Power Boat Project DDP Honors. Team B Period 2. Sketches are complete Thumbnail and Annotated. Mock-ups have been fabricated and tested. Decision Matrix is complete Selecting an Approach. CAD Models are being finished. Center of Gravity has been calculated. - PowerPoint PPT Presentation

Transcript of Power Boat Project DDP Honors

Power Boat ProjectPower Boat ProjectDDP HonorsDDP Honors

Team BTeam BPeriod 2Period 2

Sketches are completeSketches are completeThumbnail and AnnotatedThumbnail and Annotated

Mock-ups have been fabricated and Mock-ups have been fabricated and testedtested

Decision Matrix is completeDecision Matrix is completeSelecting an ApproachSelecting an Approach

CAD Models are being CAD Models are being finishedfinished

Center of Gravity has been calculatedCenter of Gravity has been calculated

Hulls have been 3D printedHulls have been 3D printed(Rapid prototyping)(Rapid prototyping)

Decks, Cabins, and Power parts Decks, Cabins, and Power parts are currently being assembled.are currently being assembled.

I invite you down to watch any of the following:I invite you down to watch any of the following:

• Team PowerPoints and Time TrialsTeam PowerPoints and Time TrialsTuesday 6/5/12 - Periods 6, 7, and 8 – Room 154Tuesday 6/5/12 - Periods 6, 7, and 8 – Room 154

• Race DayRace DayFriday 6/8/12 - Periods 6, 7, and 8 – Room 154Friday 6/8/12 - Periods 6, 7, and 8 – Room 154