SAMES KREMLIN Siège Social et Etablissement principal : 13, chemin de Malacher - CS70086 - 38243 Meylan Cedex FranceSAS au capital de 12.720.000 euros | RCS Grenoble : 572 051 688 | Code : APE 2829B | TVA intracom : FR36 572051688Tél. : +33 (0)4 76 41 60 60 | Fax : +33 (0)4 76 41 60 90 | info@sames-kremlin.com | www.sames-kremlin.comEtablissement de Stains: 150, avenue de Stalingrad - CS60001 - 93245 Stains Cedex France | Tél.: +33 (0)1 49 40 25 25 | Fax : +33(0)1 48 26 07 16
Société d’EXEL Industries
LINE AUDITSPowder and liquid technical analysis
Inscribed in a technical support program for our customers using SAMES KREMLIN equipment in electrostatic powdering and painting, the line audit approach is designed to help you optimize and control your production process.Our network of SAMES KREMLIN experts is continuously trained and qualified to provide our customers with technical expertise on powder or liquid installations in which our equipment is integrated. The overall environment of your production line will be taken into account in this technical survey.
Line audit visits allow to:
• Identify critical points that may affect the reliability or mechanical integrity of the SAMES KREMLIN equipment;
• Identify and contain any changes of the system from its original operating;• Identify all wear parts and first emergency parts necessary for the continuity of your
production;• Develop a Preventive Maintenance Plan* (P.M.P.) personalized and adapted to your
production environment;• Provide on site technical advice appropriate to the situation and define training allowing a
professionalisation of your operating staff;• Identify corrective actions and their degree of urgency.
Line audit visits are scheduled in accordance with your production so as not to disrupt it. The audit of lines is above all a technical assistance.
To allow you to maintain sustainable technical performance of your production equipment in an industrial environment constantly changing and benefit from our expertise over time, SAMES KREMLIN also provides preventive maintenance contracts..
(*) Preventive Maintenance Plan (P.M.P.): Issued from SAMES KREMLIN technical instructions, the Preventive Maintenance Plan identifies for each subassembly constituting a specific installation, operations monitoring and verification to achieve depending an accurate periodicity.
What controls do we realise on your facilities?Proposed technical services
manual and automatic paint sprayers (new and old generation) inspection of the following points:• general condition of the device;• wear and cleanliness of bell cups;• sealing of quick disconnect plate
and condition of O-rings;• injector fouling;• presence of paint return in the air
chambers of the turbines;• sealing of pneumatic, paint and
solvent connections;• Spraying parameters (current
consumption, high voltage, fault history and safety parameters on high voltage generator GNM200).
We verify ...
We found that in 95% of the cases, the internal preventive maintenance of the robots (reciprocators) was not carried out. During a production shutdown, we propose to open the covers to check the mechanical components of the RFV robots, the mechanical adjustment and to check the following points:• the main and secondary chain tension;• wear of the upper wheel gear and motor gear;• lubrication, seizing and wear of chains;• Load balancing;• the mechanical position of the median stroke ;• mechanical clearance of the trolley and counterweight rollers;• status of connections; • grounding of the frame and the equipment potentiality of the tubular structures.
your daily production in the presence of the drivers of line to analyze together the possible problems encountered and offer you solutions for improvement and optimization of performance. These visual controls can be supplemented if necessary by measurements of earth continuity between the conveyor and the parts to be painted, high-voltage measurements and control of the airflow in the cabin using regularly calibrated equipment.
manual and automatic powder projectors (new and old generation) and visually perform the following checkpoints:• general condition of the device;• fouling of high-voltage nozzles and
contact points;• wear of the nozzles and deflectors;• status of the electrical connection;• sealing of pneumatic and powder
connections;• wear of powder pipes;• spraying parameters (current
consumption, high voltage clipping, injection and dilution values);
• the stroke of the projectors and the covering of the parts.
We control ...
We will follow with you ...
We share with you our experience!
High voltagegeneratorGNM200
ModuleCRN457
LIQUID
POWDER
High voltage unitUHT108
Connection box
Automatic powder projectorMach-jet FCC
Atomizer with rotative bell cupPPH308
Electrostatic gun wiht cableTRP501 00D
HV measuring deviceHVP 125/500
GNM 200
HV
P-12
5
NOT FOR USE IN HAZARDOUS ATMOPHERE
NE PAS UTILISER EN ATMOSPHERE EXPLOSIVE
FOFOR USE INE IN HAZARDOUS ATS ATMOPHER
FOFOR UUSE IN HAAZARDOUS AATMOPHER
FFFF
1 2 3 4
S l a v e : 1S p e e d : 9 6 0 0 G
E V A n n e x e : 0H T K e y b o a r d : 0
0/1
RollerHanging trolleyTrolley guideRotation drive chain
Sprocket wheel of rotation
Bearing
Anti-spraying flap
Gas bottle to be painted
Gas bottle hanging tools
Powder turbine Inobell
Fixed automatic powder projectorMach-jet
RECOMMENDEDMAXIMUM VALUE RECOMMENDED
MAXIMUM VALUE
Conveyor structure
HA
NG
ING
TO
PH
AN
GIN
G L
OW
ER
LIM
IT O
F PR
OTE
CTI
ON
PRO
FIL
BO
OTH
Rail conveyor
ChainHolding pin
BR
US
HIN
G A
RE
A
Holding pin
Hook axis
Hook
Extension arm
Roller bracket assemblyRoller
C1
C5
C4
C6
C8
C9
C7
C2
C3C2
C3
C1
C4
C5
<1MΩ500V
<1MΩ500V
<1MΩ500V
Dial conveyor:5 minimum contact pointsmaterialized by C1 to C5
Chain-to-trolley conveyor:9 minimum contact pointsmaterialized by C1 to C9
Expertise of equipment
High voltage measurement
Grounding continuity measurement
A R C T I C O C E A NA R C T I C O C E A NA R C T I CO C E A N
S O U T H E R N O C E A N
N O R T H
A T L A N T I C
O C E A N
N O R T H
P A C I F I C
O C E A N
S O U T H
P A C I F I C
O C E A N
I N D I A N
O C E A NS O U T H
A T L A N T I C
O C E A N
Black Sea
PhilippineSea
Coral Sea
TasmanSea
Bay ofBengal
SouthChinaSea
Sea ofJapan
Arabian Sea
Beaufort Sea
Caribbean Sea
Gulf ofMexico
LabradorSea
HudsonBay
CaspianSea
BaffinBay
Gulf ofAlaska
RedSea
Sea ofOkhotsk
Mediterranean Sea
CelebesSea
NorwegianSea
GreenlandSea
Banda Sea
MozambiqueChannel
Scotia Sea
Barents Sea
NorthSea
Java Sea
AndamanSea
YellowSea
EastChinaSea
ChukchiSea
ArafuraSeaTimor Sea
Gulf ofThailand
Kara Sea Laptev SeaEast Siberian Sea
DrakePassage
BeringSea
SargassoSea
GreatAustralian
Bight
Gulf of Aden
Gulf of Oman
BismarckSea
SolomonSea
Gulf of Maine
GreatBarrier
Reef
AFGHANISTAN
ANGOLA
UNITEDARAB
EMIRATES
ARGENTINA
AUSTRALIA
AZER-BAIJAN
BENIN
BURKINAFASO
BULGARIA
BELARUS
BOLIVIA
BRAZIL
BHUTAN
BOTSWANA
CENTRALAFRICANREPUBLIC
CANADA
CHILE
CHINA
IVORYCOAST
CAMEROON
DEMOCRATICREPUBLIC OFTHE CONGO
REPUBLICOF CONGO
COLOMBIA
COSTARICA
CUBA
GERMANY
ALGERIA
ECUADOR
EGYPT
ERITREA
SPAIN
ESTONIA
ETHIOPIA
FINLAND
FIJI
FRANCE
GABON
UNITEDKINGDOM
GEORGIA
GHANA
GUINEA
GREECE
GREENLAND
GUYANA
HONDURAS
INDONESIA
INDIA
IRELAND
IRANIRAQ
ICELAND
ITALY
JORDAN
JAPAN
KAZAKHSTAN
KENYA
KYRGYZSTAN
CAMBODIA
SOUTHKOREA
LAOS
LIBERIA
LIBYA
SRI LANKA
LITHUANIA
LATVIA
MOROCCO
MADAGASCAR
MEXICO
MALI
MYANMAR
MONGOLIA
MOZAMBIQUE
MAURITANIA
MALAYSIA
NAMIBIA
NIGER
NIGERIA
NICARAGUA
NORWAY
NEPAL
NEWZEALAND
OMAN
PAKISTAN
PANAMA
PERU
PAPUANEW
GUINEA
POLAND
NORTHKOREA
PARAGUAY
ROMANIA
RUSSIAN FEDERATION
WESTERNSAHARA SAUDI
ARABIA
SUDAN
SOUTHSUDAN
SENEGAL
SIERRALEONE
SOMALI-LAND
SOMALIA
SERBIA
SURI-NAME
FRENCHGUIANA
SLOVAKIA
SWEDEN
SYRIA
CHADTHAILAND
TAJIKISTANTURKMENISTAN
TUNISIA
TURKEY
TANZANIA
UGANDA
UKRAINE
URUGUAY
UNITED STATESOF AMERICA
UZBEKISTAN
VENEZUELA
VIETNAM
YEMEN
SOUTHAFRICA
ZAMBIA
ZIMBABWE
ARUBA
ANGUILLA
ALAND
ANDORRA
ARMENIA
ANTIGUA AND BARBUDA
BURUNDI
BANGLADESH
BAHRAIN
THEBAHAMAS
MIAMI
BOSNIA ANDHERZEGOVINA
SAINT BARTHELEMYBELIZE
BERMUDA
HAWAIIANISLANDS
BARBADOS
BRUNEI
SWITZERLAND
COMOROS
CAPEVERDE
CURAÇAO
CAYMANISLANDS
CYPRUS
DJIBOUTI
DOMINICA
DENMARK
FEDERATED STATESOF MICRONESIA
GAMBIA
GUINEA BISSAU
EQUATORIAL GUINEA
GRENADA
HAITI
BRITISH INDIANOCEAN TERRITORY
ISRAEL
JAMAICA
SAINT KITTS AND NEVIS
KUWAIT
LEBANON
SAINT LUCIA
LIECHTENSTEIN
LESOTHO
LUXEMBOURG
MACAU
SAINT MARTIN GUADELOUPE
MONACO
MOLDOVA
MALDIVES
MALTA
MONTENEGRO
MONTSERRAT
MAURITIUS
MALAWI
NEWCALEDONIA
PHILIPPINES
PALAU
PUERTO RICO
PORTUGAL
PALESTINE
QATAR
RWANDA
SINGAPORE
SOLOMONISLANDS
EL SALVADOR
SANMARINO
SAINT PIERREAND MIQUELON
SAO TOME AND PRINCIPE
SLOVENIA
SWAZILAND
MARTINIQUE
SEYCHELLES
TURKS AND CAICOS ISLANDS
TOGO
EAST TIMOR
TRINIDAD AND TOBAGO
TAIWAN
VATICAN
SAINT VINCENT AND THE GRENADINES
BRITISH VIRGIN ISLANDS
VIRGIN ISLANDSANTILLES
VANUATU
GUATEMALA
DOMINICANREPUBLIC
HUNGARY
CROATIA
CZECHREPUBLIC
AUSTRIA
ALBANIA
MACEDONIAKOSOVO
BELGIUM
NETHER-LANDS
HONG KONG
SAMES KREMLIN13, chemin de MalacherCS70086 - 38243 Meylan Cedex FrancePh: +33 (0)4 76 41 60 60 | Fax: +33 (0)4 76 41 60 90 www.sames-kremlin.com
Edite
d 1
2/03
/201
8 by
: C
. Bai
llet -
Cus
tom
er S
uppo
rt Se
rvic
e V
alid
ated
by
D. B
roto
ns /
S. R
osse
tto /
P. P
oirie
r
Price scale of audit services.EndUser price World grid by geographical area
Geographical area Mission proposed
End User Price
for 1 day (€ HT)
End User Price
Addit. day (€ HT)
Additional costs
Hotel / Catering / Transport
Direct customer France1 audit day on customer plant during day shift (8:30 AM to 5:00 PM, except weekends and public holidays).
1 000 800 IncludedSubsidiary area EMEA 2 000 1 000 Included
Subsidiary area Rest of the world 2 000 1 000 To be
added