Presented by:

Department of Transportation - Toll Bridge Program

New Benicia-Martinez Bridge Project

New Benicia-Martinez Bridge Project

Aerial View Of Benicia Bridges

New Benicia-Martinez Bridge

Existing Benicia-Martinez Bridge

New Benicia-Martinez Bridge Project

Remove Median Barrier and place floating slab

Remove Asphalt and replace with lightweight fill.

Marina Vista Road

Complete Remaining work on Marina Vista to new Mococo rail crossing.

South Approach Contract Work

New Benicia-Martinez Bridge Project

18” Asphalt Overlay

Raise Mococo Bridge by 18”

South Approach Contract Work

New Benicia-Martinez Bridge Project

Existing Bridge Work

Add New Bike/Pedestrian Walkway

Demolish Center Median

Benicia

MartinezReplace 67 Deck Joints

Replace Deck Sections

New Benicia-Martinez Bridge Project

Replace Deck Joints

- 67 Joints spaced 90’ apart

Replace Deck Sections

Stage 1

Stage 2

Expansion Joint Reconstruction

New Benicia-Martinez Bridge Project

Deck Reconstruction

Pier 3 to Pier 13 12’ wide replacement (Entire length of truss bridge).

Pier 13

Pier 3Deck Reconstruction

Pier 3 to Pier 13 12’ wide replacement localized Areas

Partial Deck Reconstruction

New Benicia-Martinez Bridge Project

Deck Reconstruction – Typical Section

New Benicia-Martinez Bridge Project

Expansion Joint Reconstruction

New Benicia-Martinez Bridge Project

Existing Bridge With New Public Access

Existing Bridge

74’

12’ 11’ 11’ 6’ 11’ 11’ 12’median

Existing Bridge with New Bicycle & Pedestrian PathSouthbound I-680

74’

12’shoulder

8’ 12’ 11.5’ 11.5’ 11’ 8’shoulder

Southbound Northbound

New Benicia-Martinez Bridge ProjectPublic Access At North Approach

Existing Vista Point

New Bicycle &Pedestrian Path

New Benicia-Martinez Bridge ProjectBike Path Cross Sections

12’ 2’2’

2%

Typical Section

12’ 2’

FreewayTraffic

Adjacent to Freeway Shoulder

2%

12’

1.50%Bridge Traffic

Existing ConcreteBarrier

On Existing Bridge

New Benicia-Martinez Bridge Project

Mococo Road

Public Access toNew Toll Plaza

MARTINEZ

Marina Vista Road

New Bicycle & Pedestrian Path

South Approach Contract Work

New Benicia-Martinez Bridge Project

Bike and Pedestrian Facilities

New Benicia-Martinez Bridge ProjectNorth Approach Contract Work

Remove Toll Plaza

New Benicia-Martinez Bridge Project

Demolish Over crossings

Demolish Existing Toll Plaza

New Pedestrian/Bike Path

Realign I-680/I-780 SB Traffic

North Approach Contract Work

Benicia