Pelton Turbines

Chapter Divider with Example Image, Arial 40 pt white

Pelton Turbine –horizontal

MAZIMERU

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PH1c-580/170Output: 251 kWHead: 210 m Speed: 1000 min-1Year: 2007Country: Ruanda

BIASCA

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x PH1c-700/160 Output: 2 x 1489 kWHead: 711 m Speed: 1500 min-1Year: 2010Country: Switzerland

CAKIRMAN

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x PH1c-1400/185Generators Output: 2 x 3546 kWInlet valves Head: 1147 m Hydraulic governors Speed: 1000 min-1Erection and commissioning Year: 2009

Country: Turkey

GLAFKOS

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x PH2C-1100/330 Inlet valves Output: 2 x 2922 kWHydraulic governors Head: 266 m Erection and commissioning Speed: 600 min-1

Year: 2008Country: Greece

SCHWARZENBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PH2c-780/240 Generator Output: 327 kWInlet valve Head: 93 m Hydraulic governor Speed: 500 min-1Intake equipment Year: 2005Erection and commissioning Country: Austria

ALTOFFA TRINKWASSERKRAFTWERK

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PHC1-650/65Inlet valve Output: 163 kWGenerator Head: 544 m Bypass-System Speed: 1500 min-1Electrical equipment Year: 2003Erection and commissioning Country: Austria

SCHILD

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PH2c-1060/115 Inlet valve Output: 1055 kWHydraulic governor Head: 677 m Erection and commissioning Speed: 1000 min-1

Year: 2002Country: Switzerland

Chapter Divider with Example Image, Arial 40 pt white

Pelton Turbine –vertical

GRADEN

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV4C-1040/185Erection and commissioning Output: 2661 kW

Head: 354 m Speed: 750 min-1Year: 2010Country: Austria

FAVINA

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV4C-680/170Generator Output: 1451 kWInlet valve Head: 275 m Digital and hydraulic governor Speed: 1000 min-1Electrical equipment Year: 2011Erection and commissioning Country: Albania

RISI 3

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV4i-770/200 Replacement of 3 units Output: 2479 kW1-nozzle Peltonturbine Head: 381 m

Speed: 1000 min-1Year: 2011Country: Switzerland

SUSASCA

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV4I-770/210Generator Output: 3139 kWInlet valve Head: 356,58 m Hydraulic governor Speed: 1000 min-1Erection and commissioning Year: 2010

Country: Switzerland

DIENTENBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV6I980/300Generator Output: 4734 kWInlet valve Head: 214,79 m Hydraulic governor Speed: 600 min-1Erection and commissioning Year: 2010

Country: Austria

AKSU

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV6I-1122/330 Generator Output: 5207 kWInlet valve Head: 207 m Digital and hydraulic governor Speed: 500 min-1Electrical equipment Year: 2010Erection and commissioning Country: Turkey

KARPI

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV6c-750/260 Inlet valve Output: 1575 kWHydraulic governor Head: 128 m Erection and commissioning Speed: 600 min-1

Year: 2010Country: Greece

VOMPERBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV6i-1030/310 Generator Output: 6219 kWCooling water system Head: 240,88 m Erection and commissioning Speed: 600 min-1

Year: 2009Country: Austria

ALPBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV4i-700/200 Generator Output: 2155 kWInlet valve Head: 324 m Hydraulic governor Speed: 1000 min-1Electrical equipment Year: 2009Erection and commissioning Country: Switzerland

ROHRWIESTEICH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV4i-520/150 Generator Output: 486 kWInlet valve Head: 161 m Hydraulic governor Speed: 1000 min-1Erection and commissioning Year: 2007

Country: Austria

STAMS

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV4c-640/150 Inlet valve Output: 968kWGenerator Head: 242 m Hydraulic governor Speed: 1000 min-1Electrical Equipment Year: 2007Erection and commissioning Country: Austria

KALEN

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 4 x PV6i-930/295 Generators Output: 7825kWInlet valves Head: 290 m Digital and hydr. governors Speed: 750 min-1Erection and commmissioning Year: 2007

Country: Turkey

KERASOVO

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 1 x FSHc-4,62/38Generators 1 x PV4c-640/20 Inlet valves Output: 1 x 1770 kW / 1x 744 kWHydraulic governors Head: 140 m / 141 mErection and commissioning Speed: 1000 min-1 / 750 min-1

Year: 2005Country: Greece

JACOBI

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV4c-780/260 Generator Output: 732 kWInlet valve Head: 100 m Hydraulic governor Speed: 500 min-1Erection and commissioning Year: 2005

Country: Austria

PALIOURI

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x FSHc-7,0 / 51Generators 1 x PV4c-950/330Inlet valves Output: 2 x 3135 kW / 1298 kWHydraulic governors Head: 106,7 m / 105 mErection and commissioning Speed: 750 min-1 / 428 min-1

Year: 2005Country: Griechenland

KÖTSCHACHBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PV6c-930 / 295 Generator Output: 1999 kWInlet valve Head: 126 m Hydraulic governor Speed: 500 min-1Steel structure Year: 2001Erection and commissioning Country: Austria

Contact:Kössler Gesellschaft m.b.H.WasserkraftanlagenHauptstraße 122-1243151 St. GeorgenPhone: +43/2742/885272E-mail: office@koessler.com