TO LET . Available nowHigh quality development on one of the most high profile logistics and manufacturing schemes in the North West
Detached units from 44,868 sq ft to 62,952 sq ft Manufacturing/distribution opportunities
M61/J4 GREATER MANCHESTER BOLTON BL5 1BT
www.logisticsnorth.com
Transforming Regenerating Revitalising
Speculative new build
PHASE 1
INVESTMENTM A N A G E M E N T
www.logisticsnorth.com
Transforming Regenerating Revitalising
A RARE OPPORTUNITY LOCATED AT
Logistics North is the North West’s largest live logistics and manufacturing development offering:
. 4 million sq ft of employment space across 250 acres, providing freehold and leasehold opportunities
. M60 and M62 within four miles, providing access to over 21 million consumers within a two hour drive
. Direct access to junction 4 of the M61
. Occupiers include Costa, Greene King, Aldi, MBDA, Komatsu, Whistl, Lidl, Amazon, Northern Building Plastics and Vaclensa
. 550 acre country park also under construction, providing unique surroundings for employees on-site
. 2.5 million sq ft completed or under construction
ALDI, LOGISTICS NORTH
THE BENEFITSHarworth’s model is designed to offer modern flexible business space to companies seeking to relocate to Logistics North, one of the north of England’s largest commercial developments.
Environmental Standard As part of our ongoing commitment to provide buildings which take environmental factors into account, the units will achieve a minimum BREEAM rating of ‘Very Good’.
Specification . Steel portal framed buildings with feature glazing to offices
. Minimum internal heights of 10 metres eaves height
. Electrically operated level access and dock level loading doors
. 50 KN/m2 floor loading
. All mains services and drainage connections . Separate dedicated car parking areas
. Secure service yards with 50 metre depth
. Modern offices / amenities at first floor comprising 5-10% of overall area
. Bespoke fit-out solutions available
. BREEAM rating of ‘Very Good’
. Fully landscaped within a country park environment.
M61
J4
LOGISTICS 175AVAILABLE NOWFUTURE PHASE
PHASE 1 - AVAILABLE NOW
PHASE 2
Manchester 12 miles
PHASE 2 PHASE 3
FFOffices
35000
6400
0
G&FOffices
UnitF2/D
25k
42000
6400
0
G&F Offices
UnitF2/C
30k
72000
FF Offices
Unit F2/G149K
1840
00
69000
FF Offices
Unit F2/H131k
1680
00
FFOffices
FFOffices
cycles
M/C
M/C
cycles
cycles
M/C
© 2016 RPS Group
Notes
1. This drawing has been prepared in accordance with the scope of RPS’sappointment with its client and is subject to the terms and conditions of thatappointment. RPS accepts no liability for any use of this document other thanby its client and only for the purposes for which it was prepared and provided.
2. If received electronically it is the recipients responsibility to print to correct scale.Only written dimensions should be used.
3. This drawing should be read in conjunction with all other relevant drawings andspecifications.
Sherwood House,Sherwood Avenue, Newark, Nottinghamshire, NG24 1QQ
T:+44 (0)1636 605 700 E: rpsnewark@rpsgroup.com F:+44 (0)1636 610 696
Client
Title
Status
Checked byDrawn By
Drawing Number Rev
Project
Project Leader
rpsgroup.com
DescriptionRev By Ckd Date
_
Date CreatedScale@
Eastern ParcelProposed Phasing Layout
Logistics North
SK371
KRP
FNK017492
DEC MJH
Preliminary 20.09.161:1000 A1
10m SCALE 1:1000
Unit F2/B sq m sq ft
Warehouse Total : 4,915.5 52,910.00Offices (1st only, 5%) : 235.9 2,539.21Plant Deck : 189.3 2,037.61
TOTAL (GIA) : 5,340.7 57,486.82
Car Parking : 52 (inc 3 accessible)Dock Levellers : 4Level Access : 2
HGV Parking : 20 (inc 6 loading)
PLOT AREA : 1.145 Ha 2.830 AcresPLOT DENSITY : 45.16%
Unit F2/C sq m sq ft
Warehouse Total : 2,546 27,411Offices (Gnd & 1st, 10%) : 283 3,046
TOTAL (GIA) : 2,829 30,457
Car Parking : 28 (inc 2 accessible)
Dock Levellers : 0Level Access : 3
HGV Parking : 9 (inc 3 loading)
PLOT AREA : 0.726 Ha 1.793 AcresPLOT DENSITY : 38.79%
SCHEDULE OF ACCOMMODATION
Unit F1/A sq m sq ft
Warehouse Total : 5,557.5 59,820.43Offices (1st only, 5%) : 301.9 3,249.62Plant Deck : 197.7 2,128.03
TOTAL (GIA) : 6,057.1 65,198.08
Car Parking : 60 (Inc 3 accessible)Dock Levellers : 4Level Access : 2
HGV Parking : 37 (inc 6 Loading)
PLOT AREA : 1.863 Ha 4.603 acresPLOT DENSITY : 31.45%
Unit F2/A sq m sq ft
Warehouse Total : 3,923.5 42,232.20Offices (1st only, 5%) : 235.9 2,539.21Plant Deck : 189.3 2,037.61
TOTAL (GIA) : 4,348.7 46,809.02
Car Parking : 42 (Inc 2 accessible)Dock Levellers : 3Level Access : 2
HGV Parking : 7 (inc 5 Loading)
PLOT AREA : 0.994 Ha 2.456 acresPLOT DENSITY : 41.84%
Shared Access Roads : 0.371 Ha 0.916 acres
TOTAL GIA : 52,830 m² 568,671 sqft
TOTAL PLOT AREA : 12.261 Ha 30.299 acresTOTAL PLOT DENSITY : 43.09% (excl. shared
space & access roads)
Unit F2/D sq m sq ft
Warehouse Total : 2,122 22,842Offices (Gnd & 1st, 10%) : 236 2,538
TOTAL (GIA) : 2,358 25,380
Car Parking : 28 (inc 2 accessible)
Dock Levellers : 0Level Access : 2
HGV Parking : 10 (inc 2 loading)
PLOT AREA : 0.617 Ha 1.524 AcresPLOT DENSITY : 38.22%
Unit F2/E sq m sq ft
Warehouse Total : 1,620 17,438Offices (1st only, 10%) : 180 1,937
TOTAL (GIA) : 1,800 19,375
Car Parking : 17 (inc 2 accessible)
Dock Levellers : 0Level Access : 2
HGV Parking : 5 (inc 2 loading)
PLOT AREA : 0.478 Ha 1.182 AcresPLOT DENSITY : 37.66%
Unit F2/F sq m sq ft
Warehouse Total : 1,620 17,438Offices (1st only, 10%) : 180 1,937
TOTAL (GIA) : 1,800 19,375
Car Parking : 14 (inc 2 accessible)
Dock Levellers : 0Level Access : 2
HGV Parking : 6 (inc 2 loading)
PLOT AREA : 0.393 Ha 0.972 AcresPLOT DENSITY : 45.80%
Unit F2/G sq m sq ft
Warehouse Total : 13,248 142,601Offices (1st only, 5%) : 687 7,397
TOTAL (GIA) : 13,935 149,998
Car Parking : 135 (inc 7 accessible)
Dock Levellers : 10Level Access : 4
HGV Parking : 49 (inc 14 loading)
PLOT AREA : 2.926 Ha 7.230 AcresPLOT DENSITY : 47.62%
Unit F2/H sq m sq ft
Warehouse Total : 11,592 124,776Offices (1st only, 5%) : 610 6,566
TOTAL (GIA) : 12,202 131,342
Car Parking : 122 (inc 6 accessible)
Dock Levellers : 8Level Access : 4
HGV Parking : 47 (inc 12 loading)
PLOT AREA : 2.592 Ha 6.406 AcresPLOT DENSITY : 47.08%
Unit F2/J sq m sq ft
Warehouse Total : 1,944 20,925Offices (1st only, 10%) : 216 2,325
TOTAL (GIA) : 2,160 23,250
Car Parking : 20 (inc 2 accessible)
Dock Levellers : 0Level Access : 2
HGV Parking : 5 (inc 2 loading)
PLOT AREA : 0.527 Ha 1.303 AcresPLOT DENSITY : 40.99%
A AE MJH 27.10.16Phase areas added
Phase 14.237 Ha / 10.470 acres
Phase 25.803 Ha / 14.340 acres
Phase 32.592 Ha / 6.406 acres
B AE MJH 07.04.17Ownership & development boundaries corrected. Siteconfiguration amended to reflect latest layout
C AE MJH 26.04.17Boundaries amended
D AE MJH 03.05.17Phase 3 Boundary corrected
E AE MJH 05.05.17Schedule amended
F AE MJH 15.05.17Phase 1 schedule amended to match construction issue
21 HGV parking spaces
10 HGV parking spaces 4 dock levellers 2 level access doors
60 car parking spaces
52 car parking spaces
42 car parking spaces
2 levelaccess doors
2 levelaccess doors
4 docklevellers
3 docklevellers
14 HGVparking spaces
2 HGVparking spaces
Warehouse 53,029 sq ft 4,927 sq m
Office 2,527 sq ft 235 sq m
Total 55,556 sq ft 5,161 sq m
96.08m
Warehouse 42,349 sq ft 3,934 sq m
Office 2,520 sq ft 234 sq m
Total 44,868 sq ft 4,168 sq m
F1/A - 62,952 sq ft
50m
50m
50m
Warehouse 59,941 sq ft 5,569 sq m
Office 3,011 sq ft 280 sq m
Total 62,952 sq ft 5,848 sq m
58.57m
64.07m
62.10m
62.08m
80.07m
F2/B - 55,556 sq ft
UNITS F2/A & F2/B
UNIT F1/A
UNIT F1/A
Office
Office
Office
INVESTMENTM A N A G E M E N T
F2/A - 44,868 sq ft
UNDER OFFER
Misrepresentation Act: Particulars contained in this brochure have been produced in good faith, are set out as a general guide and do not constitute the whole or part of any contract. All liability in negligence or otherwise, arising from use of these particulars are hereby excluded. March 2018
reac
hmar
ketin
g.co
.uk
318
49 0
3/18
FANTASTIC ACCESS TO THE WHOLE OF THE UK TRANSPORT NETWORK
Main routesDrive times Distance Journey
M60, Manchester Orbital 4 miles 08 mins
Warrington 20 miles 45 mins
Liverpool 31 miles 56 mins
Leeds 44 miles 1 hrs 17 mins
Birmingham 86 miles 2 hrs 29 mins
London, M25/J21 187 miles 5 hrs 21 mins
PortsDrive times Distance Journey
Liverpool 34 miles 1 hrs 08 mins
Hull 102 miles 2 hrs 56 mins
Immingham 114 miles 3 hrs 19 mins
Southampton 238 miles 6 hrs 53 mins
Felixstowe 256 miles 7 hrs 08 mins
Source: www.drivetimemaps.co.uk Source: ukhaulier.co.uk
www.logisticsnorth.com
Bolton BL5 1BT
LocationThe site lies at the heart of the region’s motorway network being adjacent to junction 4 of the M61.
The M62 is three miles away, providing access to 20 million consumers and 60% of UK businesses within a two hour drive of the site. The M6 is within a 20 minute drive of the site, providing good access to Scotland and the Midlands.
M1
M69M6
M6 Toll
M1
M11
M25
A3(M)
A1(M)
A1(M)
A1(M)
M25M23
M2M26M3
M27
M4M4
M20
M40
M40
M42
M5
M50
M5
M6
M6
M6
A74(M)
M74
M56
M62M61
M62
M180M18
M56M57
M54
M8
HolyheadManchester
Leicester
BirminghamCoventry
Derby Nottingham
Sheffield
Stoke-on-Trent
Liverpool
Southampton
Poole
Bristol
Gloucester
Cardiff
Swansea
Plymouth
Exeter
Cambridge
Norwich
MiltonKeynes
Folkestone
Dover
Felixstowe
London
Middlesbrough
Scarborough
Whitehaven
Dumfries
Carlisle
LeedsImmingham
Grimsby
York
NewcastleUpon Tyne
Edinburgh
Perth
Glasgow
0-1 hr
1-2 hrs
HGV drive times
2-3 hrs
A58
A56
A56
A50A57
A56A6
A6
A6
A664
A635
A5103
A579
A565
A565
A666
A6033A666
A580
A5080
A577A59
A59
A5209
A56
A34
A57
A49
M56
M60M62
M62
M58
M6
M6
M6
M60
A627(M)
M602
M61
M65
M60
M67
M66M62
Manchester
Bolton
Wigan
Warrington
Rochdale
Oldham
Liverpool
St. Helens
Southport
Preston Blackburn
J15J1
J4
LiverpoolJohn Lennon
Airport
ManchesterAirport
LOGISTICSNORTH
LOGISTICSNORTH
LOGISTICSNORTH
LOGISTICSNORTH
LOGISTICSNORTH
LOGISTICSNORTH
TERMS
The units are available on a leasehold basis. Rent on application with the joint agents.
EPC RATINGS
EPC certificates are available on request.
Transforming Regenerating RevitalisingINVESTMENTM A N A G E M E N T
A development by Harworth Group in association with:
0161 828 6440jll.co.uk/property
CONTACT & FURTHER INFORMATION
Steve Johnson steve@b8re.com 07771 888 363
Paul Thorne paul@b8re.com 07798 576 809
Andy Lynnandrew.lynn@eu.jll.com07795 107 469
Richard Johnson richard.johnson@eu.jll.com07980 837 328