ARCHITECTURE AND

SUSTAINABILITY CONSULTANT PORTFOLIOPAOLA VALENCIA

2012-2013 MSc Environmental Design & Engineering,

The Bartlett School of Graduate Studies / UCL, London.

2012 Arcola Theatre, Hackney, London

Sustainability consultant internship

2009-2012 E2 Arquitectura e Ingeniería (Chile)

Sustainability Consultant,.

2004 – 2008 A.R.E. ARCHITECTS (Chile) Architect project manager and junior Sustainability Consultant

2002-2003 ARBOL COLOR Architects (Chile)Architecture and construction

2000-2002 Freelance experience Architecture, sustainability consultant and academic experience.

1994-2000 Bachelor in Architecture and Planning Degree Central University of Chile.

CONTENT

2012-2013 MSc Environmental Design & Engineering,

The Bartlett School of Graduate Studies / UCL

ABSTRACT -

 

The present study analyzes the residential energy efficiency (EE) policy of the UK and Chile, which were introduced several years apart. It attempts to identify possible contributions from the UK experience to the Chilean process. Initially we discuss the history of the UK and the Chilean building and energy institutional framework, policy and the building regulations regarding energy efficiency. The next step was to develop a comparative analysis of their policy and the first plan implemented in each country.

The analysis results show that although the UK historic process of the institutional framework and its policy implementation has been complex, the policy structure is cleared than the Chilean. The latter has some measures but it has lacks a clear policy to organize those measures as well as programs. In addition, the Chilean residential energy efficiency policy has a lack of incentives for middle class and also for energy suppliers to implement energy efficiency measures in residential buildings, to contribute with the fulfilment of the national targets. On the other hand, initiatives related to implement renewable energy in residential buildings, are not mentioned in the Chilean EE plan, although there are some programs of solar thermal energy already implemented.

Finally, a new programme is proposed and evaluated, to commit energy suppliers to implement an economical instrument to encourage the installation of energy efficiency measures in middle-class homes. This programme is specifically focusing on implementing solar thermal energy for hot water in residential buildings. This could have a positive impact in the gas consumption reduction, since 78% of gas is imported and the current Chilean energy problem is the energy dependence or energy security, and also could collaborate to achieve the national energy reduction target.

Dissertation“Lessons learned from the UK Residential Energy Efficiency Policy

and how these can help develop the Chilean approach

Solar Design Coursework

Advanced Simulation Coursework

Natural ventilation Coursework

2012 Arcola Theatre (UK)Sustainability Consultant internship,

Developed thermal and lighting modelling

2009-2012 E2 Arquitectura e Ingeniería (Chile)Sustainability Consultant, thermal modelling and solar energy

assessments

MURUA HOUSE

Area : 240 m2.Site : Chicureo, Chile.Architect : Benjamín MuruaProject date : 2013Consulting date : 2013

MAC BUILDING

Area : 2500 m2.Site : Santiago, Chile.Project date : 2012Consulting date : 2012

RINCONADA HOUSE

Area : 480 m2.Site : Los andes, Chile.Architect : Andrea AguileraProject date : 2011Consulting date : 2011

CARRASCO HOUSE

Area : 300 m2.Site : Santiago, Chile.Architect : Cristían ValdesProject date : 2011Consulting date : 2011

UAUY HOUSE

Area : 510 m2.Site : Los andes, Chile.Architect : Angel Muñoz.Project date : 2011Consulting date : 2011

CELULOSA ARAUCO EXTENSION CENTER Area : 100 m2.Site : Valdivia, Chile.Architect : Recrea Architects.Project date : 2011Consulting date : 2011

PISO ZONA DETALLE Caso 1 Caso 2 Caso 3 Caso 4 Caso 5Piso 1 7,69 5,77 5,76 5,00 5,00

Z 1 Living-comedor 2,08 1,87 1,90 1,80 1,80 Z 7 Cocina 1,24 0,86 0,84 0,72 0,72

Piso 2 5,06 3,88 3,67 3,26 3,37Z 7 Dormitorio Principal 1,92 1,51 1,38 1,26 1,36Z 12 Estar 0,9 0,67 0,67 0,61 0,61Z 1 Escritorio 0,9 0,33 0,67 0,57 0,57

CALEFACCIÓN - KW

URMENETA HOUSE

Area : 480 m2.Site : Santiago, Chile.Architect : Francisca Vergara.Project date : 2011Consulting date : 2011

COMEDOR

0

100

200

300

400

500

Fachada Norte Fachada Sur Fachada Oriente Fachada Poniente

MONTSANTO CASINO AND DRESSING

Area : 910 m2.Site : Graneros, Chile.Architect : Moena & Croxatto ArchitectsProject date : 2010Consulting date : 2010

Piso32%

Cubierta27%

Fachada Sur18%

Fachada Norte15%

Fachada Oriente8%

Piso Cubierta Fachada Sur Fachada Norte Fachada Oriente

UNIFRUTTI CASINO AND DRESSING

Area : 1300 m2.Site : Linderos, Chile.Architect : Moena & Croxatto ArchitectsProject date : 2011Consulting date : 2011

VIGUERA HOUSE

Area : 300 m2Site : Zapallar, Chile.Architect : G4 ArchitectsProject date : 2010Consulting date : 2010

CELULOSA ARAUCOPUBLIC OFFICE

Area : 300 m2Site : Valdivia, ChileArchitect : Recrea Architects Project date : 2010Consulting date : 2010

AERIAL ARTS CENTRE

Area : 600 m2Site : La Reina, SantiagoArchitects : DX ArchitectsProject date : 2009Consulting date : 2009

CAROCA-MAIRA HOUSE

Area : 200 m2Site : Valdivia, ChileArchitect : Recrea Architects Project date : 2009Consulting date : 2009

Solar energy projects E2 ARCHITECTURE

Client : Real Estate Investment Fund Vallenar

Consulting date : 2009

Installation Type : Thermosyphon, Law 20.365.-

Project 1 : Vallenar

Number of houses : 110 Houses

Aporte energia versus consumo

0,00

5,00

10,00

15,00

20,00

25,00

ene feb mar abr may jun jul ago sep oct nov dic

Meses

MJ/

m2 Energía necesaria consumo

Energía solar

Client : EBCO Real Estate Year of Consulting : 2009 Installation Type : Thermosyphon, Law N°20.365.-

Project 1 : San AlbertoNumber of houses: 506 Housing

Project 2 : Puerta SurNumber of houses : 250 Housing

SUSTENTA BIT III magazine , December 2009.“Solar and social energy”

PUBLICATIONS

E2 ARCHITECTURE

REVISTA EMB CONSTRUCCIÓN, November 2009,“ Green Building, The trend is here to stay ”

2004 – 2008 Sustainability Consultant, thermal modelling

and solar energy assessments

ARE ARCHITECTS

Demanda Energética Estimada

0

500

1000

1500

2000

2500

Ener

gía

Cal

efac

ción [kW

h/m

es]...........

Pérdidas Térmicas Ganancias Térmicas

RUIZ-TAGLE HOUSE

Area : 240 m2Architect : Rodrigo BardiSite : Santiago, ChileProject year : 2008Consulting year : 2008

Demanda Energética Estimada

0

500

1000

1500

2000

2500

3000

Ener

gía

Cal

efac

ción [kW

h/m

es]...........

Pérdidas Térmicas Ganancias Térmicas

RUIZ HOUSE

Area : 330 m2.Project year : 2008Consulting year : 2008

Architects : G4 architects

Site : Zapallar, Chile

VALDES HOUSE

Surface Area : 200 m2.Project year : 2008Consulting year : 2008

ALVAREZ HOUSE

Area : 200 m2.Site : Santiago, Chile.Architect : Iván Alvarez R.Project year : 2007Consulting year : 2007

Nombre del P royec to

DA T OS DE E NT R A DAUbicación P royecto T emperatura bas e [°C ] E s tación (V infiltrado) P lanta [m2] Altura Muros [m]

S antiago 15,5 Invierno 1,5 [m3] 70 5

C Á L C UL O P É R DIDA SQ Muros [W/°C ] Q ventanas [W/°C ] Q T echos [W/°C ] Q P is os [W/°C ] Q convección [W/°C ] Q T OT A L [W/°C ]

117,58 148,03 44,17 40,20 188,13 538,10

Mes P érdidas G anancias D iferenciaE nero 337,79 2458,32 -2120,53F ebrero 363,86 2615,22 -2251,35Marzo 487,92 2567,01 -2079,09Abril 946,79 1969,48 -1022,69Mayo 2039,27 1561,93 477,34J unio 2130,88 1143,46 987,42J ulio 2672,32 1409,16 1263,16Agos to 2089,31 1668,96 420,35S eptiembre 1600,58 1979,63 -379,05O ctubre 938,31 2470,03 -1531,72Noviembre 569,04 2807,20 -2238,16Diciembre 447,89 3006,60 -2558,72

Mes es a C alefac c ionar De Mayo a A g os to NOT A 1

Q R adiación [kWh] Q E quipos [kWh] Q T OT A L [kWh]5783,5 0,0 5783,5

Q C onducción [kWh] Q C onvección [kWh] Q T OT A L [kWh]5809,2 3122,6 8931,8

3148 [kWh]

146

C ons umo [kWh/m2] 21,6 NOT A 2

ANÁL IS IS TÉ R MIC O DE INVIE R NO

E NE R G ÍA A NUA L R E QUE R IDA P A R A C A L E F A C C IÓN

C ONS UMO A NUA L DE E NE R G ÍA P OR M2

S uperfic ie Habitable de la vivienda [m 2]

C as a T ipo V

P E R IODO DE C AL E F AC C IÓN

C urva de requerimiento energético

R E S UME N DE P É R DIDA S

R E S UME N DE G A NA NC IA S

Demanda Energética Estimada

0500

100015002000250030003500

En

erg

ía C

ale

fa

cc

ión

[k

Wh

/me

s]..

....

....

.

Pérdidas Térmicas Ganancias Térmicas

2004 – 2008 Architecture and construction ARE ARCHITECTS

MARKETING MANAGEMENT OFFICE

Area : 500 m2. Site : Santiago, Chile. Client : Coca-Cola Chile Project area : 2008

OPERATIONS MANAGEMENT OFFICE

Area : 400 m2.Site : Santiago, Chile. Client : Coca-Cola Chile Project year : 2008

LA RABIDA HOUSING

Area : 760 m2.Site : Santiago, Chile. Project year : 2007

BOTTLE BLOWING ROOM

Area : 600 m2.Site : Santiago, Chile. Client : Coca-Cola ChileProject year: 2007Construction year : 2007

SERVICE STATION SHELL – MALL AUTOPLAZA

Area : 440 m2.Site : Santiago, Chile. Client : SHELL S.A. Project year : 2006Construction year : 2007

BITRAN OFFICE

Area : 200 m2.Site : Santiago, Chile. Client : BITRAN S.A. Project year : 2006Construction year : 2006

2002-2003 Architecture and construction

ARBOL COLOR Architects

SANTANDER BANK BRIDGE

Area : 120 m2.Site : Santiago, Chile. Client : Santander Bank Project year : 2003Construction year : 2003

Stage

Area : 400 m2.Site : Santiago, Chile. Client : MEGA channel Project year : 2003Construction year : 2003

2000-2002 FREELANCE WORK

CODEFF - VISITOR CENTRE

Area : 60 m2.Site : Valdivia, Chile. Client : CODEFF Project year : 2002Construction year : 2003

CENTER FOR INTEGRATED WASTE MANAGEMENT

Architects : Paola Valencia & Ricardo Caroca Site : Valdivia, ChileArea : 300 m2Project y : 2001Construction year : 2002

AGECOMET S.A. OFFICE

Architects : Paola Valencia & Isidora MeierClient : AGECOMET S.A. Site : Santiago, ChileArea : 300 m2.Project Year : 2001Construction year : 2003

LABORATORY HERCULES OFFICE

Architects : Paola Valencia & Verónica ArcosClient : Laboratorios Hércules S.A. Site : Santiago, ChileArea : 120 m2.Project year : 2001

ECOCENTRE – Graduate project

Site : Santiago, Chile

Area : 1400 m2.

Project year : 2000

PAOLA VALENCIA