Process and Energy Audits at Water and Wastewater Facilities

Post on 26-Dec-2021

2 views 0 download

Transcript of Process and Energy Audits at Water and Wastewater Facilities

Process and Energy Audits at Water and Wastewater Facilities Thomas Devine, CAP, CEM, LEED AP | April 25 2012

Process and Energy Audits at Water and Wastewater Facilities

Presentation Outline

• Types of Audits • Benchmarking • Submetering • Data Collection/Information Gathering • Typical Energy Saving Measures • Renewable Energy • Measurement and Verification • Funding

When should you conduct an energy audit?

Process and Energy Audits at Water and Wastewater Facilities

Before a Major Upgrade

• Anytime • Before a Major Upgrade • If Funding becomes available • After conducting a benchmarking analysis that results in a poor score

Types of Energy Audits

Process and Energy Audits at Water and Wastewater Facilities

Walk Through Audits (Level I)

DURATION: Walk through of the facility (1-2 hours) PRODUCT: Suggestions for low cost improvements to lights / HVAC – few if any calculations and/or quantified payback projections. RESULTS: Quick payback projects that take advantage of utility rebates. Identify potential energy saving items that would require additional analysis. COSTS: Very low cost, sometimes free.

Process and Energy Audits at Water and Wastewater Facilities

Energy Survey and Analysis (Level II)

DURATION: Several hours on site, plus time to review energy bills, etc. PRODUCT: Suggestions for low cost improvements to lights / HVAC and equipment upgrades in existing processes (VFDs, Premium Efficient Motors). Calculations of energy savings and rough estimates of upgrade costs to determine simple payback period. RESULTS: Quick payback projects that take advantage of utility rebates. COSTS: $10K - $20k, depends on size of facility, scope to be analyzed.

Presenter
Presentation Notes
These audits typically do an energy survey and analysis. The auditors spend several hours at the facility and additional time reviewing energy bills, etc. Auditors estimate power usage by equipment type but do not perform detailed analysis of equipment specifications and performance. The deliverable is typically for low cost improvements to lights/ HVAC and equipment upgrades in existing processes (e.g. VFDs, premium efficiency motors, etc.). Again, there is quick payback and the recommendations often take advantage of energy utility rebates. Costs of these audits are usually about $10,000 and there may be some cost share with energy providers. These audits usually do not cover any renewable energy evaluation or provide plant energy balance.

Process and Energy Audits at Water and Wastewater Facilities

Process Energy Audit (Level III)

DURATION: One or more days on site, time to analyze energy bills, develop pump curves, and possibly several weeks of data gathering and review PRODUCT: Energy use of existing processes compared to alternative processes

» Potential Design Modifications » Optimization of process controls

RESULTS: Detailed operational and process suggestions with both long and short term paybacks, some capital intensive projects that may require outside funding sources. Most likely to result in significant savings. COSTS: $10K - $100K depending on size of facility and scope of work.

Presenter
Presentation Notes
These are detailed process audits. It may take one or more days at the facility, time to analyze energy bills, develop pump curves, and possibly several weeks of data gathering. The audit includes: review of energy use and rates, energy balance, pump system evaluation, process system evaluation, etc. The deliverable highlights the energy use in existing processes and suggests alternative processes. Potential design modifications are usually recommended along with optimization of processes and equipment. These detailed operational and process suggestions have both short and long term paybacks. Most reports include cost benefit analysis of proposed projects. Some projects suggested are capital-intensive and may require the utility to secure additional funding to accomplish. These audits yield significant savings. Costs of these audits vary on plant size and can range from $8,000 to $60,000 and are sometimes compensated in part by the energy providers. The caveat for this cost share is the water utility need to demonstrate willingness/ ability to implement the recommended projects. These audits usually provide plant energy balance but may or may not include analysis of renewables.

Benchmarking

Process and Energy Audits at Water and Wastewater Facilities

Difference Between Benchmarking and Trending?

2

Process and Energy Audits at Water and Wastewater Facilities

Energy Benchmarking

Process and Energy Audits at Water and Wastewater Facilities

Benchmarking Tool

Process and Energy Audits at Water and Wastewater Facilities

Energy Benchmarking

• Banks / Financial Institutions • Courthouses • Hospitals • Hotels • K-12 Schools • Medical Offices • Offices • Dormitories • Retail Stores • Supermarkets • Warehouses

Process and Energy Audits at Water and Wastewater Facilities

Benchmarking Tool Inputs

• Electricity (kWhs) • Natural Gas (therms) • Fuel Oil #2 (gallons) • Propane (gallons)

Process and Energy Audits at Water and Wastewater Facilities

Benchmarking Tool Inputs

• Design Daily Influent Flow (mgd) • Average Daily Influent Flow (mgd) • Average Influent BOD (mg/L) • Average Effluent BOD (mg/L) • Does your plant have a fixed-film or trickling filtration process?

(yes =1 or no = 0) • Does your treatment include nutrient removal? (yes = 1 or no = 0)

Process and Energy Audits at Water and Wastewater Facilities

Benchmarking Scores

• >75 Great job • 65 -75 Energy Saving Opportunities exist, may require significant investment • <65 Energy Savings Opportunities exist! Many at no or low costs with quick

payback periods

Submetering

Process and Energy Audits at Water and Wastewater Facilities

Submetering

Primary Feed

Sub-Meter

Process

Sub-Meter Sub-Meter

Process

Process

Process and Energy Audits at Water and Wastewater Facilities

Developing a submetering plan

• How many submeters are required? • How can we electrically isolate equipment/ processes for metering? • How long should the sampling interval be? • How will data be collected? Data loggers vs. existing SCADA. • How often should data be collected? • Temporary or Permanent?

Process and Energy Audits at Water and Wastewater Facilities

Submeter locations

Location of power transducers on insulated conductors

Location of power transducers on insulated conductors

Location of power transducer on bus bars

Process and Energy Audits at Water and Wastewater Facilities

Submeter locations

Process and Energy Audits at Water and Wastewater Facilities

Energy Breakdown Example

Garage/Butler Building, 2%

Administration, 3% Screen & Grit,

4% Control Building

Transformer Feed, 5%

Sludge Pumping (MCCSLP), 5%

MCC INC, 8%

Space Heating Process

Buildings, 12%

Other - Not Characterized,

13%

Sludge Handling (MCCSH), 13%

Sewage Pumping

(MCCSEP), 17%

Plant Effluent Water Pumps,

18%

Process and Energy Audits at Water and Wastewater Facilities

Wire to Water

Correlate energy use with flow Wire-to-water Efficency Trend With Plant Size

1 2 3 4 5 6Annual Flow LOG(MG)

0

1

2

3

4

5

Annu

al W

ire-to

-wat

er E

ffice

ncy

LOG

(kW

h/M

G)

Village of Marcellus

Village of Clayton

,Village of Heuvelton

South & Center Sewer District

Town of Grand Island

Town of Bethlehem

Erie County Big Sister

Town of Orangetown

Saratoga Sewer District #1

Onondaga County

Small Plants 0.4 - 0.5 MGDSmall-Med Plants 2.0 - 3.5 MGDMedium Plants 4.9 - 7.5 MGDLarge Plants 10 - 80 MGDLOG(WTW) = 4.443349 - 0.378171 * LOG(MG)

Process and Energy Audits at Water and Wastewater Facilities

BOD Wire-to-process Efficency Trend With Plant Size

2.0 2.5 3.0 3.5 4.0 4.5Annual Flow LOG(MG)

-4.5

-4.0

-3.5

-3.0

-2.5

-2.0

-1.5

Annu

al B

OD

Wire

-to-P

roce

ss L

OG

(kW

h/LB

)

Village of MarcellusVillage of Clayton

,Village of Heuvelton

South & Center Sewer DistrictTown of Grand Island

Town of Bethlehem

Erie County Big Sister

Town of Orangetown

Saratoga Sewer District #1

Onondaga County

Small Plants 0.4 - 0.5 MGDSmall-Med Plants 2.0 - 3.5 MGDMedium Plants 4.9 - 7.5 MGDLarge Plants 10 - 80 MGDLOG(WTW) = 0.457107 - 1.091956 * LOG(MG)

Wire to Process

Correlate energy use with BOD removal

Process and Energy Audits at Water and Wastewater Facilities

TSS Wire-to-process Efficency Trend With Plant Size

2.0 2.5 3.0 3.5 4.0 4.5Annual Flow LOG(MG)

-6

-4

-2

0

Annu

al T

SS W

ire-to

-Pro

cess

LO

G(k

Wh/

LB)

Village of MarcellusVillage of Clayton

,Village of Heuvelton

South & Center Sewer DistrictTown of Grand Island

Town of BethlehemErie County Big Sister

Town of Orangetown

Saratoga Sewer District #1

Onondaga CountySmall Plants 0.4 - 0.5 MGDSmall-Med Plants 2.0 - 3.5 MGDMedium Plants 4.9 - 7.5 MGDLarge Plants 10 - 80 MGDLOG(WTW) = 0.808071 - 1.220862 * LOG(MG)

Wire to Process

Correlate energy use with TSS

Data Collection and Information Gathering

Process and Energy Audits at Water and Wastewater Facilities

Data Collection and Information Gathering

• As-Built/Record Drawings • Original Basis of Design Reports • Operation & Maintenance Manuals • 2 Years of Energy Bills • Equipment Maintenance History

Process and Energy Audits at Water and Wastewater Facilities

Data Collection and Information Gathering

• Meetings/interviews with plant operators/staff. • Establish acceptable payback period. • Review of historical energy costs, usage,

demand, and rate structure. • “Walkthrough” the SCADA system or process flow

diagram. • Thorough site inspection and review of existing

equipment, processes, and operation philosophy. • Consider energy impacts of recent or planned

upgrades.

Process and Energy Audits at Water and Wastewater Facilities

Savings Calculations

• Develop Energy Saving Alternatives • Evaluation Summary of Advantages and

Disadvantages • Installation Costs • Operation and Maintenance Costs • Energy Savings (kwh, kw, $) • Simple Payback Period (also determine go/no-go

payback period levels)

Typical Energy Saving Measures

Process and Energy Audits at Water and Wastewater Facilities

Typical Energy Saving Measures

• Variable Frequency Drives \ Pumping System Optimization

• Energy Monitoring Systems • Aeration System Optimization • Anaerobic Digestion • Solids Handling • Opportunities for Recycling (i.e., waste heat

recovery) • Cogeneration • Peak Load Reduction • Conservation and Training

Process and Energy Audits at Water and Wastewater Facilities

Typical Energy Saving Measures

• Lighting Systems • Building Envelope and Insulation Systems • Utility Rate Structures • Heating Controls • Alternative Fuels • Operation and Maintenance Procedures • Equipment Replacement • Energy Efficient Motors

Renewable Energy

Process and Energy Audits at Water and Wastewater Facilities

Renewable Energy

• Understand Utility Interconnection Requirements • Understand Utility Rate Structures • May Not Pass Payback Period Test Without

Grant Incentives

Process and Energy Audits at Water and Wastewater Facilities

Renewable Energy Options

Biogas • From Anaerobic Digesters • Combined Heat and Power Generation • Use of Biogas for Heating Hydropower • Turbine on the Influent or Effluent • Feasible for High Elevation Drops, On-Site Use of

Electricity

Influent/Effluent Thermal Exchange

Process and Energy Audits at Water and Wastewater Facilities

Renewable Energy Options

Solar or Photo Voltaic (PV) • Need Large Space: Big Tank or Building Roof Wind • Need Large Space • Esthetic/Community Concerns

Measurement and Verification

Process and Energy Audits at Water and Wastewater Facilities

International Performance Measurement and Verification Protocol (IPMVP)

• A - Partially Measured Retrofit Isolation • B - Retrofit Isolation • C - Whole Facility • D – Calibrated Simulation

Funding

Questions?