Data Center Age Profile

Gartner Group Survey

Legacy Data Centers Challenges

Under Powered - Room or Racks

Inadequate Air Delivery

Inadequate Monitoring Capabilities

Inefficient Cooling

Cabling Challenges

Budget

3

Choices in Handling Change

4

Build Cloud Colocation

The Best Choice May Be To Extend the Life of Your Existing Data Center

Extend the Life of the Data Center

5

FACT: Pressures on cost will increase

Step 1: Unlock hidden or stranded capacity

Assessments & Audits

Under-utilized servers

Virtualization

Decommission servers

Redeploy power & cooling

Step 2: Improve Measuring & Monitoring

Define, Measure, Analyze, Control

Step 3: Densify Your Data Center

Visualize the data center floor

Avocent Data Center Planner

– Inventory Mapping and Planning Tool for Physical Devices in Data Center

– Visualize infrastructure down to the rack

– Model current and future rack capacities

– Track equipment throughout its lifecycle

– Perform “what if scenarios”

Reduce time to provision equipment

Avocent Data Center Planner

– Less time required to plan equipment installs

– Optimize installation based on available space, power & air

Track Rack Capacity - Power, Cooling, Space

Avocent Data Center Planner

– Effectively Manage The Data Center as a System

Extending The Life of Your Data Center

Applications

• Capacity: 20kW • Racks: 3-6 • Key Applications: Small data centers; remote sites

Needs Addressed

• Integrated design • Standardization • Low 1st cost & operating cost • Availability • Speed of deployment

Intelligent, integrated infrastructure in a self contained line-up

Single line of racks

Complete and integrated data center infrastructure

3-6 racks (up to 20kW)

Integrated Cooling

Airflow Management

Fire Suppression

UPS

Power Distribution

Monitoring

SmartRowTM – Airflow Management

SmartRowTM Benefits

• Monitors temperature and controls precision cooling operating levels accordingly

• Monitors equipment for quicker response & resolution Control

• Can be deployed in just weeks: simple in design & deployment

• Local data center experts and service teams for configuration, installation, maintenance, repair

Interoperable

• Room neutral: No effect on existing space

• Reduce cost of installation: no need to undertake expensive upgrades to fire suppression, cooling capacity or flooring

Economical

• Significant energy savings from enclosed precision cooling system, variable capacity and intelligent controls

• Optimizes space efficiency through integrated system Efficient

SmartRowTM Design & Cost Example

Conventional Design 18 kW, 288 sq ft 1 rows, 6 racks Ceiling mounted ducted cooling (6) 5 kVA UPS Room renovation, fire suppression

Situation: deploy 18 kW of IT to a non-IT ready room

SmartRow 18 kW, 288 sq ft 1 row, 6 racks 1 Liebert Challenger 6 Liebert GXT 5 kVA Room neutral

Conventional SmartRow Cost Savings % Savings

Room Costs contractor, installation, engineering services

$60,000 $43,000 $17,000 28%

Infrastructure Equipment UPS, distribution, cooling, racks, fire suppression

$105,000 $109,000 -$4,000 -3%

Total CapEx $165,000 $152,000 $13,000 8%

Annual Energy Consumption power & cooling equipment energy use

$8,800 $6,400 $2,400 27%

5 Year OpEx $44,000 $32,000 $12,000 27%

5 Year TCO $209,000 $184,000 $25,000 12%

SmartRowTM Cost Comparison

Room Savings

Equipment Savings

Energy Savings

Room neutral, fewer services to retrofit room into an IT space

Pre-engineered, integrated precision cooling, ducting, distribution and fire suppression

Airflow management, variable capacity, intelligent controls

Applications

• Capacity: Most cost effective up to 400kW

• Floor: Raised, non-raised • Applications: Small and medium

data centers; high-density zones

Needs Addressed

• Efficiency: OPEX & CAPEX • Flexibility • Availability • Standardization • Interoperability

Intelligent, integrated infrastructure using row-based building blocks

Leveraging Avocent firmware expertise

Mission: Continue to Connect to Everything Regardless of Vendor

Digital Rack Interface Pod • Provides Digital KVM access

• Powered directly from server

• Backup power provided by

Universal Management Gateway

• Based on Avocent ASIC

technology

Universal Management Gateway

Trellis Universal Management Gateway

• Provides KVM and Serial Access

• Integrated or stand-alone

• Connects directly to Service Processors

• Supports Environmental Sensors

• Collects data from connected devices

and feeds data to the Trellis software

Trellis Platform 1.0 Facilities Capabilities

Site Management

• Alarm/event management and notifications

• Device operating status and data trends

• Environment and site conditions

Energy Management

• Data center efficiency metrics including PUE

• Energy consumption (kW/hours) and costs

• Sub-system efficiency losses

Power Systems Management

• Dependencies of the complete power system

• Power system resource utilization and capacity

• Active power path status

Cooling Systems Management

• Dependencies of the complete cooling system

• Cooling system resource utilization and capacity

• Cooling target zone management

Capabilities Will Be Bundled Into Value-Driven Offerings

EMERSON NETWORK POWER’S DATA CENTER INFRASTRUCTURE MANAGEMENT SOLUTION OFFERINGS NOTIONAL OFFERINGS TO BE OFFERED

• Minimize energy

• Identify energy

inefficiencies

• Understand IT

services TCO

• Optimize resource

utilization

• Improve process

efficiency

• Centralize IT

equipment access

• Understand data

center asset

inventory

• Plan future IT

services

• Optimize IT

resource

deployment

• Model deployment

scenarios

• Reduce vendors

• Control / log IT

systems access

• Control physical

access to data

center

• Meet

government /

industry energy

efficiency

standards

• Predict outage risks

• Monitor facilities / IT

dependencies

• Automate impact

analyses

• Reduce MTTR

• Eliminate risk with

root cause

analyses

• Identify redundancy

gaps

Efficiency &

Cost Availability Capacity

Planning &

Agility Compliance

Customer Benefits

Simplify complex eco-system management

SmartAisle at the DVL Efficiency Lab

115 Sinclair Road Bristol, PA 19007

SmartAisle at Microsoft Technology Center

45 Liberty Blvd. Malvern, PA 19355

Key Takeaways

24

1. Pressures on data centers will continue to accelerate.

2. Address your data center as a System.

3. Implement DCIM to make informed decisions

4. Improve efficiency across the entire operation

5. Evaluate SmartSolutions™