PMBOK

Data, Information, and Report Flow

Life Cycle

• Predictive– The project scope, and the time and cost required to deliver that

scope, are determined as early in the project life cycle as practically possible

• Iterative and Incremental– project phases (also called iterations) intentionally repeat one or more

project activities as the project team’s understanding of the product increases. Iterations develop the product through a series of repeated cycles, while increments successively add to the functionality of the product

• Adaptive– Adaptive life cycles (also known as change-driven or agile methods)

are intended to respond to high levels of change and ongoing stakeholder involvement. Adaptive methods are also iterative and incremental, but differ in that iterations are very rapid (usually with duration of 2 to 4 weeks) and are fixed in time and cost

Life Cycle

Develop Project Charter and Project Plan

Develop Project Charter …

Organizational Process Assets

Enterprise Environmental Factors

Scope Management• Plan Scope Management

Scope Management

• Plan Scope Management

Scope Management• Collect Requirement

Scope Management• Collect

Requirement

Scope Management• Define Scope

Scope Management• Define Scope

Project Charter and Project Scope Statement

Scope Management• Create WBS

Scope Management• Validate Scope

Scope Management• Validate Scope

Scope Management• Control Scope

Scope Management• Control Scope

Scope Management• Control Scope