by the Contractor.
Q4. Which area require microphone?
A4. According to tender document Section 5 Clause 3.10, all Cameras shall be audio ready (Audio interface:
1 x mono line in, 1 x mono line out). Users can select to enable/disable this function according the
operational requirement.
Q5. How about the coming maintenance service for existing Bosch IP CAM (need include in the quotation)?
A5. The Contractor should consider the method for the existing Bosch IP CAM to have proper operation after
integration.
Q6. Please confirm all containment and cables are new installation. Please confirm whether existing trunking
can be reused.
A6. The existing containment and trunking can be reused but the Contractor should make new if required. All
cables (except the backbone fiber from IDF to Server Room) should be new installation by the
Contractor.
Q7. Please provide the specification about the New Main CCTV Room.
A7. The specification of the room is as following:
Room area (m2): 101.94
No of Occupants: 5
2/2
Floors: 600x600mm high pressure laminated raised floor
Skirting: ---
Walls: Emulsion paint on 6mm thk. Internal plaster up to false ceiling/full height
Ceiling: 600x600mm acoustic ceiling tile with exposed grid".
False Ceiling Height from A.F.F.L.: 3.70m
-End-
�&�'����� �� (��� �� &���� ��� �� ���� )����* �� ��*�����
'� 456 789:
; 9 <;; 4; =; >;; 9;; ?
@�A� B < B <4 9;;
�I6D �FF�E�@J �J��#JEA" ���!�� A��� �"��# 6D ��" 6D
������� �� %�6�D &�*����*
6D ��"
6 K;; ?
��� � �� ���6 >4; ?=>
<K 4> * A��J!#
4> * A��J!#
��&
8;; ?
4LK9 ?M
48=; ?M
6 44L; ?D K;; ?6 4=>; ?D K;; ?
L A��J!#
K A��J!#
K; ?
K; ?
> A��J!#
> A��J!#
M���� #!��"��" @EAE� @E"������� B 6D <K B >>4 ? N�E? �� <K
6D => B >;K ? N�E? �� =>
�6D �
<
�6D�
6D =>
��&�� � �����
��C� ( ��C� � ��C�
6D <K
������� �
4;<94;O94;O9
49=;498;498;
=<;;=<K;=<K;
��C� *�
���*�H��
'�H��
(�� ������ � 6��(
6D H �6D K; � 6D H �6D K; ?
� *
�)
�&)
�)
�&)
''
''
����
)
( �)
�&)�&)
''
�)�
�
�)
�&)
�)H�&)
�=
����
� �&&I
� �
�6D �4
�)
�)
(�� ������
�6
�
�
�
-
R
����
��##��������?���A
*�����A�S��!�E��������
� ��
� ��
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
�
� �
� �
� ��
� ��� �
� ��� ��
� �� ��
� � ��
� �� ��
� �� ��
� �� ��
� �� �
� ��
� ��
� ��
� ��
� �
� �
� �
�
� �
� ��
� ��
� ��
� ��
� ��
�������������
����
������
����
����
�� ����
�����
!���
"��������������!���
#� $��� ���%
���� � � �#�
����#&���$#���
'��
����
�(��
�#�
���%
���
�#� $��� ���%
'��
����
)��
�����
��(
�� �#
���
� ��
����
��
�#� �#� �#*��
� � �� ��� �� �� ��� �
�B��� C � C ����
D"'"A
�E�E��� ���A ���F&�G D'����FH�IDA' �I��I�E"��I ���� E&GIH�E"��I ���� E&G
"D"M��I� �""�
M�E �Q& J��K
T/A
T/B
T/A
TO CONTROL TOWERIDF-RADAR WORKSHOP(ROOM 37018)
×1
×28
×4
NOTE:
T/B
T/A
T/B
NOTE:
NEW COMPUTERROOM
設計
校對
審核
審定
專業負責人
工程負責人
設計編號
版 次
圖紙名稱
圖號
日期比例
2
階段
工程名稱
項目名稱
DETAIL DESIGN
A3
A/S@A3 2013.07.22
100mmX100mmTrunking
Riser
FB Fiber CableD Data cable
T/A To Above
T/B To Below
Legend:
25mm G.I.Conduit
20mm G.I.Conduit
75X75Junction Box
DATA OUTLET
TELPHONE OUTLET
ACCESS POINT OUTLET
139-SCS-401
×38
×11
×22
CAT6 UTP CABLE
×
×
NOTE: RED FONTPTB-Arrival-RMXXXX-APXXXAP NAME
設計
校對
審核
審定
專業負責人
工程負責人
設計編號
版 次
圖紙名稱
圖號
日期比例
2
階段
工程名稱
項目名稱
DETAIL DESIGN
A3
A/S@A3 2013.07.22
100mmX100mmTrunking
Riser
FB Fiber CableD Data cable
T/A To Above
T/B To Below
Legend:
25mm G.I.Conduit
20mm G.I.Conduit
75X75Junction Box
DATA OUTLET
TELPHONE OUTLET
ACCESS POINT OUTLET
139-SCS-402
200mmX200mmTrunking
NOTE: RED FONTPTB-Departure-RMXXXX-APXXXAP NAME
MEZZANINE LEVEL
設計
校對
審核
審定
專業負責人
工程負責人
設計編號
版 次
圖紙名稱
圖號
日期比例
2
階段
工程名稱
項目名稱
DETAIL DESIGN
A3
A/S@A3 2013.07.22
100mmX100mm Trunking
Riser
FB Fiber CableD Data cable
T/A To Above
T/B To Below
Legend:
25mm G.I. Conduit
20mm G.I. Conduit
75X75 Junction Box
DATA OUTLET
TELPHONE OUTLET
ACCESS POINT OUTLET
139-SCS-403
×10
×52
×52NOTE: RED FONT
PTB-Mezzanine-RMXXXX-APXXXAP NAME