PCB REMEDIAL DREDGING: Phase 1 results and

Post on 02-Feb-2016

39 views 0 download

Tags:

description

Courtesy of EPA. Dennis Suszkowski Hudson River Foundation. PCB REMEDIAL DREDGING: Phase 1 results and. relevance to nY /NJ Harbor estuary. Key findings. The Upper Hudson is the dominant source of PCBs to the lower estuary Upper Hudson PCBs are dispersed throughout the Harbor Estuary - PowerPoint PPT Presentation

Transcript of PCB REMEDIAL DREDGING: Phase 1 results and

Dennis SuszkowskiHudson River Foundation

Courtesy of EPA

KEY FINDINGS The Upper Hudson is the

dominant source of PCBs to the lower estuary

Upper Hudson PCBs are dispersed throughout the Harbor Estuary

If PCB loadings continue at current levels, much of the Harbor’s surficial sediments will remain HARS-unsuitable for decades

$0

$50

$100

$150

$200

$250

Millions

Ocean Disposal Land-based

$0

$50

$100

$150

$200

$250

Millions

Ocean Disposal Land-based

from Contamination Assessment & Reduction Project modeling results

Upper Hudson River PCBs are having a profound effect on NY Harbor

The Harbor community needs to pay close attention to remedial efforts upriver

Walter MugdanDirector, Emergency and Remedial Response Division

Region 2 – U.S. Environmental Protection Agency

Report of the Interstate Workgroup on Evaluating Atlantic Coastal Advisories for Recreationally Caught Striped Bass and Bluefish based on PCBs - 10/1/2008

Human Health

Ecosystem Health

Navigation & Commerce