Pre-ATP Reporting Template

Post on 19-Dec-2015

220 views 0 download

Tags:

description

temp

Transcript of Pre-ATP Reporting Template

Date: 04/06/2014 Site ID: RUR0629 RBS Type: 6301 Equipment Checked: RBS, BBS, TRM

Finding pictures as below

Picture No 1 Picture No.2

1: Site Id 2: RBS, BBS Front View

Picture No.3 Picture No.4

3: RBS Door Open 4: RBS Connection Cable with Labels

. . . . Picture No 5 Picture No.6

5: Alarm Cable with OVP & Labels 6: Power, IF and fibres Cables Routing

Picture No.7 Picture No.8

7: BBS Door Open. 8: Alarm, AC & Grounding Cable Routing In BSS.

.

. .

Picture No.9 Picture No.10

9: AC & RRU Cable Connection with labels In Rectifier 10: SPD, Breakers with Connections

Picture No.11

11: Alarm Patching In DDF with Labels.

Picture No.12 Picture No.13

12: TRM (6102) Door Open view 13: TRM with Grounding

Picture No.14 Picture No.15

14: Tower Grounding Bar 15: BBS Grounding

Picture No.16

16: RBS Grounding

17. VSWR snapshot

18. RSL Snapshots