Post on 14-Apr-2017
Photo Images of Design Built Construction project of NFD Treasury Staff Housing, Stage 2, Kiunga, Western Province PNG
F IGURE 1: CLEARING & GRABBING F IGURE 2: PROFILING F IGURE 3: FOUNDATION, COLUMN E RECTION
F IGURE3A CONSTRUCTION TEAMS F IGURE 3B CONSTRUCTION TEAM
F IGURE 4: F IRST MEETING WITH THE FUNDER WESTERN PROVINCIAL TREASURER MR. THOMSON ALOIS, CONTRACTORS SITTING FAR END RIGHT; SUPERVISOR MR. FRANK JACK, WESTERN PROVINCIAL WORKS DEPARTMENT SITTING IN THE MIDDLE FAR HAND TABLE AND ME (JOHN WILLIE) SITTING IN FONT RIGHT FACING MEETING ATTENDEES.
F IGURE 5: S IGN BOARD
F IGURE 6: STRUCTURAL FRAME F IGURE 7: EXTERIOR WALL CONSTRUCTION
F IGURE 8: ELECTRICAL MSDB F IGURE 9: ELECTRICAL CABLING
`
F IGURE 10: HYDRAULIC FITTINGS & PIPING F IGURE 11: PLUMBING FIXTURE AND FITTINGS
F IGURE 12 WEST V IEWING EASTWARD
Figure 13 Construction of Double Class Building, Ningrum WP, PNG
Other Photo images of my completed Design Built Construction Works 9mile NPF Compound NCD, PNG: Exteriors:-
F IGURE 1: WEST ELEVATION F IGURE 2: SOUTH ELEVATION
F IGURE 3: VIEW FROM WEST TOWARD EAST
Interior of the Family Residential Dwelling
F IGURE 4: KITCHEN
Figure 5: Bath Tub Figure 6: Bath Tub
Figure 7: Staircase going down & Corridor allowing sun light
Figure 8: Children Study & Work Station Figure 9: Bed Room with Wardrobe