Perspective Planning

Post on 14-Dec-2014

4.310 views 1 download

description

this is useful for students-teachers.

Transcript of Perspective Planning

4.3 Perspective Planning

S.G.Isave,Tilak College of Education,

Pune-30

Meaning

• Long term planning of a particular institution covering optimum aspects of the program.

Long term

• One year to five years• Or• Further.

All levels.

• Primary• To• Higher• Or lower and upper levels of the institution.

All stakeholders

• Students.• Parents.• Teachers.• Support staff.• Administrators.

All Activities

• Curricular• Co-curricular.• Extra-curricular.• Evaluation.• In service training.• Administrative works.

All Aspects

• Educational.• Administrative.• Practical.• Financial.• Ethical.• Infrastructural.

Planning

• Well in advanced.• In detail.• Comprehensive.• Based on long term policies.

Thanks !