Overview Project Schedule Competition Technology Report Construction Progress Future Work...

Post on 04-Jan-2016

220 views 1 download

Tags:

Transcript of Overview Project Schedule Competition Technology Report Construction Progress Future Work...

Project Advisor Dr. Drew Landman

Team MembersAndrew Tonkovic

Chris ThurmanGreg ShivelyKevin RhamyLucas Mills

Mason HunterkochMichael Laruska

Ryan LaporteSara Mendelsohn

William Fisher

Team LeaderJeremy Newman

SAE Aero East 2015

Overview

• Project Schedule• Competition Technology Report• Construction Progress• Future Work• Conclusion

Project Schedule

Competition Technology Report

• http://dasp.mem.odu.edu:8080/~aero_sp15/TechReport.pdf

Competition Technology Report

Competition Technology Report• Von-Mises Stress of 1.43 ksi• Maximum vertical displacement of 0.017 inches

Competition Technology Report• 10 lbf applied to the front of the mount for a range of frequencies• Test flights show that vibrations induced by the motor did not excite natural frequencies of the motor mount

• Truss Fuselage• Wing• Motor Mount• Tail Section

Construction Progress

Construction Progress

Construction Progress

Construction Progress

• Nose cone• Gussets and ply sections for the fuselage • Tail section/fuselage integration• Wing/fuselage integration• Main Wheel Fabrication• Monokote

Future Work

Future Work

1/8th inch Ply Sections

Gusset Sections

Questions?