Poplar Street Bridge
City Arch River
Consultant Presentation
December 16, 2011
Room 160, St. Louis District Office
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 2/26
MRB Phase 1
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 3/26
MRB Phase 1
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 4/26
PSB Interchange Scope
Remove EB I-70 Ramp
Remove and Replace PSB ramp to Memorial/WB I-70 ramp
Remove and Replace SB I-55 Ramp with New Dual Lane
Ramp
Remove and Replace NB I-55 Ramp with New Dual LaneRamp
Convert I-70 Depressed Lanes from 4-Lane to 5-Lane
Section
Add Auxiliary Lane Between PSB and New I-70 Exit Ramp
to Washington Avenue
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 5/26
2011 Improvements to PSB
d
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 6/26
2011 Proposed PSBInterchange Improvements
20 d S
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 7/26
2011 Proposed PSBInterchange Improvements
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 8/26
I-70 Typical Section in Depressed Area
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 9/26
City Arch River 2015
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 10/26
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 11/26
Land Bridge Over I-70
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 12/26
City Arch RiverLand Bridge Scope
Improvements to I-70, Memorial Drive, and City Streets
Remove and Replace Walnut Street Bridge
Remove Market, Chestnut, and Pine Street Bridges Construct Land Bridge over I-70 Between Market & Chestnut
Remove NB Memorial Drive between Walnut and existing
WB I-70 ramp Remove SB Memorial Drive between Chestnut and Market
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 13/26
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 14/26
Land Bridge Over I-70
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 15/26
City Arch River I-70 Ramps and 3rd Street /MLK Bridge Intersection
Modifications Remove EB I-70 exit ramp to Memorial Drive and Replace
with new EB I-70 entrance ramp from Washington Ave.
Remove WB I-70 entrance ramp from Memorial Drive and
Replace with a new WB I-70 exit ramp to Washington Ave.
Geometric revision to the 3rd Street / MLK Bridge
Intersection.
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 16/26
I-70 Ramps to/from Washington Avenue
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 17/26
3rd Street / MLK IntersectionImprovements
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 18/26
Schedule for CAR
Proposals Due - 1/13/12
Interview Selection- 1/20/12
Interviews- 2/1/12
Final Selection- 2/3/12
Negotiations Done- 3/2/12
Notice to Proceed- 3/9/12
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 19/26
Schedule for PSB
Proposals Due - 1/27/12
Interview Selection- 2/7/12
Interviews- 2/17/12
Final Selection- 2/21/12
Negotiations Done- 3/22/12
Notice to Proceed- 3/27/12
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 20/26
Schedule for Ramps & MLK
Proposals Due - 2/17/12
Interview Selection- 2/24/12
Interviews- 3/2/12
Final Selection- 3/5/12
Negotiations Done- 4/4/12
Notice to Proceed- 4/11/12
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 21/26
AJR and NEPA Process
Combined AJR for PSB / CAR Projects Separate NEPA documents
AJR Submittal to FHWA by end of December
NEPA for PSB Interchange requires Re-Evaluation of NMRB EIS
NEPA for City Arch River requires EA
Approved AJR and Signed NEPA Documents by May 2012 Some Risk in Moving Forward
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 22/26
Contingencies
CAR – Funding from TIGER Grant
PSB- Approval on TIP
ALL 3 – Approval of NEPA and AJR
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 23/26
Diversity
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 24/26
DBE & Workforce
PSB – 20% DBE
CAR (Land Bridge) – 20% DBE
Ramps & MLK – 20% DBE
Monthly Workforce Plan
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 25/26
Baseline Survey
Control Points to be provided by
City Arch River to insure
consistency on all projects.
8/3/2019 Poplar Street Bridge - CityArchRiver Project Consultant Presentation
http://slidepdf.com/reader/full/poplar-street-bridge-cityarchriver-project-consultant-presentation 26/26
newriverbridge.org
http://www.newriverbridge.org/