PARKING - pessi.in · Main Power POWER BLOCK External Gas GAS BANKS Raw ... Experienced Erectors -...

Post on 03-Apr-2018

216 views 3 download

Transcript of PARKING - pessi.in · Main Power POWER BLOCK External Gas GAS BANKS Raw ... Experienced Erectors -...

2

ODC Fast Foods Fresher‘s

TRAINING

CENTERS

FOOD

COURTS

OFFICE

SPACES

Employees

GUEST

HOUSES

Two Wheelers

PARKING

LOTS

In-house Restaurants On Job

Training

Four Wheelers Clients

MAIN BUILDINGS

3

Treated

waterRecycling Chillers

CHILLER

BLOCKS

STPUGR

Main Power

POWER

BLOCK

External Gas

GAS BANKS

Raw

Water

Treatment Cooling Tower

NetworkDG

SERVICE BUILDINGS

Food waste

BIO GAS

4

Beams Without

Capital

Hollowcore

PRECASTFLAT SLABSCONVENTIONAL

Bonded

POST TENSIONING

Slabs With Capital Double Tee

Unbonded

TYPES OF CONSTRUCTIONS

CONVENTIONAL COOLING RADIANT COOLING

Radiant Cooling – Hyderabad Building

5

6

MINIMISE USE OF LAND FOR CONSTRUCTION PURPOSE

MINIMUM DISTURBANCE TO EMPLOYEES AND CLIENTS

MOST OF OUR CAMPUSES ARE WORKING CAMPUSES

MMINIMISE LABOUR MOVEMENT

MINIMISE POLLUTION DUE TO CONSTRUCTION ACTIVITIES

7

More Supervisory Staff

PRECASTCONVENTIONAL

Manpower

Less Labour

PRECAST – WHY?

CONVENTIONAL COOLING RADIANT COOLING

More Labour

Less Supervisory Staff

More ExpertiseLess Expertise

8

Less Machinery

PRECASTCONVENTIONAL

Machinery

More Sophisticated

Machinery

PRECAST – WHY?

Simple and Regular

Machinery

More Machinery

9

PRECASTCONVENTIONAL

Safety

Less Pollution

PRECAST – WHY?

More Pollution

Stringent SafetyRegular Safety

10

PRECASTCONVENTIONAL

Quality

Quality Assured due to

Mechanization

PRECAST – WHY?

Quality depends on Human

efforts

Less Supervision RequiredMore Supervision Required

11

PRECASTCONVENTIONAL

Cost

Overall Less

PRECAST – WHY?

Overall More

More on SpecificLess on Specific

12

ERECTION STAGEDESIGN STAGE

THREE STAGES

Coordinate Services

Understand Project

PRODUCTION

Identify Constraints

Meticulous Detailing

Ensure Correct Mould

Understand Drawings

Analyze Connections

Proper Numbering & Coding

Receive Elements

Sequentially

Experienced Erectors -

Patiance

Ensure all Components are

available

Ensure Proper Logistics

PCI TRAINED INSPECTORS

Correct MachineryMeticulous Detailing

Calibration of Equipment

13

MLVP CHENNAI

G + 5 FLOORS

2.50 LAKH SFT

PRECAST COLUMNS,

STAIRS, WALLS,

DOUBLE TEE SLABS

14

MLCP PUNE

B + G + 9 FLOORS 4.5O LAKH SFTPRECAST COLUMNS, STAIRS,

WALLS, DOUBLE TEE SLABS, FINS

15

MLVP HYDERABAD

B + G + 4 FLOORS

1.35 LAKH SFT

PRECAST

COLUMNS, STAIRS,

WALLS,

HOLLOWCORE

SLABS

16

MLCP BHUBANESWAR OLD CAMPUS

G + 5 FLOORS

4.50 LAKH SFT

PRECAST COLUMNS,

STAIRS, WALLS,

DOUBLE TEE

17

MLCP BHUBANESWAR NEW CAMPUS

G + 7 FLOORS

4.65 LAKH SFT

PRECAST COLUMNS,

STAIRS, WALLS,

DOUBLE TEE

CARE TO BE TAKEN IN PRECAST

18

CARE TO BE TAKEN IN PRECAST

20

21

MLVP CHENNAI

COMPLETED PROJECT

CANOPY & FRONT SIDE VIEW OF MLVP

CANOPY – SOUTH SIDE

GROUND FLOOR

DESTRONING ROOM

VEGETABLE ROOM

GROUND FLOOR LIFT LOBBY AREA

RAMP – GROUND FLOOR TO FIRST FLOOR

FIRST FLOOR

FIRST FLOOR – LIFT LOBBY AREA

SECOND FLOOR

RAMP – SECOND FLOOR TO THIRD FLOOR

33

MLCP PUNE

PROJECT UNDER PROGRESS

Front View

3/6/2015 34

Part A –East side

3/6/2015 35

36

Façade Panels

Part A & B East side : Sample Facade Erected

3/6/2015 37

North side :

3/6/2015 38

West side :

3/6/2015 39

Part B:

3/6/2015 40

FOR PRECAST INDUSTRY TO SUCCEED, CARE SHOULD BE TAKEN AS

• PROPER DESIGN AND COORDINATION FROM ALL STAKE HOLDERS

• EXHAUSTIVE PLANNING

• PROPER CONNECTION DETAILS

• CHOICE OF CORRECT PLANT AND MACHINERY

• PRECISE CODING AND INTEGRATING WITH MASTER SCHEDULE

• PRODUCTION TO SYNCRONISE WITH TRANSPORTATION AND ERECTION

• PATIANCE IS THE KEY TO SUCCESS WHILE ERECTION

CONCLUSIONS

41

THANK YOU

www.infosys.com

The contents of this document are proprietary and confidential to Infosys Limited and may not be disclosed in

whole or in part at any time, to any third party without the prior written consent of Infosys Limited.

© 2011 Infosys Limited. All rights reserved. Copyright in the whole and any part of this document belongs to

Infosys Limited. This work may not be used, sold, transferred, adapted, abridged, copied or reproduced in

whole or in part, in any manner or form, or in any media, without the prior written consent of Infosys Limited.