Plot3226EF68-541C...2020/09/16  · GRADE PER APPROVED PLOT PLOT AS BUILT BUILDING HEIGHT T=20.00'...

Post on 10-Sep-2020

6 views 0 download

Transcript of Plot3226EF68-541C...2020/09/16  · GRADE PER APPROVED PLOT PLOT AS BUILT BUILDING HEIGHT T=20.00'...

27.4'

27.5'

30.9'

35.8'

29.2'

Pa

ve

r W

alk

Paver Driveway

Paver

Patio

CO

S

S

G

Sprinkler Valve Box

Electric Meter

De

pre

sse

d

B.B

. C

urb

S

Seepage Pits

(Location P/Owner)

4" P

VC

4" P

VC

4" P

V

C

Roof

Leader

Typ.

Paver Pad

& A/C Units

Azzolina & Feury Engineering Inc.PROFESSIONAL ENGINEERS AND LAND SURVEYORS

NOTES:

AREA OF ENTIRE PROPERTY: 12,927 S.F. OR 0.2968 AC.

1.

PROPERTY LOCATED IN THE ZONE A RESIDENTIAL DISTRICT.3.

2.

PROPERTY KNOWN AS LOT 21.01 IN BLOCK 1500 AS PER APPROVED MINOR

SUBDIVISION MAP PREPARED BY AZZOLINA & FEURY ENG. INC., DATED

10-27-17, REVISED TO 3-12-19 IN THE BOROUGH OF HAWORTH.

4. THE VERTICAL ELEVATIONS SHOWN HEREON ARE BASED ON AN ASSUMED DATUM.

ELEVATIONS INDICATED ARE 16.33 FEET HIGHER THAN NGVD 1929 DATUM.

5. BUILDING COVERAGE CALCULATIONS; (25.0% MAX.)

DWELLING = 2,547 S.F. / 12,927 S.F. = 19.7%

6. PAVEMENT COVERAGE CALCULATIONS; (15.0% MAX.)

DRIVEWAY =

PATIO =

WALK =

A/C PAD =

589 S.F.

384 S.F.

185 S.F.

31 S.F.

1,189 S.F. / 12,927 S.F. = 9.2%

7. TOTAL IMPERVIOUS COVERAGE CALCULATIONS; (40.0% MAX.)

BUILDING COVERAGE =

PAVEMENT COVERAGE =

2,547 S.F.

1,189 S.F.

3,736 S.F. / 12,927 S.F. = 28.9%

8. GREEN AREA CALCULATIONS; (60.0% MIN.)

BUILDING COVERAGE =

PAVEMENT COVERAGE =

19.7%

9.2%

28.9% - 100% = 71.1%

9. BUILDING CALCULATIONS; (35.0' MAX.)

135.70

102.41

33.29'

AS BUILT RIDGE ELEVATION

AVG. GRADE PER APPROVED PLOT PLOT

AS BUILT BUILDING HEIGHT

T=20.00'

33.8'

15.1'

29.8'

35.0'

Landscaped

Berm

WV

Sprinkler

Valve Box

Paver

Patio

Sprinkler

Valve Box

G

Seepage Pits

(Location P/Owner)

4" P

VC

Roof

Leader

Typ.

4" P

VC

4

"

P

V

C

Paver

Driveway

CO

Azzolina & Feury Engineering Inc.PROFESSIONAL ENGINEERS AND LAND SURVEYORS

NOTES:

5. BUILDING COVERAGE CALCULATIONS; (25.0% MAX.)

DWELLING = 2,620 S.F. / 12,014 S.F. = 21.8%

6. PAVEMENT COVERAGE CALCULATIONS; (15.0% MAX.)

DRIVEWAY =

PATIO =

WALK =

A/C PAD =

727 S.F.

459 S.F.

206 S.F.

27 S.F.

1,419 S.F. / 12,014 S.F. = 11.8%

7. TOTAL IMPERVIOUS COVERAGE CALCULATIONS; (40.0% MAX.)

BUILDING COVERAGE =

PAVEMENT COVERAGE =

2,620 S.F.

1,419 S.F.

4,039 S.F. / 12,014 S.F. = 33.6%

8. GREEN AREA CALCULATIONS; (60.0% MIN.)

BUILDING COVERAGE =

PAVEMENT COVERAGE =

21.8%

11.8%

33.6% - 100% = 66.4%

9. BUILDING CALCULATIONS; (35.0' MAX.)

134.49

102.50

31.99'

AS BUILT RIDGE ELEVATION

AVG. GRADE PER APPROVED PLOT PLOT

AS BUILT BUILDING HEIGHT

AREA OF ENTIRE PROPERTY: 12,014 S.F. OR 0.2758 AC.

1.

PROPERTY LOCATED IN THE ZONE A RESIDENTIAL DISTRICT.3.

2.

PROPERTY KNOWN AS LOT 21.02 IN BLOCK 1500 AS PER APPROVED MINOR

SUBDIVISION MAP PREPARED BY AZZOLINA & FEURY ENG. INC., DATED

10-27-17, REVISED TO 3-12-19 IN THE BOROUGH OF HAWORTH.

4. THE VERTICAL ELEVATIONS SHOWN HEREON ARE BASED ON AN ASSUMED DATUM.

ELEVATIONS INDICATED ARE 16.33 FEET HIGHER THAN NGVD 1929 DATUM.

Paver

Patio

Paver

Driveway

Pa

ve

r W

alk

Paver Driveway

Paver

Patio

De

pre

sse

d

B.B

. C

urb

20 G

RE

EN

G

IA

NT

S, 6' H

.

Azzolina & Feury Engineering Inc.PROFESSIONAL ENGINEERS AND LAND SURVEYORS

NOTES:

1. REPLACEMENT EVERGREENS MUST BE A MIN. OF 6' HIGH AT TIME OF PLANTING.

2. REPLACEMENT DECIDUOS TREES MUST BE A MIN. OF 2

1

2

" CAL. AT TIME OF PLANTING.

TREE REMOVED

42" SYC.

24" CEDAR

REPLACEMENT RATIO

1 TREE P/6" CAL.

1 TREE P/6" CAL.

NO. OF TREE'S REQUIRED

7 TREE'S

4 TREE'S

NO. OF TREE'S PROVIDED

7 TREE'S

4 TREE'S

TREE MITIGATION SCHEDULE