Contents
Introduction of Taguchi
Definition
Six sigma
Steps of Robust Design
Advantages and disadvantages
Case studies-
Conclusion
7/30/2019 Ppt of Taguchis
4/16
Dr Genichi Taguchi was born
in 1924.
Experimental designtechniques
His method has changed the
face of Industrial
Management
The West Surpassed Japanese
quality
7/30/2019 Ppt of Taguchis
5/16
Definition of Quality Engineering
A discipline that deals with the analysis of
a manufacturing system at all stages, toimprove the quality of the productionprocess and of its output.
7/30/2019 Ppt of Taguchis
6/16
Six Sigma Has Two Project Methodologies
7/30/2019 Ppt of Taguchis
7/16
STEPS IN ROBUST DESIGN
7/30/2019 Ppt of Taguchis
8/16
Reduces variation in parts.
Lower quality parts
More appeal to the
customer.
Robustness into the product
and process
7/30/2019 Ppt of Taguchis
9/16
Case Studies
7/30/2019 Ppt of Taguchis
10/16
7/30/2019 Ppt of Taguchis
11/16
To improve business processes, Nissan
investigated production unit to improvethe efficiency of the energytransformation to the brake pad.
Based on success of Taguchisimplementation, Nissan's executivedecided that, they should apply Taguchis.
Using dynamic characteristics, Nissanimproves the efficiency of the energytransformation to the brake pad.
Overall weight of the brake system wasreduced and producing time was reduced
to 4% of the original time.Nissan technical centre conducts 70 projects
annually, all using dynamiccharacteristics.
7/30/2019 Ppt of Taguchis
12/16
Kodaks copy machine manufacturingdivision was faced with improvingthe reliability of its paper feeder
The Robust Design method provideddrastic improvement in the methodfor evaluating the failure rate
compared to the traditional way offeeding tens of thousands ofsheets, which was very expensiveand time consuming. Instead ofobserving the failures, the teamobserved the time needed for a
sheet of paper to reach a sensorafter the feed command is issued.
7/30/2019 Ppt of Taguchis
13/16
The arrival time is affected by the noise factors
such as weight of the paper, smoothness,
humidity, etc. If the arrival time is outside the
design window, it causes feeding failure. Thus,
a design that reduces the variation of the
arrival time causes fewer failures.
Measurement of arrival time needed newinstrumentation. But, the time for evaluating a
design reduced from weeks to about one hour.
Indeed, the Robust Design method uses a
measurement system focused on the main
function instead of measuring defects.
7/30/2019 Ppt of Taguchis
14/16
7/30/2019 Ppt of Taguchis
15/16
7/30/2019 Ppt of Taguchis
16/16
Team Members
Shrawanti Talla 744
Dharti Parmar 727
Sneha Arolkar 695
Rabab Suratwala 743
Karishma Karothiya 715
Harsha Sanap 736Monika Patil 731