PORTOLA MIDDLE SCHOOL PROJECT STATUS PRESENTATIONM 31 2014May 31, 2014
School DesignerDesign AwardsDesign Awards
Bronze Award: Library/Media Center
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
BUILDING C BUILDING D
BUILDING ABUILDING B
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
LOWER LEVEL –PHYSICAL ACTIVITY
BUILDING D
BUILDING C
BUILDING D
BUILDING ABUILDING B
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
MID-LEVELENTRY AND ACADEMIC
BUILDING D
BUILDING C
BUILDING D
BUILDING ABUILDING B
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
UPPER LEVELARTS / MULTI-USE
BUILDING D
BUILDING C
BUILDING D
BUILDING ABUILDING B
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
BUILDING AORIGINAL CLASSROOM BUILDINGBUILDING
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
BUILDING BNEW GYM / ADMIN / LIBRARYLIBRARY
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
BUILDING CNEW CLASSROOM BUILDINGBUILDING
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
BUILDING DNEW MULTI-PURPOSEBUILDINGBUILDING
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
SCHEDULE
Complete Construction– Outfit FF&E
CURRENT CONTRACT
Today – Dec 2015
Renovate Temp Campus for Fairmont J 2016 A 2016
Move‐in –March/April 2016
Outfit FF&EJan 2016 – March 2016
June 2016 ‐ Aug 2016
POTENTIAL BEST CASE
Complete Construction–Today – Oct 2015
Move‐in –
Outfit FF&ENov 2015 – Dec 2015
POTENTIAL BEST CASE
Jan/Feb 2016Renovate Temp Campus for Fairmont March 2016 ‐May 2016
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
FAIRMONT ELEMENTARY SCHOOL
Leroy F. Green Design Awards
Award of Merit
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
CURRENT CAMPUS
• 55 year old campus
• 2.95 acres
• 38,500 S.F. of Buildings
• 580 Pre‐K through 6th grade enrollment in 2013‐2014
• 24 classrooms
• Administration, Kindergarten classrooms and Library areclassrooms, and Library are undersized.
• Special Education classrooms are inadequate.
• Staff parking used by Public Library and Senior Center
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
PROGRAM NEEDS
• Increase in Enrollment up to 611 students
• 10% Special Ed. – appropriate spaces needed
• Increase in classrooms required• Increase in classrooms required
• Flexible Multi‐Use spaces required
• Larger Multi‐Purpose & Administration
• More kindergarten classrooms• More kindergarten classrooms
• Maintain existing play area
• Improve Sp. Ed Bus Pick‐Up / Drop‐off
• Improve control of campus entry pointsImprove control of campus entry points
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
CHALLENGES
• Small site
• Site orientation – classroomSite orientation classroom daylighting
• BART noise
• Pick‐up and drop‐ off congestion
• Separating Public library and Senior Center from campus
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
BUILDING SECTION
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
PROGRAM DRIVEN REPLACEMENT CAMPUSCAMPUS
• 3.23 acres
• 75,973 S.F.
• 611 Pre‐K through 6th grade enrollment
• 34 classrooms
• Administration controls campus points of entry
• Sp Ed classrooms size• Sp. Ed. classrooms ‐ size increased to 1,450 S.F. District Standard
• Two Multi‐Purpose rooms for instructional Flexibility.
• Outdoor learning spaces
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
CLASSROOM WING
• 960 S.F. classrooms following District standards.
• 18 foot long teaching wall
• Ceiling mounted projector & pull down screen
• 4 computer stations
• Tall operable windows
• Classrooms meet CHPS criteria
STANDARD CLASSROOM
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
SPECIAL ED. CLASSROOMS
• Three 1,450 S.F. classrooms with changing room, showers, laundry, restroom, and office/storage area.
• Pre-K, Primary and Secondary Severely Handicappedpp
• Learning Center• Speech• Full Inclusion / ICHAT• Occupational Therapy
STANDARD SPECIAL ED CLASSROOM
Occupational Therapy
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
KINDERGARTEN WING
• 4 classrooms @ 1,450 S.F.; i l d h d k
SHARED WORKROOM
includes shared workspace, storage and student restrooms
• 18 foot long teaching wall
• High sloped ceilings forHigh sloped ceilings for daylighting and ventilation.
STANDARD KINDERGARTEN
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
MULTI-PURPOSE BUILDING
• 8,513 S.F.
• Kitchen / Community kitchen
MULTI-PURPOSE ROOM STAGE
• Kitchen / Community kitchen
• Speedline
• Stage with access ramp
• Table / Chair Storage
KITCHEN
• Table / Chair Storage
• Lobby
• Outdoor Eating Area
LOBBY
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
ADMINISTRATION WING
• Control of visitors enteringControl of visitors entering campus.
• Administration on ground floor.
• Community Clinic, Parents’
GROUND
Workroom, and Staff Lounge on second floor.
SECOND
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
S CON
LIBRARY
• 2,800 S.F. state‐of‐the‐art Library / media center
• Story area with built in seating
C t il
MEDIACENTER
• Computer area easily supervised
• Ceiling mounted projection screen
WORK ROOM STOR
• Centrally located
• Flexibility
WORK ROOM STOR.
LIBRARY
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
SITE FEATURES
• Fully accessible site
• Tactile learning panels at all classroom entries
• Making use of outdoor spaces l ias learning areas
• Emphasis on local history & ecosystems
• Daylighting circulation – bothDaylighting circulation both floors Classroom wing
• Community Garden
• Design meets CHPS requirements
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
SCHEDULE
Complete Design –
Bidding –
May – Sept 2014
Permit ‐WCCUSD QA/QCOct 2014 – Sept 2015
Bidding May 2016 – Sept 2016
Construction –Sept 2016 – Sept 2018
Renovate Temp Campus for Fairmont June 2016 – Aug 2016
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.
Thank you!
P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014
HIBSER YAMAUCHIARCHITECTS, INC.