Post on 13-Jan-2016
description
Pacific Aviation Directors WorkshopMarch 13 – 15, 2012
Hosted by: A B Won Pat International Airport - Guam
Federal Aviation Administration
DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION
YAP INTERNATIONAL AIRPORT PRESENTATION
Introduction 1. Completed Projects within the Last five (5)
years 2. UPCOMING PROJECT
4. PROPOSED PROJECT
3.ONGOING PROJECT
• Runway Shoulders, Turnaround and Seal Coating (June 2009 – November 2011)
FRONT VIEW OF THE BLDG. FACING RUNWAY.
• Y.I.A. Aircraft Rescue and Firefighting Facility Project
(April 2008 – February 2010 TURN-OVER CELEBRATION
SOUTHWEST SIDE OF THE BLDG.
SOUTHEAST SIDE OF THE BLDG.
APRON WEST SIDE
• Apron Reconstruction Project (February 2008 – December 2009 APRON EAST SIDE
APRON WEST SIDEAPRON EAST SIDE
• Rehabilitation, Installation of Perimeter Fencing and Upgrading of
lightings and signs(January 2006 – September 2007)
FRONT VIEW OF THE BUILDING FACING VEHICLE PARKING AREA (SOUTHSIDE).
NEW DEPARTURE LOUNGE.
•Y.I.A Terminal Facility Rehabilitation (July 2006 – September 2007).
• Departure Lounge RemodelingDeparture Lounge Remodeling
• New HangerNew Hanger
UPCOMING PROJECTS
Ongoing Projects
AIRPORT MASTER PLAN
• Yap Neighboring Island Airport Projects
Proposed Projects
a. Ulithi Airport
b. Fais Airport
c. Woleai Airport
d. Parking Lot Solar Panel
Installation
e. ARFF Building Solar Panel
Installation
1) PERIMETER FENCING AROUND THE RUNWAY.2) 2 (TWO) WIND CONES.3) RUNWAY LIGHTINGS.4) REHABILITATION OF DAMAGED ITEMS AT THE
TERMINAL.5) STRIPING ALONG THE RUNWAY.
ULITHI AIRPORT
1) PERIMETER FENCING AROUND THE RUNWAY.2) 2 (TWO) WIND CONES.3) PAVEMENT RESURFACING.4) RUNWAY LIGHTINGS.5) CONSTRUCT NEW AIRPORT TERMINAL.
FAIS AIRPORT
1) PERIMETER FENCING AROUND THE RUNWAY.2) 2 (TWO) AIRFIELD WIND CONES.3) PAVEMENT RESURFACING.4) RUNWAY LIGHTINGS.5) CONSTRUCT NEW AIRPORT TERMINAL.
WOLEAI AIRPORT
END OF PRESENTATIONEND OF PRESENTATION
“THANK YOU”“KAMMAGAR MAGAR”