Post on 03-Jun-2018
8/12/2019 Practical Knowledge for Marine Engineers
1/67
How to Know if the Piston is at Top Dead CenterWhen checking tappet clearance on marine engines, we have to ascertain that
the piston is at TDC. Though markings are provided on the flywheel, the marine
engineer must know the other methods for this like inspection of the camshaft
and the fuel pump window.
Why Know the TDC Position of the Piston?During the maintenance of a four stroke marine diesel engine there are times
when we must know whether the particular units piston is at the top dead centerof not. For example when checking the tappet clearances of the engine it is
important to know which unit is at TDC.
Referring to the flywheel would indicate two units, but only one can be at
injection TDC. So which one is it?In this article the various methods to find out the position of the piston would bediscussed. Some are very simple using conventional methods. Other methods
are a little bit complicated, but nevertheless important whenever you require an
independent method to find TDC.
Flywheel MethodThe flywheel is the simplest method to know which unit is at TDC. If the fly
wheel shows two units, simply open the bonnet covers and check visually. The
unit at TDC will have both the inlet and the exhaust valve closed and hencerelaxed springs; the other unit would have both the arms of the rocker arm at
different levels. In addition the push rods of the unit at TDC would be loose andcan be turned by hand because of the release of the clearances. There is a word
of caution however: this method is only useful in a working generator which
you have just stopped to check the tappet clearances. In case you have removed
the rocker arms for any reason the spring height and the push rod freeness check
would lead you nowhere and misguide you.
Flywheel Marking
8/12/2019 Practical Knowledge for Marine Engineers
2/67
Fuel Pump MethodThe most accurate method to know the position of the piston without opening
up the piston is the fuel pump window. The fuel pumps have a window and as
the plunger goes up and down, so does the mark on the bottom spring holder.On the body of the fuel pump there are cut marks which show the start of
injection. In a diesel engine the start of injection is the injection TDC where
both the inlet and the exhaust valves are closed. In this injection TDC we can
check the tappet clearance. It must be noted however that the injection TDC is
not the absoluteTDC as the piston is still some way down depending on thedesign of the engine. An injection TDC may be around 5 degrees before TDC.
Dial Gauge MethodIn this method the fuel injector is taken out and from the opening a dial gauge is
put inside. Then the turning gear is engaged and the engine turned over. The
pointer of the dial gauge will move in one direction and then stop and start in
opposite direction. The moment the pointer of the dial gauge stops and changes
its direction of movement is the TDC of the unit. This method is not normally
used in day-to-day practice, but may be used in the calibration of the flywheel if
it is not calibrated, or after some repairs.
Dial Gauge
Camshaft MethodThe camshaft window of the engine can be opened up and the camshaft
inspected. The cam of the engine has a base circle, and acceleration and dwellperiods. If the roller of the follower is at the base circle, then the particular
http://img.bhs4.com/C3/A/C3ADCEC92F0BAA1A4E7835D8CEA43FC3D49B88BA_large.jpghttp://img.bhs4.com/DE/C/DECB6DD66E058098B9E626F2660B7AD9AD5408B7_large.jpghttp://img.bhs4.com/C3/A/C3ADCEC92F0BAA1A4E7835D8CEA43FC3D49B88BA_large.jpghttp://img.bhs4.com/DE/C/DECB6DD66E058098B9E626F2660B7AD9AD5408B7_large.jpg8/12/2019 Practical Knowledge for Marine Engineers
3/67
valve is closed by spring action. When both the exhaust valve and the inlet
valve follower are on the base circle, then the unit is also at TDC. It must be
remembered that as a four stroke engine has two rotations of the crankshaft
there is one injection TDC where the injection and the combustion take place.
The second time the piston is at TDC is when the exhausting of the flue gasestake place. It is very important to identify the combustion TDC as tappets haveto be adjusted at that point.
Cam Profile
Crankcase MethodIn this method the crankcase doors are opened up and the piston is visually
checked whether is going up or down. This is the surest method, but a bitcumbersome. It should be used when you have a strong doubt about the other
methods.
Valve Spring MethodThis is not an independent method but is used in conjunction with the flywheel
method. In this method if the flywheel is indicating two units, you can check the
springs of both the units. The unit in which the springs are loose is the one at
TDC. The caution is that this method is useful for an engine in use. If you have
removed the rocker arms during the overhaul and thereafter you want to use thismethod then it can cause errors.
Push Rod MethodThis method is like the spring method and you check that the push rods are free
to turn. The unit at TDC will have loose springs. The care that must be taken isthat it should be used along with the flywheel method and should be used in a
working engine. By a working engine, I mean the engine that was running and
has been stopped for tappets adjustment.
Spill Timing Method
http://img.bhs4.com/AB/A/ABAE1A7AF99C04B436D1854B2AEB80889D0E086A_large.jpg8/12/2019 Practical Knowledge for Marine Engineers
4/67
This is a very accurate (and tedious) method generally used to check the start of
injection in the fuel pump. It will also give you the injection TDC. It is used not
in the tappet checking process, but instead to find the start of injection when
you have power or thermal balance problems.
Basically in this method the delivery valve of the fuel pump along with thedelivery valve spring are removed. There after a special "U" shaped pipe is put
in place of the high pressure pipe. After this operation the engine is turned by
the turning gear and slowly brought near the expected TDC.
Soon oil will start spilling out of the pipe because the oil is entering from the
inlet port, which is uncovered by the plunger. Keep turning the engine slowlyand the oil quantity will reduce. The point where the oil flow just stops is the
start of the injection. At this moment the plunger of the fuel pump has closed
the inlet port and if you observe the fuel cam, you will find the follower is no
longer at the base circle.
As this method involves the spilling of fuel, it is called the spill timing method.
How Does An Air Ejector Work?An air ejector or steam ejector is a device which uses the motion of moving
fluid (Motive Fluid) to transport another fluid (Suction fluid). It is has a wide
range of application in steam ejector in boiler condenser, fresh water generatorand in priming the centrifugal pump.
Air Ejector TheoryIt works on the principle of convergent /divergent nozzle as it provides the
venturi effect at the point of diffusion as the tube gets narrows at the throat the
velocity of the fluid increases and because of the venturi affect it pressure
decreases, vacuum will occur in the diffuser throat where the suction line will
be provided.
An air ejector which uses the high pressure motive fluid such as air or steam toflow through the convergent nozzle the function of the convergent nozzle is to
convert the pressure energy of the motive fluid into the velocity energy.
As in convergent nozzle the following effect takes place,
P1-pressure of the fluid entering the nozzle.
V1- velocity of the fluid entering the nozzle.
P2- pressure of the fluid leaving the nozzle.
http://img.bhs4.com/6f/3/6f39ca13c1f582c061186f70eb673f78a476e9f7_large.jpg8/12/2019 Practical Knowledge for Marine Engineers
5/67
V2- velocity of the fluid leaving the nozzle.
y Bernoullis theorem:P1 V1 = P2 V2.
As the pressure energy before entering the convergent nozzle is greater and thevelocity is less for the fluid. At the point of discharge the pressure energy is
converted into the velocity so the velocity will be greater and the pressure will
be less during the discharge.
Divergent nozzle the opposite effect takes place velocity energy is convert into
pressure energy, at the point of diffusion there is a low pressure or vacuum iscreated which is used to suck the other fluid for the motion.
In the fig: C- Convergent Nozzle.
D- Divergent Nozzle.
V- venturi Point or Diffuser Point.
Air Ejector
Appliction of Air Ejectors:1.Steam Jet Air Ejector:It is one of the types of air ejector which is used in the steam like near the
condenser to remove the non condensable gases and some vapour entering into
main condenser by an air ejector and it is cooled by the main condensate and
released in the ejector condenser.
A steam is used as the motive fluid to withdraw air and dissolved gases from the
condenser by the ejector action. In each stage of the steam jet ejector, high
pressure steam is expanded in a convergent /divergent nozzle. The steam leavesthe nozzle at a very high velocity in the order of 1220 m/s and a proportion of
http://img.bhs4.com/1A/D/1AD5569374EA6ED38FB0CB396AD4517651BCD104_large.jpghttp://img.bhs4.com/d5/b/d5bdec839ff2513da5d24ebc4af796934e947b34_large.jpghttp://img.bhs4.com/1A/D/1AD5569374EA6ED38FB0CB396AD4517651BCD104_large.jpghttp://img.bhs4.com/d5/b/d5bdec839ff2513da5d24ebc4af796934e947b34_large.jpg8/12/2019 Practical Knowledge for Marine Engineers
6/67
the kinetic energy in the steam jet transferred by interchange of momentum to
the body of air which entrained and passes along with the operating steam
through a diffuser in which the kinetic energy of combined steam is re-
converted to pressure energy.
The maximum pressure ratio that can be obtained with a single stage is roughly5:1 and consequently it is necessary to use two or even three stages in series to
establish a vacuum in the order of 724mm of Hg with reasonable steam
consumption.
Design Feature:There are a variety of ejectors designed in service which work on the same
principle. Older unit have heavy cast steel which serves as a vapour condenser
and also contains diffusers. These are arranged vertically the steam entering at
the top. More recent design has the diffuser arrangement externally and vapor
condenser shell is some what lighter in construction.
Horizontal singe element two stage air ejectors this unit comprises a stack u-
tubes contained in a fabricated mild steel condenser shell on which is mounted asingle element two stage air ejector.
The condensate from the main or auxiliary condenser is used as the cooling
medium. High velocity operating steam emerging from the 1 st stage ejector
nozzle entrains the non-condensable and vapour from the main condenser andthe mix discharge into the inter condenser.
Most of the steam and vapour is condensed when it comes into contact with the
cool surface of the tubes, falls to the bottom of the shell and drains to the main
or auxiliary condenser.
The remaining air and water vapour are drawn into the second stage ejector anddischarged to the steam drain tank and non-condensable gases are at last
discharged to the atmosphere through vacuum retaining valve.
2.Fresh Water Generator:The next main application of the air ejector in marine field is in fresh water
generator as it is used to remove the air and non condensable in the evaporatorchamber so as to maintain the vacuum inside the chamber. Thus the efficiency
of the generation increases at low temperature of the sea water.
3. Self Priming of Centifual Pumps:It is also employed in priming of the centrifugal pumps by the air ejector, which
removes the air inside the casing of the pump by the suction effect created bythe air ejector thus by flooding casing with the liquid so that it helps in stating
of the pump.
Test and Overhaul of Fuel Injection Valves
8/12/2019 Practical Knowledge for Marine Engineers
7/67
This article discusses the testing and the overhaul of fuel injectors of marine
engines,the testing of the needle and guide condition of the fuel valve, and the
procedure to overhaul and inspect the injectors taken out of the marine diesel
engines.
Fuel Valve Checks
The fuel valves taken out from the engine must be checked for function and
performance. Even in engines which are stopped on heavy fuel oil in ports the
fuel injector taken out must be immediately tested with diesel oil before they get
cold as this will flush and clean the components. It must be noted that if the fuel
valves taken out are tested after they have cooled, will show bad performanceeven if they were performing satisfactorily in service.
In the majority of cases the fuel injectors have a good spray profile but they
open up at a less pressure. The pressure adjustment can be done without
opening up the valve and should be done so. The engine manufacturers also
instruct that unless the fuel injector valve has a major problem like holes choked
or valve dripping, they should not be opened up. The valve should be cleaned
from the outside, pressure checked, pressure adjusted and tagged.
Inspection and RepairsIn the case where the fuel injector valve is not performing as required and has
some defect, then it needs to be opened up and overhauled. The assembly and
the disassembly have to be done as per the instructions given by the engine
manufacturer. However, below is a general guide about what you will most
likely have to do.
After the fuel valve has been disassembled then the following checks have to be
done:
http://img.bhs4.com/78/7/787d6168c234703809d574d3dd032c81e743c9a6_large.jpg8/12/2019 Practical Knowledge for Marine Engineers
8/67
1. The needle guide should be immersed in clean diesel oil and the needle taken
out and checked for free movement. In the case of any resistance which may be
due to the presence of carbon or fuel sludge the needle may be put in and pulled
out in succession many times while keeping it submerged in diesel oil. It is
important to do this in a container full of clean diesel oil so the contaminantscan be flushed away.
2.After the needle guide has been cleaned, the needle should be taken almost
out and then let it fall in with its own weight. A free and smooth movement with
small jerks as the clearance is making way for the oil to come out is an
indication that the clearances are all right and the needle guide is in good
condition. It must be noted that the needle should fall fully into the seat.
3. On the other hand if the needle falls fully in one go, then the clearances haveincreased and the fuel will leak past the spindle and less fuel will go in the
cylinder. The needle must be inspected for any wear marks if this happens. The
needle guide can be used but must be changed soon.
4. If the needle does not go down and gets struck then it must be thoroughly
cleaned again. If still there is no improvement then the needle might have
become bent. Check the needle for any signs of overheating.
5. The push rod end should be checked for any abnormal wear.
6. The seating between the nozzle body and the valve body if damaged can be
repaired by lapping with fine lapping paste. It must be noted that the lapping
paste should be thoroughly flushed away with clean diesel oil and thereafterblown dry with compressed air.
7. Check the nozzle spring for breakage, poor seating and other defects. Change
if required.
8. Check the leak off pipes, shims, packing etc for the condition. If the fuel
valve is water cooled, the cooling pockets should be cleaned with compressed
air.
Tests and Adjustments1. After the parts are cleaned and inspected the fuel valve is assembled as per
the manufacturers instructions and thereafter tested for function and
performance.
2. The assembled fuel valve is installed on the test stand and after purging thepipe line the manual handle is operated in quick succession. The nozzle should
start discharging with a sharp crackling noise at the set pressure. The pressure at
which the injector is supposed to fire depends upon the manufacturers engine
design but normally is between 250 to 350 kg/cm2 with an allowance of plus or
8/12/2019 Practical Knowledge for Marine Engineers
9/67
minus 10 kg/cm2.
3. In case the lifting pressure is not correct, it can be adjusted by the adjusting
screw.
4. The spray characteristics should be satisfactory and as per the manufacturersadvice.
5. All the holes of the injector should be firing and can be checked by a torch
light or a filter paper can be folded as a cone and then the injector tested. The
holes on the filter paper will show the number of holes firing. In this procedureyou must be careful as the high pressure spray can enter the skin and is toxic for
us.
6. The spray angle should be as stated by the manufacturer. The atomization of
the fuel should take place and solid spray should not come out.
7. Clean diesel oil should be used for the testing purpose.
8. In the case that the fuel valve is dripping the needle guide should be taken out
and repaired.
CautionThe needle and the guide is always a pair and should not be interchanged withanother one. Cleanliness is the most important factor in making fuel valves. A
clean fuel valve lasts a longer time. The fuel under pressure can enter the skinand the blood stream and is toxic for humans. Take care that you stay away
from the spray. The fine mist can catch fire and in inflammable. Do not smoke
or use naked lights where the fuel injectors are being tested.
A Guide to Grinding and Lapping Paste
Grinding pastes are used for controlled removal of metal, polishing, and fitting
applications. They are used in various applications like fuel injector and exhaust
valve overhaul, globe valve overhaul, and threading and tapping applications,
among others. Grinding Paste
Lapping paste is a mixture of hard abrasive particles in a suitable base. The base
can be oil-based like grease or water soluble lubricant. The hard particles used
are carborandum, aluminum oxide, silica or silicon carbide, glass, boron
carbide, etc.
Lapping pastes are used for controlled removal and are used for the close
mating of surfaces and for removing rust and the brightening of a metal surface.
They are used for lapping of the exhaust and the inlet valves of engines, seatrepairs of globe valves, the overhaul of reciprocating compressor valves, etc.
8/12/2019 Practical Knowledge for Marine Engineers
10/67
The lapping paste are graded from extra coarse to extra fine. In extra coarse
there are few grits of larger size abrasives, and it is used for rough lapping. In
extra fine grinding paste, there are a very large number of grits of very fine
particles and it is used for fine lapping. The larger the grit rating of the lapping
paste, the finer is the paste. Correct Methods of Manual Lapping
When using hand lapping there are two methods of lapping used, the first is the
figure of eight lapping and the other is circular. In case a guide is available, like
the nozzle nut in a fuel injector the circular method can be used. The figure of
eight lapping needs a mature hand and best not left to novices. It should beremembered that if you can stop that leakage with a minimum amount of
lapping then over lapping should be avoided. Under lapping is always preferred
to over lapping and lapping must not be done just for lapping sake but the
advice of the manufacturers must be sought.
In a figure of eight method a numeric shape of eight is made on thesurface plate by the operator. In a circular method the job piece is rotatedcircularly in place.
The exposed metal should give a uniform polished look and the quality of the
lapping can be made out by the patterns. Any stray scratches on the lapped
surface should be avoided as under high pressure they can become channels forleakage.
Role of Lubricants in Lapping PasteOil and grinding paste have contrary functions, while abrasive increases the
rubbing and cutting the oil seeks to reduce it. However oil is used to control the
abrasive and cutting action. It also is the base in which the abrasive particlesfloat and move under the action of the mating surfaces. Oil or grease is
However used in a certain measured amount.
Some people like to use additional lubricant during lapping process. However it
must be remembered that the addition of more oil is reducing the effort and the
cutting action of the abrasive particles. The abrasive particles are also washedaway if extra lubricant is added.
During lapping if you want fast removal of the metal you must lap till the effort
to move the mating parts reduces. The reduction of the force indicates that the
abrasives have broken down to harmless paste and are now acting like a
lubricant. Therefore you must remove the old lapping paste and put fresh paste.
If sufficient care is not taken during this time then metal to metal contact would
take place and the effect of spot welding and scuffing would spoil the finish
desired. Taking Care of lapping Paste
8/12/2019 Practical Knowledge for Marine Engineers
11/67
Lapping is an art and a master machinist would work down from a coarse to a
very fine grade in a proper sequence to get the desired finish and precision as
required. Each grade has carefully controlled similar sizes of abrasive particles
suspended in the base. Any alien particle of a coarse abrasive in an extra fine tin
can create frustration especially when you are on your final finish.It is a good practice to keep all the lapping and the grinding paste cans closed
when not in use. Also when a fresh charge of lapping paste is taken it should be
rubbed thoroughly between the fingers to make out for any contaminants. This
is very beneficial when you are doing fine lapping.
Cleanliness in Precision LappingCleanliness is one of the most important factors in precision lapping as is the
quality of the lapping paste and the skill of the operator. It is a good practice
that the work table is cleaned with clean rags and blown dry with compressedair before the lapping. If a surface plate is being used then it should be washed
with clean kerosene and then blown dry with compressed air.
Also when removing used lapping paste from items being lapped, they should
be
How to Take Accurate Readings Using Micrometer Screw Gauge?
Micrometer screw gauge is used for measuring small dimensions with acuteprecision. Screw gauge is used for dimensions smaller than those measured by
vernier calipers. Learn how to take accurate measurements using a screw gaugein the article inside.
IntroductionA micrometer screw gauge is used for measuring dimensions smaller than those
measured by the vernier calipers. A micrometer screw gauge is a small
measuring device which works on the screw principle. To more about the
different parts and the working principle of the micrometer screw gauge
readhere.
Having a U shaped metallic frame, a micrometer screw gauge measures eventhe minutest length with acute precision. In the following article we will learn
how to read a micrometer with utmost accuracy.
http://www.brighthubengineering.com/manufacturing-technology/65356-what-is-a-micrometer-screw-gauge/http://www.brighthubengineering.com/manufacturing-technology/65356-what-is-a-micrometer-screw-gauge/http://www.brighthubengineering.com/manufacturing-technology/65356-what-is-a-micrometer-screw-gauge/http://www.brighthubengineering.com/manufacturing-technology/65356-what-is-a-micrometer-screw-gauge/8/12/2019 Practical Knowledge for Marine Engineers
12/67
Using Micrometer Screw GaugeJust like a vernier calipers, a micrometer screw gauge also carries two scales - a
main scale and an auxiliary scale. The main scale is a millimeter scale graduated
to 0.5 mm, whereas the auxiliary scale is divided into 50 equal divisions. Theauxiliary scale is on the thimble of the screw gauge and measures hundredth of
the measurement. The jaws of the gauge are moved rotating the thimble. The
auxiliary scale on the thimble is also known as the vernier rotating scale.
Moreover, the thimble is so adjusted that 2 revolutions of the thimble will allow
the jaws to move by 1 mm. This means that a single rotating will move the jawsonly by 0.50 mm. The main scale lies on the part of the screw gauge known as
the sleeve.
wiped with soft tissue paper and cleaned with compressed air.
How is the Reading Taken?
In order to take the reading using a screw gauge, the object is placed between
the jaws which are moved by the thimble. The ratchet knob is used to adjust the
object firmly between the jaws. For accurate reading, the thimble should be
moved until three clicks are heard from the ratchet. The ratchet ensuresaccuracy and also prevents the object from getting damaged. The main scale
reading is taken by considering that marking on the sleeve which is visible just
to the left of the thimble. It is also to note that the 0.5 mm divisions that areprovided below the main scale should also be considered while taking the
reading. The auxiliary scale reading is taken by observing the marking on thethimble that coincides with the main scale on the sleeve. The auxiliary reading
figures will follow the main scale reading figures in the final reading. Lets take
an example to understand this.
Example 1Imagine that the scales have come to the positions as shown in the figure below,after the jaws are kept around the object. The lock can be used to assure that
readings dont change due to the movement of the thimble. In the figure, it can
8/12/2019 Practical Knowledge for Marine Engineers
13/67
be seen that the marking on the main scale which is just to the left of the
thimble is 7 mm. However, the half scale division that is visible below the main
scale shouldnt be neglected and thus the reading on the main scale will be
7.5mm. For the auxiliary scale reading, it is noted that the 22nd
division on the
thimble scale matches with the main scale. Thus the thimble scale readingwould be 0.22 mm. The final reading will be the addition of these two readingsi.e. 7.5 + 0.22 = 7.72 mm.
Example 2Lets take one more example to understand it properly. Suppose the scales came
to the positions shown in the figure. The main scale reading would be the
marking that is fully visible immediately to the left of the thimble, i.e. 5.5 mm.
For the auxiliary reading, the 30thdivision of the thimble matches with the main
scale and thus its reading will be 0.30 mm. The final reading will be theaddition of the readings of both the scale i.e. 5.5 + 0.30 = 5.80 mm.
8/12/2019 Practical Knowledge for Marine Engineers
14/67
Calculating the Stoichiometric Air-Fuel Ratio
Achieving fuel-efficiency in Internal Combustion Engines (ICE) is crucial to
operation. In order to efficiently burn fuel in an ICE, you need the correct air-
fuel ratio.
Internal combustion engines burn fuel to createkinetic energy. The burning of fuel is basically the reaction of fuel with
oxygen in the air. The amount of oxygen present in the cylinder is the
limiting factor for the amount of fuel that can be burnt. If theres toomuch fuel present, not all fuel will be burnt and un-burnt fuel will be
pushed out through the exhaust valve.
When building an engine, its very important to know the air-fuel ratio at which
exactly all the available oxygen is used to burn the fuel completely or atleast tothe best possible value. This ratio is called the stoichiometric air-fuel ratio.
Theoretically, this ratio will exist only for a stoichiometric mixture, which is an
ideal mixture and in practice this mixture has never been formed for any
machine so far. As every combustion cycle in an ICE is short lived, so itbecomes almost impossible to achieve the ideal ratio. However, air-fuel ratios
close to it can be achieved by modifying engine design and making use of
proper admixtures and catalysts to keep a check on the pressure and temperature
of the fuel.
The fuel combustion process takes place under very hot and pressurized
conditions and to avoid any unsafe consequences, excess air operations arecarried out. Excess air level keeps a check on the various factors like fuel
composition variation, oxygen availability and pressure, that can lead to an
explosion.
http://img.bhs4.com/04/5/045159580c51ccb181707721aae70e852dbfbf42_large.jpghttp://img.bhs4.com/ac/c/accfaf4762f1100d855ca0851a90b270181e97e2_large.jpghttp://img.bhs4.com/04/5/045159580c51ccb181707721aae70e852dbfbf42_large.jpghttp://img.bhs4.com/ac/c/accfaf4762f1100d855ca0851a90b270181e97e2_large.jpg8/12/2019 Practical Knowledge for Marine Engineers
15/67
Air fuel meters or air fuel gauges are used to measure the air to fuel ratio of
engines. Wideband oxygen sensors are used to measure the air-fuel ratio of
ICEs. Mainly there are two types of band sensors, depending upon the purpose
and type of engine. For heavy-duty and multi-purpose engines, using a wide
sensor is advisable. For general diagnostic purposes, a narrow band sensor ismost suitable. Advanced fuel ratio analyzers and gauges help a great way inmonitoring the performance of an engine and tune it up according to the
requirements.
Calculating the RatioThe air to fuel ratio is the property of fuel and chemical composition of the fuelthat defines the value for this ratio. Most of the fuels we use in internal
combustion engines are hydrocarbons, and their burning will obviously result in
the release of hydrogen and carbon as residuals, along with heat and pressure.
Below is an example of the oxidation reactionof methane (natural gas)as a
fuel.
CH4 + 2(O2) CO2 + 2(H20)
If we look up the atomic weightsof the atoms that make up octane and oxygen,
we get the following numbers:
Carbon (C) = 12.01
Oxygen (O) = 16
Hydrogen (H) = 1.008
So 1 molecule of methane has a molecular weight of: 1 * 12.01 + 4* 1.008 = 16.042
One oxygen molecule weighs: 2 * 16 = 32 The oxygen-fuel mass ratio is then: 2 * 32 / 1 * 16.042 = 64 /
16.042
So we need 3.99 kg of oxygen for every 1 kg of fuel Since 23.2 mass-percent of air is actually oxygen, we need : 3.99 *
100/23.2 = 17.2 kg air for every 1 kg of methane.
So the stoichiometric air-fuel ratio of methane is 17.2.
When the composition of a fuel is known, this method can be used toderive the stoichiometric air-fuel ratio. For the most common fuels, this,however, is not necessary because the ratios are known:
Natural gas: 17.2 Gasoline: 14.7 Propane: 15.5
http://www.brighthub.com/environment/renewable-energy/articles/1724.aspxhttp://www.brighthub.com/environment/renewable-energy/articles/1724.aspxhttp://www.brighthub.com/environment/renewable-energy/articles/1724.aspxhttp://www.brighthub.com/environment/renewable-energy/articles/1724.aspx8/12/2019 Practical Knowledge for Marine Engineers
16/67
Ethanol: 9 Methanol: 6.4 Hydrogen: 34 Diesel: 14.6
You may find it interesting that methanol and ethanol both have a very low air-
fuel ratio, while the carbon chain length is comparable to methane and ethane.
The reason for this is that alcohols like methanol and ethanol already carry
oxygen themselves, which reduces the need for oxygen from the air.
The Bottom LineIn order to be able to judge if an air-fuel mixture has the correct ratio of air to
fuel, the stoichiometric air fuel ratio has to be known. If the composition of a
fuel is known, this ratio can be calculated rather easily.
How to Take Accurate Readings Using Vernier Calipers?
Vernier calipers are small mechanical devices used for taking precision
measurement. Though a bit complex to use it in the first place, a vernier caliper
is supposed to be known as the most widely used instrument in the engineering
field. Find out how to take measurements using vernier calipers
IntroductionVernier caliper is used for measuring length of objects with acute precision. An
important measuring device for engineers, vernier calipers consists of two
scalesa main scale and a sliding or vernier scale. It is important to know the
different parts of the vernier calipers before using it. Know more about Verniercalipers and its various parts inhere.
The main scale of the Vernier calipers shows reading in millimeters, whereas
the sliding vernier scale is divided into ten equal parts and has a least count of
0.1 mm. Readings of both the scales are important for reaching the final
reading.
Reading Vernier Calipers
http://www.brighthubengineering.com/manufacturing-technology/65411-what-is-a-vernier-caliper/http://www.brighthubengineering.com/manufacturing-technology/65411-what-is-a-vernier-caliper/http://www.brighthubengineering.com/manufacturing-technology/65411-what-is-a-vernier-caliper/http://www.brighthubengineering.com/manufacturing-technology/65411-what-is-a-vernier-caliper/8/12/2019 Practical Knowledge for Marine Engineers
17/67
Using vernier calipers in the first place might seem a bit difficult; however with
practice one can easily gain the expertise. It is to note that reading vernier
calipers requires a bit of calibration to be done by the user. Reading of each
scale is taken with respect to the other scale. This means that the reading of the
main scale is taken using the markings on the vernier scale and vise-versa. Letus now understand how the readings of objects are taken using Vernier calipers
Order directly at the specialist. A huge range of measuring tools.
How the Readings are Taken?A Vernier Calipers allows readings up to a precision of 0.02 mm. The object
whose outer diameter is to be measured is kept between the main jaws, whereas
the object whose inner diameter is to be measured is placed around the smaller
jaws. The jaws are so kept that they just touch the surface of the object softly.This is done by moving the vernier scale.
The reading of the main scale is taken where the patch just on the left of the
vernier scale coincides with the marking on the main scale. Whereas the
measurement of the vernier scale is taken by observing the division on the
vernier scale that lines up exactly with that of the main scale. We will see how
this is done taking with the help of examples.
Example 1Imagine that the scales, after placing the object in between the jaws, came to the
position as shown in the figure below. Make sure that the screw clamp is
tightened to prevent the scales from moving. If you observe the vernier scale
carefully, you will notice that the small patch immediately to the left of 0coincides with the 4thmarking after 3 of the main scale. This means that the
main scale reading is 34 mm. This main scale reading is the first significant
figure of the measurement. The vernier readings will be kept after 34 mm to
form the final reading.
Again observing the figure carefully, it is observed that the 60thdivision exactly
coincides with one of the divisions on the main scale. Thus the vernier reading
is 60 and it will be placed right after the main scale reading, i.e. 34.60 mm.
Thus, the final reading of the vernier is 34.60mm.
8/12/2019 Practical Knowledge for Marine Engineers
18/67
Example 2Lets take one more example. In the figure below, the main scale reading, justleft to the zero on the vernier scale is 37 mm. Thus the main scale reading is
37mm. For the vernier reading, it is observed that the 46th
division exactlycoincides with one of the main scale readings. Thus the vernier scale reading is
46 and thus the final reading comes to 37.46mm.
While taking the main scale reading, in case the small division on the left of 0
on the vernier scale, doesnt match any of the markings on the main scale andlies exactly in the center of two divisions than the smaller reading is taken as the
main scale reading. Also, many people complain that there are instances when
more than two divisions of the vernier scale coincide with those of the main
scale. However, in reality such situation is not possible, and if observed
carefully, only one division would be found coinciding exactly with one on themain scale.
8/12/2019 Practical Knowledge for Marine Engineers
19/67
Impressed Current Cathodic Protection System
Corrosion:
The ships hull is corroding in sea water. Generally this is electro-chemical
reaction in which the metal combines with an oxygen, to form a metal oxide or
other compound. This depends upon the nature of the environment. Different
metals have different tendencies to corrode, activity or potential.
Some metals and alloys have two positions in the series, marked Active and
Passive.
The active position is when the corrosion is occurring and approaches the
electro-chemical series position for the material. The passive position relates to
a non-corroding situation where the material is protected by a self forming
surface film.
If two metals are placed in an electrolyte (e.g. sea water or damp soil) and are in
direct electrical contact, a current will pass through the electrolyte from themore active metal onto the least active metal.
The least active metal does not corrode and is termed the cathode. The more
active metal, the anode, passes into solution and the flow of electrical current
increases. This is a metal ion and electron transfer process i.e., it corrodes
Cathodic Protections:
The anodic and cathodic areas in a corrosion cell may be due to the electrical
http://4.bp.blogspot.com/_sxQTbLK7-Rs/SfP9JM-SsRI/AAAAAAAAADE/xwm4qT-Yctc/s1600-h/iccp1.jpghttp://img.bhs4.com/fd/a/fda50fcdd5657f849af7416998b7c1d9e553459a_large.jpghttp://4.bp.blogspot.com/_sxQTbLK7-Rs/SfP9JM-SsRI/AAAAAAAAADE/xwm4qT-Yctc/s1600-h/iccp1.jpghttp://img.bhs4.com/fd/a/fda50fcdd5657f849af7416998b7c1d9e553459a_large.jpg8/12/2019 Practical Knowledge for Marine Engineers
20/67
contact of two dissimilar metals, galvanic corrosion. Anodic and cathodic areas
may be formed on a single metal surface as micro-cells for instance by rain
drops on uncoated steel. Alternatively, they may be close but discrete cells
found when accelerated corrosion occurs at uncoated anodic areas on a
generally coated cathodic structure.Large currents can occur at small anodic areas and lead to rapid corrosion ofmarine structures such as ship's internal tanks, external hull plates, sheet steel
piling in harbours and tubular structures common in jetties and petrochemical
drilling and production platforms.
Cathodic Protection is a system of preventing corrosion by forcing all surfaces
of a structure to be cathodes by providing external anodes.
Sacrificial anode cathodic protection achieves corrosion prevention on a
particular structure or component by forming galvanic cell where an additional
anode of zinc, magnesium or aluminium corrodes in preference to the structure.
The galvanic corrosion current (see simple cell before) available from this
anode / electrolyte / structure combination should be sufficient to overcome thelocal surface corrosion currents on the structure until no current flows from
anodic areas of the structure i.e the structure is entirely cathodic or under
complete cathodic protection As indicated previously, a metal can be madecathodic by electrically connecting it to a more anodic metal within the
electrolyte. The most commonly used anodic metals are alloys of aluminium,zinc and magnesium. Anodes of these metals corrode preferentialy, the
corrosion current of the anode achieving cathodic protection of the structure to
which they are connected.
The anodes deteriorate as an essential part of their function and they are
therefore termed sacrificial
Introduction of ICCPA metal also can be made cathodic by electrically connecting it to another
http://1.bp.blogspot.com/_sxQTbLK7-Rs/SfP9WSjqlUI/AAAAAAAAADM/v3chT7617RI/s1600-h/iccp2.jpg8/12/2019 Practical Knowledge for Marine Engineers
21/67
metallic component in the same electrolyte through a source of direct electric
current. The current flow from this metallic component must be sufficient to
overcome the natural corrosion current. Thus we will direct the current flow to
occur off the surface of added metallic component (anode), into the electrolyte
and onto the metal (cathode).All we need is to measure what the natural corrosion current is. So we add onemore electrodereference cellcompletely passive metal. The potential
difference between the hull and reference cell will form the natural corrosion
current. So another electrodeanode - with a power source is introduced so that
the current flow from this electrode is sufficient to overcome the natural
corrosion current.Because an external current source is employed, this type of protection is
termed 'IMPRESSED CURRENT CATHODIC PROTECTION'.
Cathodic Protection
A source of direct current is required, this is generally obtained from mains
power units that contain a transformer and rectifier.
The magnitude of this current may be automatically controlled in response to a
continuous monitor of the cathode / electrolyte potential or may be manually
controlled after intermittent measurement.
The impressed current anode material is ideally non-consumed by the passage
of current from it into the electrolyte, in practice the materials used are acompromise between this ideal and the cost and physical properties of available
materials. Impressed current anodes are made from graphite, silicon iron, lead
alloys some with platinum dielectrodes, platinised titanium or more exotic
combinations such as platinum clad niobium. The selection of the correct anode
material is critical in the formulation of an effective and economic cathodic
protection schemeGenerally, for a given current demand, less impressed current anodes than
sacrificial anodes are required for protection, as high anode currents are
feasible.
Impressed current systems of cathodic protection are more sophisticated in
http://3.bp.blogspot.com/_sxQTbLK7-Rs/SfP9o_EqXfI/AAAAAAAAADU/VjrSBbeScKM/s1600-h/iccp3.jpg8/12/2019 Practical Knowledge for Marine Engineers
22/67
design than sacrificial systems.
The tipycal elements of ICCP
Control Panel Anodes Reference cell
The interconnection is similar to given picture below:
Although modern hull coatings can provide some protection against corrosion
http://1.bp.blogspot.com/_sxQTbLK7-Rs/SfP-jTvGibI/AAAAAAAAADs/23avaVy2ric/s1600-h/iccp6.jpghttp://3.bp.blogspot.com/_sxQTbLK7-Rs/SfP-Sz0ejlI/AAAAAAAAADk/CzT3C1atAjg/s1600-h/iccp5.jpghttp://1.bp.blogspot.com/_sxQTbLK7-Rs/SfP97exu8LI/AAAAAAAAADc/5ml02MnH-Uk/s1600-h/iccp4.jpghttp://1.bp.blogspot.com/_sxQTbLK7-Rs/SfP-jTvGibI/AAAAAAAAADs/23avaVy2ric/s1600-h/iccp6.jpghttp://3.bp.blogspot.com/_sxQTbLK7-Rs/SfP-Sz0ejlI/AAAAAAAAADk/CzT3C1atAjg/s1600-h/iccp5.jpghttp://1.bp.blogspot.com/_sxQTbLK7-Rs/SfP97exu8LI/AAAAAAAAADc/5ml02MnH-Uk/s1600-h/iccp4.jpghttp://1.bp.blogspot.com/_sxQTbLK7-Rs/SfP-jTvGibI/AAAAAAAAADs/23avaVy2ric/s1600-h/iccp6.jpghttp://3.bp.blogspot.com/_sxQTbLK7-Rs/SfP-Sz0ejlI/AAAAAAAAADk/CzT3C1atAjg/s1600-h/iccp5.jpghttp://1.bp.blogspot.com/_sxQTbLK7-Rs/SfP97exu8LI/AAAAAAAAADc/5ml02MnH-Uk/s1600-h/iccp4.jpg8/12/2019 Practical Knowledge for Marine Engineers
23/67
they seldom offer a complete solution. For this reason, most operators choose to
protect their vessels with a purpose designed impressed current cathodic
protection system.
Using an arrangement of hull mounted anodes and reference cells connected to
a control panel(s), the system produces a more powerful external current tosuppress the natural electro-chemical activity on the wetted surface of the hull.This eliminates the formation of aggressive corrosion cells on the surface of
plates and avoids the problems which can exist where dissimilar metals are
introduced through welding or brought into proximity by other components
such as propellers.
An essential feature of ICCP system is that they constantly monitor theelectrical potential at the seawater/hull interface and carefully adjust the output
to the anodes in relation to this.
Therefore, the system is much more effective and reliable.
Blow-Down Procedure for Marine Boilers
Boiler blow down is done to remove carbon deposits and other impurities from
the boiler. Blow down of the boiler is done to remove two types of impurities
http://www.marineinsight.com/wp-content/uploads/2010/10/boiler.jpghttp://2.bp.blogspot.com/_sxQTbLK7-Rs/SfP-wLO4RNI/AAAAAAAAAD0/ueXejRml1n8/s1600-h/iccp7.jpghttp://www.marineinsight.com/wp-content/uploads/2010/10/boiler.jpghttp://2.bp.blogspot.com/_sxQTbLK7-Rs/SfP-wLO4RNI/AAAAAAAAAD0/ueXejRml1n8/s1600-h/iccp7.jpg8/12/2019 Practical Knowledge for Marine Engineers
24/67
scum and bottom deposits. This means that blow down is done either forscum
or for bottom blow down.Moreover, the reasons for boiler blow down are:
1. To remove the precipitates formed as a result of chemical addition to the
boiler water.
2. To remove solid particles, dirt, foam or oil molecules from the boiler
water. This is mainly done by scum valve and the procedure is known as
scumming.
3. To reduce the density of water by reducing the water level.
4. To remove excess water in case of emergency.
Procedure for Scumming and
Bottom Blow Down
Below is the procedure for
boiler blow down using the
blow down valve located at
the bottom of the boiler. Inorder to do scumming, instead
of bottom blow down, the
scum valve is to be opened.
**WHY TO OPEN V/V 1 FIRST??
TO AVOID THE FULL LINE COMONIG
INTO PR OF BOILER WATER AND
HENCE CHANCE OF FAILURE BCOZ THIS
LINE WITH TIME CORRODES DUE TO
THE NATURE OF SERVICEAND ALSO WE CAN USE A LOW SCHEDULE NO. PIPE LEADING TO
ECONOMICAL SAVING
**2.N/R V/V,,,,3.RETURN TYPE V/V
WHY 2 V/VS 2AND3..2SHOULD BE OPENED FULL TO PREVENT WIRE DRAWING OF ITS SEAT BCOZ
OF HIGH VELOCITY OF WATER(THE PR. HEAD ON WATER CONVERTING INTO VELOCITY DUE TO
THROTTLING OR EXPANSION).HENCE WE ARE NOW LEFT WITH NO OPTION TO FIT A OTHER V/V TO
CONTROL THE QUANTITY OF BLOW DOWN OR RATE OF BLOW DOWN.
http://marineinsight.com/marine-engineering/auxiliary-machinery/boiler-mountings-a-comprehensive-list/http://marineinsight.com/marine-engineering/auxiliary-machinery/boiler-mountings-a-comprehensive-list/http://marineinsight.com/wp-content/uploads/2010/10/blow-down.jpghttp://marineinsight.com/marine-engineering/auxiliary-machinery/boiler-mountings-a-comprehensive-list/http://marineinsight.com/marine-engineering/auxiliary-machinery/boiler-mountings-a-comprehensive-list/8/12/2019 Practical Knowledge for Marine Engineers
25/67
Steps for blow down procedure are as follows:
Kindly refer the diagram to understand the blow down procedure properly.
1. Open the overboard or ship side valve(1) first.
2. Open the blow down valve (2), this valve is a non-return valve.
3. The blow down valve adjacent to the boiler (2) should be opened fully so
as to prevent cutting of the valve seat.
4. The rate of blow down is controlled by the valve (3).
5. After blow down close the valve in reverse order.
6. A hot drain pipe even when all valves are closed indicates a leaking blow
down valve.
BOILER NOTES
Economizers are heat exchangers which are fitted in a boiler to increase the
efficiency of the boiler. This is done by extracting the heat from the exiting gas
and using it to heat the feed water entering the boiler.
INTRODUCTION
To obtain an acceptable degree of efficiency and reduce fuel consumption as
much as possible by introducing further heat recovery surface so that the gas
temperature at the funnel may be as low as practicable, the gas temperature
leaving a boiler cannot be reduced much below 30oC above the saturation
temperature. In radiant types a much higher exit gas temperature is usually
found. To carry out this further heat exchange, surfaces such as economizers
and air heaters are commonly used.
In many radiant boiler types, economizers are also found arranged integrally
within the boiler unit. In this location they consist of a number of multi-loop
elements of plain tubes connected at their ends to inlet and outlet headers.
Since are situated in a hot gas temperature zone and are required to perform a
considerable heat exchange duty, a portion of the water pumped through
them may be converted into steam. These steaming economizers are arranged
8/12/2019 Practical Knowledge for Marine Engineers
26/67
so that water enters the lower header and the steam and water mixture leaves
from the top header to the steam drum where the steam and water separate.
Economizers are used externally to boilers for further heat recovery.
Economizers are found in the cooler gas zone and are fed with watertemperatures around 116
oC or 185
oC depending upon whether the feed cycle
includes high pressure feed heaters after the de-aerator.
BOILER WITH THE ECONOMIZER
INSPECTION ON GAS SIDE:
Before going into economizer inspection, first inspect the gas side of the boiler.
It gives you a clear picture of boiler working condition and the efficiency ofheat transfer surfaces.
1. Check exterior of drums for sign of tube roll, leakage, corrosion, sooterosion and overheating.
2. Condition of outside drum insulation.3. Drum seals for signs of air leakage.4. Inspect drum support for cracks and expansion clearance.5. Check all the blow-down connection for expansion and flexibility of
support.
6. Inspect all piping and valves for leaks.7. Visually check water wall tubes and fins for cracks.8. Check exterior of all tubes for corrosion, carbon-build up, erosion,
blisters and sagging.
9. Inspect tubes at soot blower for sign of steam impingement.10.Check header seals for signs of air leakage.11.Examine exterior of headers for corrosion, erosion, thermal cracking and
condition of insulation.
12.Condition of refractory.
8/12/2019 Practical Knowledge for Marine Engineers
27/67
13.Around the burner assembly check refractory, tube condition andaccumulation of soot or carbon.
14.Check soot blowers for distortion, worn bearings, rubbing of tubes,condition of nozzle cracks, freedom of movement and effectivelubrication.
INSPECTION ON ECONOMIZER:
1. The major problem at the economizer section is low temperaturecorrosion and problems from gas side deposits.
2. Sliding and leaky expansion joints at the casing may allow accumulationof soot with severe acid attack.
3. Inspection of tubes bends by opening the inspection covers needs to becarried out to check these.
4. Uptake area may show cracked expansion bellows sign of acid corrosion.General cleanliness of these areas indicates the combustion performance in
boiler.
Design and Setting of the Marine Boiler Safety Valve
Safety valves are fitted to protect the boiler from the effect of over pressure.
At least two safety valves are fitted to each boiler steam drum, but if there is a
super heater, another safety valve should be fitted on it.
Introduction: Marine Boiler Safety Valves
The pressure setting of the superheater safety valve should be less that the
designed pressure of the boiler, i.e. less than that of the steam drum safety
valve, to ensure flow of steam through the superheater under blow off
conditions. The pressure setting of one steam drum safety valve should be
same as the design pressure of the boiler. The pressure setting of another
safety valve should be 2-3 % more than the designed pressure of the boiler.
Classification of Boiler Safety Valves
There are three types of safety valves used in marine boilers:
http://marineboilers.wordpress.com/2011/05/17/design-and-setting-of-the-marine-boiler-safety-valve/http://marineboilers.wordpress.com/2011/05/17/design-and-setting-of-the-marine-boiler-safety-valve/http://marineboilers.wordpress.com/2011/05/17/design-and-setting-of-the-marine-boiler-safety-valve/8/12/2019 Practical Knowledge for Marine Engineers
28/67
1. Improved high lift safety valve2. Full lift safety valve3. Full bore safety valve
Boiler Safety Valve
Improved High Lift Safety Valve:
1. Wingless valve improves steam flow and reduces risk of seizure.2. Waste steam pressure acting on the piston gives increasing valve lift.3. Special shaped seat deflects steam towards lip on valve and increases
valve lift.
4. The valve lifts, the force to compress the spring increases, so the highervalve lifts the greater the increasing in boiler pressure.
5. Waste steam pressure keeps cylinder in place while piston moves, alsoby having a floating cylinder, seizure risk is reduced.
6. A lip is placed around the valve seat so that when the valve lid lifts,escaping steam is trapped in the annular space around the valve face,
the resultant buildup of pressure acting upon the greater valve lid area
causes the valve to lift sharply. This arrangement gives another
advantage to close the valve cleanly and sharply with very little blow
down effect.
7. The improved high lift safety valve makes use of waste steam pressureto increase the valve lift; this is done by allowing the pressure to act
upon the lower spring carrier which fits within a floating ring so forming
in effect a piston. The pressure acts upon this piston causing it to move
up, helping to compress the spring and so increasing the valve lift.
8. Loose fitting key or pad lock is provided to ensure proper closing ofvalve.
9. Loose pin is provided to secure valve lid and allow thermal expansion.
8/12/2019 Practical Knowledge for Marine Engineers
29/67
10.Adjustment of the valve is carried out by means of a compression nutscrewing down on to the top spring plate.
11.A compression ring is fitted after the final adjustment to ensure nofurther movement takes place.
12.A cap is then fitted over the compression nut and the top of the valvespindle, a cotter is passed through and padlocked to prevent tampering
by unauthorized person.
13.Clearance between this cap, the valve spindle and cotter are such as toprevent the valve being held down externally.
14.Easing gear is fitted so that in the event of an emergency the valve canbe opened by hand to a full lift D to release the boiler pressure.
Valve Area: As = A (1 + Ts / 555)
As- Aggregate area through the seating of valve (mm2) for superheatedsteam.
A-Aggregate area through the seating of valve (mm2) for saturatedsteam.
Ts- Degree of superheated steam in oC.15. Valve Area (As) greater than (A) due to specific volume of steam increases
with increases of temperature at constant pressure and more escape area is
required to avoid accumulation of pressure.
16. The area of valve chest must be at least (1/2) A.
17. The waste steam pipe and steam passage must be at least 1.1 A.
Manual Hand Trying of Boiler Safety Relief Valve:
To check the proper working condition of the boiler safety valve we carry out
the Hand trying out the Boiler Safety valve at regular intervals. The safety
valve is provided with the easing gear which manually lifts the safety valve and
releases the excess pressure in the boiler. When the easing gear is pulled, the
valve will be opened by hand to a full lift of D to release the boiler pressure.Before carrying out the process the boiler safety valve has to be drained.
8/12/2019 Practical Knowledge for Marine Engineers
30/67
Boiler Safety Valve Drain:
Draining of the boiler safety valve is necessary as to prevent any build-up of
water in the pipe line causing head of water to form over the valve lid so
increasing the blow off pressure. So at regular intervals the boiler safety valve
should be drained.
1. Drain pipe must be fitted to the lowest part of the valve chest on thedischarge side of the valve.
2. The pipe should be led clear of the boiler.3. The pipe must have no valve or cock fitted through its length.4. The open drain of the pipe should be regularly checked.5. If the pipe becomes chocked, there is possibility of overloading the valve
due to hydraulic head, or damage due to water hammer.
6. The waste steam pipe of the boiler safety valve should be well securedso that no load of the pipe is on the safety valve, which can be the cause
of additional stress on the valve.
Pressure Setting of the Boiler Safety Valve:
If it is found that the boiler safety relief valve is not lifting at the designed
lifting pressure, manual pressure setting of the boiler safety valve has to be
done for the proper and safe operation of the boiler. The adjustment can be
carried out on this type of valve to give the desired discharge and blow down
characteristic.
1. Safety valve pressure setting can be done from high to low pressure orvice versa.
2. Take necessary personal safety precaution and arrange tools i.e. gaggingtool and master gauges.
3. Slowly raise the boiler pressure and blow off the safety valves manuallyfew times for thermal expansion and to reduce the thermal stress on thevalves.
8/12/2019 Practical Knowledge for Marine Engineers
31/67
4. Then screw down all the safety valves higher than the setting pressure atwhich you are going to set.
5. Raise the boiler steam pressure 2-3 % more than the designed pressureof the boiler, then stop firing and unscrew the first valve slowly, when itblows off at 2-3 % more than the designed pressure then note this
opening and closing pressure of the valve and finally gag it.
6. Raise the boiler pressure at the designed pressure of the boiler andunscrew the 2nd valve, when it blows off at designed pressure then note
this opening pressure and check the closing pressure also. Recheck the
setting pressure and gag the valve.
7. Then set the superheater safety valve lower than the designed pressureof the boiler in same procedure.
8. Finally take out the gagging tools. Pressure setting should be done inpresence of surveyor
Boiler Inspection or Survey Carried Out at Regular Intervals
The boiler is vital equipment on ships. It is used as main propulsion (in steam
ships) and for auxiliary heating in other ships. It is very sensitive and dangerous
equipment, where there should be regular inspections and surveys carried out
to avoid accidents and outages.
BOILER INSPECTION
Introduction
Normally boiler inspection will be carried out onboard the ship by a port state
control and during the dry dock. They are used to carry out the inspection and
see the working condition of the boiler. During the inspection they will conduct
an in-depth analysis of the boiler condition considering various factors to find
the working condition of the boiler. If necessary they will replace damaged
parts of the boiler needed for continued safe operation.
NEED FOR BOILER SURVEY OR INSPECTION
1. Boilers are inspected to maintain the Class requirement.
http://marineboilers.wordpress.com/2011/05/17/boiler-inspection-or-survey-carried-out-at-regular-intervals/http://marineboilers.wordpress.com/2011/05/17/boiler-inspection-or-survey-carried-out-at-regular-intervals/http://marineboilers.wordpress.com/2011/05/17/boiler-inspection-or-survey-carried-out-at-regular-intervals/8/12/2019 Practical Knowledge for Marine Engineers
32/67
2. Regular internal inspection and external examination during such surveyconstitute the preventive maintenance schedule the boiler goes through
to have a safe working condition.
FREQUENCY OF BOILER SURVEY
1. Water tube high pressure boilers are surveyed at two year intervals.2. All other boilers, including exhaust gas boilers, are surveyed at two
yearly intervals until they are eight years old and then surveyed
annually.
PLANNING FOR BOILER SURVEY
1. Confirm time available, manpower, and time required.2. Check before shutting down boiler.3. Check for spares e.g. manhole door joints, gauge glass, packing and
steam joints.
4. Check the tools required e.g. gagging tool, torque spanner, rope, chainblock etc.
5. Check manual for special instruction and past records.6. Steam requirement for the next port should be considered e.g. Tankers
require steam in discharged Port.
7. Briefing to other engineers of work involved.SHUTTING DOWN THE BOILER FOR INSPECTION
Before inspection is to be carried out, the boiler which is firing should be shut
down. These are the steps to be followed before shutting down the boiler for
inspection.
1. Inform the chief engineer and inform the duty officer in the bridge.2. Change over M/E, A/E, and Boiler to diesel oil.3. Top up diesel oil service tank, stop heavy oil and lube oil purifiers.
8/12/2019 Practical Knowledge for Marine Engineers
33/67
4. Stop all tank and tracing steam heating and carry out soot blowing.5. Change over from automation to manual firing of boiler.6. Stop the firing of the boiler and purge boiler for three to five minutes.7. Switch off power and off the circuit breaker for forced draught fan, FO
pump, feed pump, and combustion control panel. Hang necessary
notices.
8. Shut main steam-stop valve and shut all fuel valves to boiler.9. Let the boiler cool down, do not blow down now.10.When the boiler pressure is about 4 bars, carry out blow down.11.When boiler pressure is slightly higher than atmospheric pressure, open
the vent cock to prevent formation of vacuum.
12.Let the boiler cool down.13.Once sufficient cooled, open top manhole door first with all safety
precaution.
14.Mark the nut on the top manhole, slacken the dog-nut, and secure itwith a rope.
15.Knock the manhole door gently, but do not open it as it may containsteam or hot water.
16.Conform nothing coming out; open the door fully with the help ofsecuring rope.
17.Do not open immediately open the bottom door, since the boiler is stillhot and if opened relatively cool current of air will pass through the
boiler causing a thermal shock.
18.Allow further cool down before opening bottom manhole door.19.Open the bottom manhole door with the same precautions and open
the furnace side door also.
20.Ventilate foe period of 12 to 24 hours.
8/12/2019 Practical Knowledge for Marine Engineers
34/67
21.Then check for oxygen, flammable vapour, and toxic gasses.22.If it is safe, prepare for entry.
PREPARATION FOR ENTRY
These are the steps to be carried out before entering the boiler for inspection.
1. Prepare a long rope, wooden plank oxygen analyzer, safety hand lamp,and safety torch attached with rope.
2. Get a pouch to carry tools and keep track of the number of tools to bebrought into boiler.
3. Personnel safety protection wear, e.g. helmet, safety shoes, hand gloves,etc.
4. No extra instruments to be brought in and clear pocket contents as itmay fall into boiler.
5. Keep an emergency breathing apparatus ready.6. Remain in communication and ensure proper lighting.7. Check boiler internals before making an entry, e.g. foothold and
handhold.
Inspection Carried Out In Boiler Superheater and In Steam Drum
SUPER HEATERS
The superheater is a device which converts saturated steam or wet steam to
dry steam, and it is used in driving the lager turbines in the marine propulsion
system. In the superheating process the temperature of the steam is only
raised, keeping the pressure at a constant level.
Superheating process can be done by three methods:
1. Radiant superheating: In this type, the superheating tubes are placeddirectly in the combustion chamber.
http://marineboilers.wordpress.com/2011/05/17/inspection-carried-out-in-boiler-superheater-and-in-steam-drum-2/http://marineboilers.wordpress.com/2011/05/17/inspection-carried-out-in-boiler-superheater-and-in-steam-drum-2/http://marineboilers.wordpress.com/2011/05/17/inspection-carried-out-in-boiler-superheater-and-in-steam-drum-2/8/12/2019 Practical Knowledge for Marine Engineers
35/67
2. Convention superheating: In this type of super heaters the superheatingtubes are placed outside the combustion chamber on the path of the hot
gases.
3. Separately fired: In this type the superheater tubes are placed in theseparate combustion chamber outside the boiler. This is separately fired
to maintain the required temperature of the superheated steam outlet.
In the superheater zone the products of combustion were still at a high
temperature and deposits from impurities in the fuel condensed out on the
tubes, reducing heat transfer and steam temperature. Eventually gas passages
between the tubes would become so badly blocked that the forced draught
fans would be unable to supply sufficient air to the burners, combustionbecome impaired and the fouling condition accelerated. Sodium and vanadium
compounds present in the deposits proved very corrosive to superheater tube
causing frequent repeated failure. Due to the fouled conditions there was a
loss of efficiency and expensive time consuming cleaning routines were
required.
Inspection on Superheater
1. Internal and external examination of heaters.2. Thermal crack at the headers due to high stresses set up across the thick
welded section is possible.
3. Super heater safety valve and stop valve.4. Super heater drains and vents valves and manhole openings to check.5. Efficiency of the screen plates to ascertain these protect headers
from direct heat of furnace.
6. Superheater tubes are also prone to high temperature creep failures andthermal fatigue cracking sudden quenching can cause fatigue failure.
7. Check for deposit accumulation in header.8. Drain valve from headers to examine.
Super Heater Walk-In Spaces:
8/12/2019 Practical Knowledge for Marine Engineers
36/67
1. Supports of horizontal super heater tubes to check for burning away andleave the unit unsupported and cause drainage problems.
2. Super heater support tubes may also crack due to effect of bendingfatigue stresses due to misalignment of tubes in the tube holes.
3. Build-up of deposit is most troublesome defect in super heater. Thesemay result in high furnace pressure, loss of super heater and poor
combustion.
4. Special attention and suspicion to be reserved for tubes through whichthere still exist gas paths as they operate under excessive metal
temperature.
5. Oxide scaling inside or outside may cause tube failure and worst casehydrogen fire when iron burns in steam at above 700*C in exothermic
reaction, and destroys all boiler, economizer and air heater.
Now you have a clear picture on the various inspections carried out on the
marine boiler parts for the safe and efficient working of the boiler.
Inspection carried out in Boiler Superheater and in Steam Drum
Learn how inspection is carried out in boiler steam drum, headers and super-
heater tubes.
INTRODUCTION
The steam drum is one of the important parts of the boiler which acts as the
reservoir for the steam generated and for water required for the boiler. Mainly
all the boiler mountings are mounted on the steam drum and it should possess
sufficient strength to withstand the high temperature and pressure of the
steam generated.
As before, in inspecting the generating tubes, headers, and superheater tubes
of the boiler, the inspection has to be carried out in the boiler steam drum.
Check the steam drum for corrosion, scaling, and pitting:
1. Manhole seats and surface condition.
http://marineboilers.wordpress.com/2011/05/17/inspection-carried-out-in-boiler-superheater-and-in-steam-drum/http://marineboilers.wordpress.com/2011/05/17/inspection-carried-out-in-boiler-superheater-and-in-steam-drum/http://marineboilers.wordpress.com/2011/05/17/inspection-carried-out-in-boiler-superheater-and-in-steam-drum/8/12/2019 Practical Knowledge for Marine Engineers
37/67
2. Condition of all feed, chemical feed, blow down lines and inside pressureparts or chocking, security, and leaks.
3. Check for freedom of expansion of drums and headers.4. Inspect tubes for corrosion, excessive deposits, flare-cracking, and
pitting.
5. Inspect hand-hole plates and stud threads.6. Make a complete waterside examination and check for scale build up as
necessary.
7. Measure thickness of scales by using commercially available gauges.OUTSIDE STEAM DRUM:
1. All internal (removed from drum) checked and tested.2. Feed regulator, feed check valve, water gauge fittings, and drum safety
valves examined. Attention to securing arrangement of seats in valves
covers to valve chest to drum nozzles.
3. Welded connection of drum to casing to check for any possible damagecreating gas leakages.
4. Areas of drum not protected by tubes from heat radiation and shieldedrefractory. Thermal cracking of the refractory material to be checked.
STEAM DRUM
HEADERS
Boiler headers are the water feeders to the generating tubes in boiler. The
headers are connected in between the steam drum and the water drum.
Normally the water from the water drum enters the main headers from there
and many generating tubes are connected where the steam is generated.
Rear and Side Wall Headers:
1. Sufficient doors or handhole plugs to remove for assessment of internalcondition of headers and tubes.
8/12/2019 Practical Knowledge for Marine Engineers
38/67
2. Check for pitting and corrosion of headers, rear walls, floors, roofs, andside wall tubes.
3. Check for casing defects for possible gas or air leakage.Bottom Header:
This contains the furnace tubes and the down comer tubes. A number of
handhole doors is provided for internal inspection and repair to the tubes.
Inspection for deposits of sludge must be carried out during the survey. Regular blowing down from this header will be necessary to keep it clear
of sludge deposits.
Repairs in Marine Boilers
This article discusses the general repairs needed in the marine boiler and how
to repair them directly on board. Some common repairs are leaking of tubes in
both smoke tube and water tube boilers, busting of tubes, and leakages in the
manhole joints.
Introduction
Some of the common repair work carried out on the marine boiler while on
board the ship is plugging of the tubes and replacing the leaky manhole joints.
Other major repairs like the renewal of the damaged tubes and furnace
rebuilding must be carried out in the dry dock. The plugging of the boiler leaky
tube is a temporary repair which must be carried out in order to fire the boiler.
Whatever the situation, and in any condition the boiler must run to supply the
working steam.
When the gasket becomes damaged or gets old, smoke starts to come out of
the boiler in the case of the water tube boiler. In the smoke tube boiler, the
water starts to leak outside the boiler. This must be repaired on board by
replacing the leaky manhole joints.
Replacement of a Leaky Manhole Joint
1. Maintain proper spigot clearance- 1.5 mm to position the door centrallyfor evenly loading the gasket.
http://marineboilers.wordpress.com/2011/05/17/repairs-in-marine-boilers/http://marineboilers.wordpress.com/2011/05/17/repairs-in-marine-boilers/http://marineboilers.wordpress.com/2011/05/17/repairs-in-marine-boilers/8/12/2019 Practical Knowledge for Marine Engineers
39/67
2. Never use an old gasket.3. Do not over strain the door studs, which may stretch.4. Pull-up studs by re-tightening the nut after steam rising or warming up.5. Avoid causing damage to door by holding it by a rope and gently
lowering it inside or taking it out.
6. Mark the dogs and nuts to fit back correctly in the same door.7. Check for wear and tear on the studs and nuts.8. Carefully check the matting/ landing surface for corrosion and erosion
on the door and boiler before reassembling.
Repairs in Smoke Tube Boilers
Procedure for Plugging of a Damaged / Busted Smoke Tube:
1. Hydrostatic testing to mark the leaky tubes.2. Cut the tubes on one end and clear of the tube plate. At the other end
the tube is collapsed inside the tube plate.
3. Pull out the tube from the collapsed end.4. Insert a short tube into the tube plate and weld it in place.5. Lap the spare tapered plugs on both stud ends in the tube plates.6. Insert the tube plugs and tack weld it.7. Alternatively, the plugs can be held in place by a long steel bar threaded
and bolted at both ends.
8. Hydrostatic pressure test to confirm no leaks.9. Flush up the boiler and re-inspect the plugs for leaks under full steam
pressure.
Temporary Repairing Procedureto Rectify the Leakage in Smoke Tube:
1. Stop the burner, allow the boiler to cool and remove the soot.
8/12/2019 Practical Knowledge for Marine Engineers
40/67
2. Allow boiler to depressurize, and open the blow down valve to drain theboiler.
3. Enter the boiler flue box and cut a hole in the side of the relevant smoketube.
4. Clean the rim of the smoke tube with a wire brush.5. Cut a circular plate (15 mm thick) of the same diameter as the smoke
tube and chamfer the top edge to 30 degrees by grinding.
6. Fit the plate into the top of the smoke tube and weld it in position asshown.
7. Enter the boiler furnace and cut a similar hole in this end of the relevantsmoke tube.
8. Repeat steps 4 to 6 for lower plate.9. Refill boiler and check for leaks before start-up.10.Start-up boiler and check for leaks when pressurized.
Note: Any temporary repair to smoke tubes or boiler tubes should receivemore permanent attention as soon as conveniently possible.
Repairs in Water Tube Boiler
Instruction for Plugging / Repair of Water Tube Boiler & Economizer:
1. In case of tube failure, steam pressure has to be removed and the oilburner dismantled.
2. If the leakage is readily visible from the burner hole, the boiler can beemptied and repairs commence.
3. Otherwise, the boiler is given pressure by means of the feed pump. Theposition of the leakage will be indicated by the water flow.
4. This flow may not be visible from the burner hole. If it is not visible,remove the inspection door and enter the furnace. If the tube failure is
still not found, then enter the generating tube section. From here the
8/12/2019 Practical Knowledge for Marine Engineers
41/67
bottom of the membrane walls and generating tubes can be inspected
for leakage.
5. If the leakage has resulted from the membrane walls or generating tube,the inspection door at the smoke connection pipe must be removed, andthe generating tube/ membrane tube in which the failure has occurred is
pointed out.
6. The leakage may also result from economizer.7. By removing the inspection door at the bottom of the economizer, it can
be determined which uptake has caused the leakage?
8. If necessary other inspection doors should be removed to point out thedamage register.
9. When a damaged tube or convection register has been removed, andthe remaining tube studs have been repaired/ plugged a new tube or
register should be mounted as soon as possible.
10.Operation for longer periods with one or more registers missing involvesthe risk of further damage to the boiler due to increasing heat leads on
the parts next to the ones removed.
Scope of Inspection of a ShipsBoiler
The boiler is one of the items of equipment on a ship which continuously keeps
on running during sailing and in port. As it is running continuously, it has to be
cleaned and inspected to check the condition of all internal working parts at
regular intervals.
SCOPE OF INSPECTION
The scope of inspection is to clean the boilers internal surfaces and to check
for corrosion and scale formation in the boiler. As the boiler normally runs
continuously, there are few chances to open the boiler. Thus, during the
inspection all the important checks will be carried out and it will be made sure
that the boiler will safely work without any problems until the next inspection.
Routine inspection is important because salt formation and scaling inside the
http://marineboilers.wordpress.com/2011/05/17/scope-of-inspection-of-a-ships-boiler-2/http://marineboilers.wordpress.com/2011/05/17/scope-of-inspection-of-a-ships-boiler-2/http://marineboilers.wordpress.com/2011/05/17/scope-of-inspection-of-a-ships-boiler-2/http://marineboilers.wordpress.com/2011/05/17/scope-of-inspection-of-a-ships-boiler-2/8/12/2019 Practical Knowledge for Marine Engineers
42/67
boiler tubes will reduce the heat transfer rate and ultimately damage the tubes
due to overheating.
1. The inspection should include finding reasons for any abnormality foundand should also ensure that any repair carried out does not affect thatsafe working order of the boiler.
2. A complete inspection means full internal and external examination ofall parts of the boiler and accessories such as super-heaters, air heaters,
and all mountings.
3. The examination may lead the inspector to require hydraulic testing ofpressure parts or thickness gauging of plate or tubs that appear to be
checked for good working condition.
The Inspection is not completed until the boiler has been examined under
steam and the following items dealt with:
a) Pressure gauge checking against a test gauge.
b) Testing of water level indicators and protective devices.
c) Safety valves adjusted under steam to blow off at the required pressures.
d) The oil fuel burning system examined.
e) Testing of remote control gear for fuel shut off valves.
For a gas fired boiler, the chief engineer floats the safety valve at sea at the
first opportunity. Survey record is not assigned until a statement is received
from chief engineer about the pressure at which the safety valves were set.
Inspection Consists Of:
a) Examination of the items.
b) Statement whether a problem / defect exist.
c) Determining the cause of problem.
d) Define the repair and whether temporary / permanent.
The Main Benefits of Doing Inspection:
8/12/2019 Practical Knowledge for Marine Engineers
43/67
By doing the inspection, we are manually cleaning the boiler scales and
chemical cleaning of the salt formation in the boiler parts and making the
boiler safe for operation. It also helps in checking the redundancy of the stand-
by boiler. During the inspection the newly signed in crew members and the
ships engineer will also have a chance to see the internal parts of boiler.
1. Boiler must be sufficiently cleaned and dried to make a thoroughexamination possible.
2. Boiler should be manually wire-brushed to clean the internal surfaces.3. In case of difficulty in manual cleaning, chemical cleaning with
hydrochloric acid plus inhibitor to prevent acid attacking the metal
without affecting removal of deposits is the best procedure.
4. For oil contamination, alkali boil-out using tri-sodium phosphate solutionis essential prior to acid cleaning. Through water flushing must be
carried out after acid cleaning to avoid acid concentration in crevices
and captive spaces.
5. All internals that may interfere with the inspection have to be removed.6. Wherever adequate visual examination is not possible, surveyor may
have to resort to drilling, ultrasonic, or hydraulic testing.
7. All manhole doors and other doors must be opened for reasonable timeprevious to survey for ventilation.
8. If another boiler is under steam arrangement of locking bar and othersecurity devices must be in position preventing the admission of steam
or hot water to the boiler under survey. The smoke trunking, exhaust gasshut-off etc., must be in position and in proper working condition.
9. Plants staff or repairers staff should stand by the manhole in case ofemergency and to take note for defects/ repairs required.
Before survey, the surveyor should acquaint himself with the boiler type in
question (drawings carried on board) and during the survey it is advisable to
follow a planned routine in order not to miss parts of the boiler or important
items.
8/12/2019 Practical Knowledge for Marine Engineers
44/67
SAFETY VALVES
At least two safety valves have to be fitted to the boiler. They may be both
mounted on a common manifold with a single connection to the boiler. The
safety valve size must not be less than 38mm in diameter and the area of thevalve can be calculated from the following formula C x A x P = 9.81 x H x E
where
H= Total heating surface in m3
E = Evaporative rate in Kg steam per m2of heating surface per hour
P = Working pressure of safety valves in MN/m2absolute
A = Aggregate area through the seating of the valves in mm2
C = the discharge coefficient whose value depends upon the type of valve.
C=4.8 for ordinary spring loaded valves
C=7.2 for high lift spring loaded valves
C= 9.6 for improved high lift spring loaded valves
C= 19.2 for full lift safety valves
C= 30 for full bore relay operated safety valves
LIFT PRESSURE
The safety v/v must be set at a pressure not exceeding 3% of the approved
boiler working pressure. It is normal to set the suphtr safety below that of the
drum to ensure an adequate flow of stm for cooling purposes under fault
conditions. Similarly the superheater should be set to close last.
10% ACCUMULATION OF PRESSURE RULE.
With all the flames in full firing the stm stop is closed, the boiler pressure must
not increase by more than 10% in 7 minutes for water tube of 15 mins for tank
boilers with the safety lifted. this is normally waivered for superheater boilers.
Instead calculations and previous experience used.
BLOWDOWN
http://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/null8/12/2019 Practical Knowledge for Marine Engineers
45/67
The pressure drop below the lifting pressure for a safety v/v is set at 5% by
regulation although it is more normal to set v/v's at 3% to prevent excessive
loss of stm. For boilers with a superheater it is important that the superheater
v/v not only lifts first but closes last. Adjustement of the blowdown may be
necessary following adjustment of the popping setpoint (Increaseing set point
lengthens blowdown). Adjustment is achieved by altering the height of the
'adjusting guide ring' on the full lift safety valve design shown below. Over
raise adjustment of this ring can lead to mal-operation with the valve not fully
opening
SETTING
Must be set with the surveyor present except when on the waste heat unit. A
chief engineer with three years experience may then set the safety valve but
must submit information to surveyor for issue of certificate.
Superheated steam safety valves should be set as close to operating
temperature as possible as expansion can alter the relationships between
valve trim and guide/nozzle rings which can effect the correct operation of the
valve.
1. Two safety valves- each set independently2. Each safety valve must release entire steam flow in pressure
accumulation test
3. Surveyor uses specially checked gauge4. One valve gagged5. valve initially set to approximately the correct position then steam
pressure increased to set pressure
6. adjust valve to lift7. raise and lower pressure to check8. fit locks to both valves on completion
http://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://www.blogger.com/nullhttp://ww