PRESENTATION January 8, 2004 ORANGE BOWL STADIUM.

Post on 31-Mar-2015

213 views 1 download

Tags:

Transcript of PRESENTATION January 8, 2004 ORANGE BOWL STADIUM.

PRESENTATION

January 8, 2004

ORANGE BOWL STADIUM

STUDY SCENARIOS

SCENARIO A- Orange Bowl Redevelopment for Professional Baseball,

Soccer and Collegiate Football within the existing Stadium.SCENARIO B- Create a multi-purpose sports complex that leverages the existing stadium infrastructure at the Orange Bowl and

provides state-of-the-art facilities for Major League Baseball,

Collegiate Football and Professional Soccer.

DESIGN forFOOTBALL, BASEBALL &

SOCCER

MULTI-SPORTS COMPLEX on ORANGE BOWL SITE

SCENARIO B – MULTI-SPORTS COMPLEX

Site Plan

SCENARIO B – MULTI-SPORTS COMPLEX

Building Rendering

CONCLUSION

SUMMARY

SCENARIO A- Renovate the Orange Bowl Stadium and integrate

baseball as a short term use.

SCENARIO B- Maintain the integrity of the Orange Bowl Stadium for Collegiate

Football and provide a permanent solution for Major League Baseball.

NEXT STEPS

The following outline highlights immediate action steps to establish a stadium development

plan for the City of Miami that evaluates the Orange Bowl alternatives and new stadium

initiatives.

•Establish a Development Program for each Stadium Alternative

•Define Program Requirements (Baseball, Football & Soccer)

•Prepare Conceptual Design

•Perform Constructability Analysis

•Establish Preliminary Master Project Budget / Master Project Schedule

•Identify Available Funding Sources

•Prepare Draft Financing Document

•Establish Term Sheet

•Secure Appropriate Project Approvals

60 Days

PRESENTATION

January 8, 2004

ORANGE BOWL STADIUM