PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.

Post on 12-Jan-2016

219 views 0 download

Tags:

Transcript of PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.

PRESENTATION BY

Manaranjan Mali ,

Addl.P.D Technical ,

DRDA, Nabarangpur

M.G.N.R.E.G.S. - ORISSA

Wage Exp. 3697.49

Material Exp. 1906.43

Admn.Exp. 116.46

BALANCE -215.96

Mandays Generated (in Lakh)

SC ST OC TOTAL WOMEN

3.84 19.81 7.36 31.01 11.41

Wage Material Ratio 65.98 : 34.02

No.of Families Completed 100

days4793

O.B. AS ON 01.04.2009 3954.42

CENTRAL RELEASE 1395

STATE RELEASE 155

TOTAL FUNDS RECEIVED

1550

TOTAL FUNDS AVAILABLE

5504.42

EXPENDITURE UPTO 31.03.10

5720.38 ( 103.92 %)

Mandays Performance under MGNREGS

0.40 0.91 2.705.11 6.31 7.41 8.46 9.50 10.92

13.9517.95

31.01

0.08 0.461.02 2.28

4.20 5.84 6.77 7.38 8.58 9.7011.01

15.94

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Achie

veme

nt (L

akh

Man

days

)

Months

Monthwise Cumulative Mandays Generated under MGNREGS, Orissa(Lakh Mandays)

2009-10 2008-09

Expenditure Performance under MGNREGS

Monthwis e C umulative E xpenditure under MG NR E G S , Oris s a

(R s . in C rore)57.14

0.16 0.80

0.282.79 6.15

10.4612.90 14.91 17.16

19.4223.56

29.68

36.95

1.66 3.685.66 8.32 8.92 10.98

16.29 17.7719.80

27.84

0.00

10.00

20.00

30.00

40.00

50.00

60.00

Apr May J un J ul Aug S ep Oct Nov Dec J an F eb MarMonths

Expe

nditu

re (R

s.

in C

rore

)

2009-10 2008-09

Project Initiation Meeting (PIM) is mandatorily conducted before execution of any project involving PRI Members/Job card holders/ SHGs/ NGOs & Block level officers etc.

PIM Meeting at Dangarbheja GP of Nandahandi block for the work of Imp.

of tank at Mundiguda village

PIM Meeting at Chikalpadar GP of Umerkote block for the work of Imp.

of Chanchanbeda village road.

Excavation of Tank at Kesarigudaof Nabarangpur block

E.C :- 8.00 Lakhs, W/M=88:12

Will provide irrigation & will be used for multipurpose usage.

Imp of Digaguda- Churahandi road of Sanmosigam GP of Nabarangpu

Block. E/C.-Rs.5.00 lakhs, W/M=78:22(Over all stood 1st in the Block)

Men at work

Imp. Of road road from RD road to Sagadiapada under MGNREGS

of Chandahandi block.E/C.=Rs.5.00 Lakhs

W/M=85:15In this project about 80% is women.

Imp. Of road from High School road to Ratakhandipada under MGNREGSof Chandahandi block (border block

adjacent to Kalahandi Dist)E/C.=Rs.8.00 Lakhs

Women involvement

Imp. Of road road from Khutuguda to Bandhapada of

Chandahandi block.E/C=Rs.8.00 lakhs.

W/M = 82:18Here 85% are women labourers.

Women motivation really works

Improvement of GoudodeopalliVillage road of Tentulikhunti block.

E/C=Rs.5.00 lakhs.Here 89 % are women labourers.

Women involvement

Imp. Of road from Raighar road to Malbeda of Raighar block.

E/C=Rs.8.00 lakhs.W/M=75:25

To mitigate the migration of Labourers

to Chattisgarh State.

A perfect pit to measureIn the project of Imp. Of road

From Saruguda to Kukudabai ofDangrabheja GP of Nandahandi

Block. E/C=Rs10.00 lakhs

Earth work, 2009-10

Total Family involvement in MGNREGSWork.

While both husband and wife are workingthere child is playing with supplied toys at

the work site.

About 10-15 children were provided with toys

and watched by care taker at work site in the project of

Imp. of road from Saruguda to Kukudabai of

DangarbhejaGP of Nandahandi Block.

Addl.PD (Admn.), DRDA is supervising at the work site.

Work Site Facility (Creche)

Check Dam at Kusumi of Nabarangpur BlockE.C :- 8.00 Lakhs

Irrigating 15 Acres of Land for 11 nos. of beneficiaries. Also useful as passage

for the near by villagers.

Check dam of Papadahandi blockE.C.:-10.00 Lakhs

Irrigates 20 Acres of land even in summer.

Water conservation

Irrigation Canals

Irrigation Canal with Check Dam at Atigaon of Kosagumuda block

for ST LandsE.C :- 7.50 Lakhs

Additional ayacut have been generated for 20 Acres. 17 beneficiaries benefited.

Check Dam at Mangiaguda of Kosagumuda block for ST Lands

E.C :- 8.25 Lakhs Additional ayacut have been generated for 27 Acres. 20 beneficiaries benefited.

Farm pond of Bhagaban Mali of Sanmaliguda of Nandahandi block.

E.C :- 0.20 Lakh

Vegetable Cultivation done by the beneficiary last year and awarded

as Best Farmer. He is earning about 1.00 Lakh per Annum. He is benefited by

Pisciculture & Veg. cultivations like Cabbage, Tomato, Chilli etc.

Farm pond of Pitambar Mali of Ponduguda of Kosagumuda block.

E.C :- 0.50 Lakh

Vegetable Cultivation & Pisciculture done by the beneficiary

Farm pond of Samudu Bhatra of Mantriguda of Nabarangpur block.

E.C :- 0.35 LakhHe is earning about Rs.1 lakh per annumFrom Pisciculture and Maize Cultivation.

Maize, Sugarcane Cultivation & Pisciculture

done by the beneficiary

IMPV. OF ROAD FROM KHUNTIA CHAWK TO DENGATUTAGUDA (NANDAHANDI BLOCK) 2009-10

Estimate Cost : - Rs.3.00 lakhMandays Generated-26660Wage/Mat ratio- 85:15Women Labour Engaged-13254

Heavy vehicles are running in this road for transportation of stone from crusher units.

FARM POND OF SRI SIBA PRASHAD NAIK OF VILLAGE SARUGUDA UNDER DANGARBHEJA GP OF NANDAHANDI BLOCK 2009-10

Estimate Cost : - Rs.0.50 LakhsMandays Generated-312Wage/Mat ratio- 98:02Women Labour Engaged-102

INITIATIVE STEPS TAKEN

1. Generation of Mandays for each GP is fixed for every block as per the Labour Budget.2. Fortnight review of progress by PD, DRDA & Collector.3. Daily mandays report (DMR) must reach at 10..00AM.4. Project Initiation meeting before the commencement for every project is a must.5. Engagement of women labourer Is mandatory.6. Involvement of PRI members in MGNREGS work is must.7. Massive number of farm ponds are being taken up.8. Minimum 2 projects are taken up in every village.9. Line Departments like Soil Conservation, Horticulture, Forest, DFO, MI, Agriculture etc are very much involved for MGNREGS works.10. District level squad is constituted by DRDA to inspect MGNREGS work in each month.11. Individual families are motivated to complete 100 days of work.

12. FRC beneficiaries are involved for their land development & Farm Pond.13. Women SHG groups under SGSY, Mission Shakti, OTELP, Watershed of soil conservation, Fishery, GM DIC etc are involved for motivation of the women labourers for coverage of women labourers.14. Organizing Job card Mela in GP level as well as in watershed area.15. A detailed work out on Mandays and Expenditure has been made giving target to all the Line Departments/ GP/ Blocks.

THANK YOU